Laserfiche WebLink
INSPECTION REPORT <br /> A� i <br /> Date j// e Permit: 01602'rt 9 <br /> Contractor: Y <br /> Owner: '-e-e9ah4, TIP 2-4c- <br /> Site <br /> -4CSite Address: 42t. � +P? S --_ —___ - — <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> lectrical Final E WORK <br /> ❑Shear Nailing GAS PIPE <br /> S ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building�Finall ❑Gas Pipe Final ❑HWT Final <br /> j( <br /> •THER OR CONSULTATION: `L®' l I 5'2b <br /> '�'PROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PE <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> • OK FOR C.O. ❑ VIOLATION <br /> 44UNABLE TO PERFORM INSPECTION: <br /> ft,,. CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> 7/ <br /> /! ` at <br /> I% rito <br /> Inspector: / Date: AM ,' <br /> EIR(10/06) DATABAR,INC. <br /> s <br />