My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
709 80TH ST SW CLEARWIRE WIRELESS ANTENNA 2018-01-02 MF Import
>
Address Records
>
80TH ST SW
>
709
>
CLEARWIRE WIRELESS ANTENNA
>
709 80TH ST SW CLEARWIRE WIRELESS ANTENNA 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2022 3:37:15 PM
Creation date
9/16/2019 11:25:40 AM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
709
Tenant Name
CLEARWIRE WIRELESS ANTENNA
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPROVAL BLOCK /� <br />Plan Gleck No.: B0603-003 (I 1 <br />Job Address: 709 BOTH ST SW <br />Owner: AMERICAN TOWER CORP clear <br />Tenant: CLEARWIRE <br />i Application Date: 3/3/2006 <br />Proposed Use: D <br />Type of work: ANTENNAS /CLEARWIRE 882LWASH%M <br />Office Set Job Set—Fire/Planning Se <br />Approved For Permit: DatC:, �Ui -cn By: fT� Site Number: WA-SN0201-A <br />LJ RIC <br />PRODUCTION LEAD GATE <br />Site Name: 80TH SW AM. TOWER STA <br />LANDLORD OATS <br />DRAWING INDEX VICINITY MAP PROJECT INFORMATION <br />SHEET CONTENTS REV p SCOPE OF WORK: AN UNMANNED TELECOMMUNICATION FACILITY INCLUDING NEW CLEARWIRE <br />¢ ANTENNAS ON AN EXISTING LATTICE TOWER AND A SITE SUPPORT <br />—T01 TITLE SHEET 0 "' 9 �( CABINET MOUNTED ON A CONCRETE SLAB. <br />—NO1 GENERAL NOTES 0 17Ln� <br />HA, SIM <br />r -) I SITE ADDRESS: 709 BOTH SW <br />—000 SITE SURVEY 0 iN$ 1 EVERETT. WA 98201 <br />—001 SITE PLAN & ARCHITECTURAL SITE PLAN 0 ` <br />—0O2 ENLARGED SITE PLAN & ELEVATION 0 PROJECT me"` BUILDING OWNER: AMERICAN TOWER CORPORATION <br />11TH FLOOR I18 HUNTINGTON AVE <br />±.i r , BOSTON. MA 02116 <br />—0O3 EQUIPMENT DETAILS 0 SITE - <br />-004 CONSTRUCTION DETAILS 0 Ta+ 1. r PH: 3303) GEORGE5--501 ��s <br />—EO1 ELECTRICAL, GROUNDING PLAN & DETAILS 0 <br />APPLICANT: CLEARWIRE LLC <br />— ` , JURISDICTION: ZO SNOHOMISH COUNTY <br />i— <br />PROPOSEDCURRENT 20NE: MM <br />CURRENT USE TELECOMMUNICATIONS FACILITY <br />PROPRIETARY NOTE: — Y.-USE: TELECOMMUNICATIONS FACILITY <br />THE INFORMATION CONTAINED IN THIS SET OF DRAWINGS IS PROPRIETARY BY NATURE, ANY USE OR - �``-^ PROPERTY OWNER: AMERICAN TOWER CORPORATION <br />DISCLOSURE OTHER THAN THAT WHICH RELATES TO CLEARWIRE SERVICE IS STRICTLY PROHIBITED. 11TH FLOOR 116 HUNTINGTON AVE <br />_ _.wi rte _ _.__� _` BOSTON. MA 02116 <br />CONTACT: GEORGE GUNATSIS <br />SYMBOLS & ABBREVIATIONS UTILITY CONTACTS PH: (303) aes—osol e <br />IN) NEW _ PARCEL : 004123000007DO <br />[E] EXISTING POWER COMPANY DRIVING DIRECTIONS: SITE QUALIFICATION PARTICIPANTS <br />CENTER LINE SNO-PUD <br />PROPERTY LINE (425) 347-4390 <br />—X— FENCE LINE HEADING NORM ON 1-405 TO 1-5 VANCOLNEF; EXIT ONTO SR-526; LEFT OFF RAMP ONRO SR-526; h&ML COMPANY NUMBER <br />TELEPHONE COMPANY RIGHT ONTO RAMP WAY; TURN LEFT (SOUTH) ONTO EVERGREEN WAY; RIGHT (WEST) ONTO CASINO <br />—G— GROUND WIRE A/E RICH WILL HALL ARCHITECTURE (125) 802-1219 <br />VERI20N ROAD: TURN RIGHT (NORM) ONTO STH AVE W ROAD; NAME CHANGES TO MARDESON RD; TURN LEFT <br />—OHP— OVERHEAD POWER (800) 483-50D0 (WEST) ONTO BOTH ST SW; TOWER ON THE R01HT SIDE OF ROAD. SAC ERIC FREDERICK ALTAIR (214) 687-8678 <br />—014T— OVERHEAD TELCO <br />CONSTRUCTION JERKY ROPER ALTAIR (360) 60B-8808 <br />—IIGP— UNDERGROUND POWER CONDUIT <br />--LOT— UNDERGROUND TEL(O CONDUIT Al all new services & grounding trenches, LANDLORD GEORGE GUNATSIS AMERICAN TOWER CORP. (303) 885-0501 <br />provive'YARNING" tape at 12" below grade. SITE GPS COORDINATES: PERMITTING JERKY ROPER ALTAIR (360) sag -am <br />®C A L L RF ENGINEER: LEO THOMASIAN CLEARWIRE (817) 945-4509 <br />�j "CALL BEFORE YOU DIG" LATIIUPE (NAD 93): N 47' 55' 34.76' <br />1-800-424-5555 LONGITUDE (NAD 93): W 127 14' 33.91" <br />AUTILITY NOTIFICATION CENTER OF WASHINGTON STATE GROUND ELEVATION: 571.5'(3) AMSL <br />H A L L K • HALL ARCHITECTURE <br />:' O Q 0 T 4 03-03-06 SUBMITTAL SET PHD PMD RBH BOTHELL, WA <br />ALTIU c l e a r w r e BOth SW Am. Tower ARCHITECTURE 3 11-01-05 REVISED FINAL CONSTRUCTION DOCUMENTS PHD PHD RBH <br />North Creek Offke Center WA—SN0201—A 2 10-14-05 FINAL CONSTRUCTION DOCUMENTS CEC PMD RBH TITLE SHEET <br />19119 North Creek Parkway, Suite 105 5808 LAKE WASHINGTON ELVD. 1 10-04-05 PRELIMINARY CONSTRUCTION DOCUMENTS PHD PMD RBH <br />C0111I111II11(Alion Scnires, 111C SUITE 500 709 BOTH SW <br />Bothell, WA 98011 KIRKIANDWA 98033 EVERETT. WA ga:Ot NO. DATE REVISIONS BY CHK L�P'D DRAWING NUMBER REV <br />, <br />ph: (425) 415-0746 fox: (425) 415-0799 SCALE: /S SHOWN I DESIGNF.D BY. PHD DRAWN BY: PHD WA—SN0201—A— T01 0 <br />0 5 4 3 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.