Laserfiche WebLink
EXHIBIT A <br /> SCOPE OF WORK <br /> The purpose of this contract is to provide professional material testing and inspection services for the Everpark <br /> Garage Structural Repairs Project located at 2823 Hoyt Ave.,Everett, WA 98201. <br /> The scope of services for this project are to provide material testing and inspection services as follows: <br /> 1. 03 0130 3.12 Maintenance of Cast-in-Place Concrete and Testing: <br /> a.Test/Inspection: <br /> Visits Hours Per Visit No. of Tests <br /> Compressive Stregth Specimens 10 sets of 4 2x2s 40 <br /> Core Drilling of Filled Cracks&Joints 3 4 <br /> Core Drilling Assistant 3 4 <br /> Sampling&Inspection of Mixing&Placement 10 4 <br /> 2. 07 92 00 3.4 Joint Sealant and Testing: <br /> a.Test/Inspection Item: <br /> Visits Hours Per Visit No. of Tests <br /> Inspection of Sealant Application&Pull Testing 6 4 <br /> 3. 03 0130 72 3.3 FRP Inspection and Testing: <br /> Perform field bond testing. (Coring,Equipment set-up,epoxy of test pucks,and pull testing.) <br /> Perform Tensile Strength Testing. (Subcontracted Lab) <br /> a.Test/Inspection: <br /> Visits Hours Per Visit No.of Tests <br /> Inspection&Tensile Strength Specimen Sampling 15 4 <br /> Bond Testing 5 6 <br /> Sub Lab: Tensile Tests 4 <br /> SCOPE OF WORK CONT. <br /> 4. OTHER: <br /> Visits Hours Per Visit <br /> Project Manager 10 <br /> Trip Charge(40 mi x.060/mi) 39 <br /> Report Preparation and submission <br /> TOTAL MAXIMUM COMPENSATION <br /> Everpark Garage Structural Repairs: <br /> 1. 03 0130 3.12 Maint. of Cast-in-Place&Testing $ 6,020.00 <br /> 2. 07 92 00 3.4 Joint Sealant and Testing:: $ 1,800.00 <br /> 3. 03 0130 72 3.3 FRP Inspection and Testing: $10,640.00 <br /> 4. Project Management: $ 1.936.00 <br /> Add'l Services Contingency: $ 2,500.00 <br /> Reimbursable Expense: $ 500.00 <br /> Total Maximum Compenation: $23,396.00 <br /> Page 12 <br /> (Form Approved by City Attorney's Office January 7,2010,updated July 23,2018) <br />