Laserfiche WebLink
PUBLIC KIRKS PERMIT Date: 9/29/2014 <br /> '`` <br /> City of Everett Public Works Department Public Works Permit#: PW1409-033 <br /> _.��.�. 3200 Cedar Street Building Permit#; C1409-010 <br /> 4 ; Everett, WA 98201 Planning Reference#: <br /> (425)257-8810 <br /> Public Works Fee$: $ 965.00 <br /> Other $: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> NORTHLAKE COURT LLC <br /> 17921 BOTHELL EVERETT HWY <br /> iiTELL WA 98012 <br /> PHONE: PHONE: 15 Z r <br /> TAX PARCEL ID# 28051900103200 SITE ADDRESS: 10605 :PeSE <br /> DESCRIPTION OF PROPOSED WORK: <br /> TRAFFIC MITIGATION &PW FOR NEW TOWNHOME UNIT <br /> SEPA10-004 NORTHLAKE C <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. Connect side sewer per City Standard#'s 601, 602, 604. <br /> 5. Connect rooftop downspouts to the drainage system provided for this lot. <br /> 6. Install erosion control measures as determined by the Public Works inspector, such as silt fence, straw bales, N <br /> swales, or erosion blankets. ll <br /> 7. All excavated material from foundation, sidewalk and driveways shall be hauled to an approved, permitted site. CA <br /> No wasting of material is allowed on this building lot. <br /> 8. No dirt, mud, rocks or debris to be tracked onto roadway. <br /> 9. No building materials to be stacked on sidewalk/roadway and sidewalk/roadway to be kept clean and open for C <br /> pedestrian travel. <br /> Pave from garage door to private street. 4 <br /> 3 2 U E , <br /> DEC 3 1 2014 L cA <br /> C Y 01 :Emil' <br /> P.( <br /> '_'eim:t _vices <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and <br /> save harmless the City of Everett from any and all claims for <br /> damages, costs, expenses, or causes of action that may arise <br /> because of installation and maintenance of the improvement <br /> , A!/ l'- -/.9cor other right-of-way use hereto applied for and further agrees <br /> Approved for onstr ction Date to remove same upon o'.- fro the City and to replace <br /> Pppublic property.da -s-: ereb <br /> FINAL INSPEC ,• Date ___ ." � Z� Oj <br /> Approved as Constructed Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />