My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1417 105TH PL SE BLDG H 2019-09-12
>
Address Records
>
105TH PL SE
>
1417
>
BLDG H
>
1417 105TH PL SE BLDG H 2019-09-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 3:06:26 PM
Creation date
9/12/2019 3:06:23 PM
Metadata
Fields
Template:
Address Document
Street Name
105TH PL SE
Street Number
1417
Tenant Name
BLDG H
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> PUBLIC WORKS <br /> October 13, 2014 <br /> Project: Northlake Court Townhomes, Building H <br /> Job Address: 105th PL SE <br /> Plan Review No: C1409-052 through 055 <br /> In response to your application for a construction permit, your plans have been examined and <br /> you are advised that a permit cannot be issued until the following issues are resolved. These <br /> comments address building issues only. Additional revisions or additions may be required by <br /> other departments (such as Utilities,Planning or Fire). All references refer to the 2012 <br /> International Residential Code (IRC), as amended by the State of Washington and/or the <br /> Washington State Energy Code, 2012 edition,unless noted otherwise. <br /> In order for the processing of your application to continue, it will be necessary to provide <br /> the Building Division with two sets of drawings reflecting the corrections requested. <br /> 1. Detail 3a/A4.2 shows fire-rating treatment at the floor to wall intersection. The detail appears to <br /> be for a one-hour wall however and the project requires a two-hour wall assembly. Section <br /> R302.2 <br /> 2. The roof of unit 2 is shown to be at least 30"above the roof at unit 3. The wall continuing above <br /> unit 3 to the underside of the roof of unit 2 should be shown to be of not less than one-hour <br /> construction (5/8"gyp sheathing should be shown on exterior side of the attic wall at the step roof <br /> condition). Section R302.2.2 <br /> 3. The two, one-hour walls separating the dwelling units requires mineral fiber per GA No. 3644. <br /> Wall section 3/A4.2 should be revised to show this requirement or a different fire-resistive wall <br /> assembly should be provided. Section R303.2 <br /> 4. The site plan shows approximately 10 feet between buildings G and H. Based on that distance, <br /> the eves parallel to the assumed property line should be protected on the underside by one-hour, <br /> fire-resistive construction. Section R302.1 <br /> 5. An additional 20-minute door(or approved alternate) should be added to create a hallway <br /> between the `storage' rooms and garages on the lower floors. The doors into the storage rooms <br /> could then be reduced to a non-rated passage doorway and note stating 'rooms not to be used as <br /> sleeping rooms' should be removed from the plans. Section R302.5.1 <br /> a. The CO alarms should be shown in the (new) hallway outside of the sleeping rooms on <br /> the first floor. Section R315.1 <br /> b. An additional smoke alarm should be shown in the (new) hallway outside of the sleeping <br /> rooms on the first floor. Section R314.3 <br /> 6. The 2'6"x2'6" slider in the master bathroom o 't#1 should be shown as safety glazing. Section <br /> R308.4.5 <br /> 7, <br /> CITY OF EVERETT• 3200 Cedar Street• Everett, WA 98201 • (425)257-8800 • Fax(425)257-8882 <br />
The URL can be used to link to this page
Your browser does not support the video tag.