Laserfiche WebLink
„,,'',M ,A INSPECTION REPORT <br /> 0\ 1l-Ss6 <br /> Date: 106 Permit: �1 2 \\5 <br /> Contractor: \C.?'”\/7)? <br /> Owner: �`��! � Q^' <br /> Site Address: U15tO ` \g <br /> -lifrl—VieTYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑G unding ❑Insulation ❑Mechanical Final ❑ Medical Gas <br /> ❑ eiling Grid ❑Drywall Nailing ❑ Plumbing Final <br /> ▪ lectrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> PPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS P MIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Inspector. Date: - (S— <br /> EIR(4/09) / Nay ..L•. FORMS&PR•MOTIONS•425/488-8900 <br />