Laserfiche WebLink
r <br /> f <br /> Dec. 08 th, 2014 <br /> ARCHITECTURAL DESIGN <br /> ASSOCIATES, PS, <br /> Tony R. Lee, Building Official <br /> Jeff Heilman, Plans Examiner <br /> City of Everett, Building Department <br /> Permit Services Public Counter <br /> 3200 Cedar Street, 2nd Floor <br /> Everett WA 98201 <br /> Project Name: Pacific Ridge Homes, Northlake Court Townhomes Building 'H' <br /> Project#: C409-040 thru 043 <br /> Dear Mr. Lee, <br /> Pursuant to the Comment Letter dated October 13th 2014. Below you will find the <br /> listed revisions referenced in the accompanying Plans & Calculations. <br /> Comment Notice #1 <br /> Review Type BUILDING Date October 13, 2014 <br /> Project Address 105th PI SE Reviewer Tony Lee <br /> Address City of Everett Building Department Reviewer Phone (425) 257-8810 <br /> Permit Services <br /> 3200 Cedar Street, 2nd Floor Reviewer Email <br /> Everett, Wa 98201 <br /> Codes Reviewed <br /> This project has been reviewed for conformance with the 2012 International Residential Code <br /> (IRC), as amended by the State of Washington and/or the Washington State Energy Code, 2012 <br /> edition, unless noted otherwise. <br /> Comments w/corrections <br /> 1.Detail 3a/A4.2 shows fire-rating treatment at the floor to wall intersection. The detail <br /> appears to be for a one-hour wall however and the project requires a two-hour wall <br /> assembly. Section R302.2 <br /> a) Detail 3a/A4.2 has been revised to reflect the requirement of a 2-Hr wall assembly <br /> 2.The roof of unit 2 is shown to be at least 30" above the roof at unit 3. The wall continuing <br /> above unit 3 to the underside of the roof of unit 2 should be shown to be of not less than <br /> one-hour construction (5/8"gyp sheathing should be shown on exterior side of the attic <br /> wall at the step roof condition). Section R302.2.2. <br /> Detail 4 on sheet A4.1 showing the 1-hr requi -d assembly has been add to the set and <br /> 3 <br />