�1�
<br /> LEGE�ID
<br /> SEE SYMBOL AND MATERIAL LEGENDS ON SHEET G1 .
<br /> CONVEYER
<br /> O � 1 � \c� ( (�1 � --j i X SHOP FENCING AND GATES
<br /> �; ; , _ �
<br /> ' " ''� 50'-0" 50'-0" �'� FLOOR STRIPING
<br /> - 22 -9 R.O. 2�_� ��2�� i II LADDER I �( � TRENCH COVER
<br /> 1 ' 10 1/2" ' 6'-7 1/2" 14' 0" V.I.F. ----J � �,
<br /> � - ,
<br /> __V,I.
<br /> F.___ _- _. _ _ 1 - _ __ _ _--- �.___ __-- -- __ __ _ ----- ___-- _ - ---- __ - _ ____ .____ ___ � - _---- - __ _-_ ___ _ ___ - -- _ _- _ _
<br /> --- ___ . __ __ ��.
<br /> � ,
<br /> � � �
<br /> � - � ' GENERA� NOTES :
<br /> W3 3 W4
<br /> - - ---_-- - - _-- --- - -_ _---- --- - -_ ____ __- --. _-- - - --
<br /> ---------- - — - - - - � `
<br /> ____ � �w� STORM . �-SPRINKLER � '
<br /> 1 4 3 2 3 �' VENT. DRAIN SYSTEM I
<br /> � 5 ; 0
<br /> DOOR HEATER WALL HEATER '' WALL HEATER WALL HEATER
<br /> ' SUPPORT ', SUPPORT ,
<br /> SUPPORT SUPPORT. i
<br /> REFER TO � CONSTRUCTI0 �1 NOTE .
<br /> MECHANICAL. I I � � 1 REMOVE EXISTING PRECAST CONCRETE PANELS AND
<br /> � ' ' i N � SIDING TO ACCOMMODATE NEW HIGH SPEED OH
<br /> ' COILING DOOR.
<br /> j I � REMOVE EXISTING OH DOOR, TRACK AND HARDWARE,
<br /> AND CONTROLS. COORDINATE WITH BOEWG FOR ANY
<br /> , � FUTURE RE-USE REQUIREMENTS. COORDINATE WITH
<br /> � I _ STRUCTURAL AND ELECTRICAL DRAWINGS FOR
<br /> I ADDITIONAL INFORMATION.
<br /> _-- ----_ ____ ___ _.__ ____ _.__ _.. ___ _.____ ___ __.- --.__ --- � -- _ _ _ '� �,,-, -
<br /> ___ _ _ _ ___ _ ___ _ _ ___ - ,
<br /> �, _ 3�j CUT AND REMOVE EXISTING BOLLARDS DOWN BELOW
<br /> � EXISTING SLAB. PATCH AND REPAIR SLAB AS
<br /> �I � REQUIRED.
<br /> � � � FORTREMOVALTOFCOORBESTOS SPDINIGLAND�L ADM PAI T,
<br /> � BASED ON FIELD VERIFICATION WITH BOEING.
<br /> ; �i � CONTRACTOR TO COORDINATE NEW LOCATION OF WALL
<br /> �, N HEATER AND SUPPORT WITH NEW OH DOOR LOCATION.
<br /> �i i REFER TO STRUCTURAL, MECHANICAL AND ELECTRICAL
<br /> � I i I DRAWINGS FOR ADDITIONAL INFORMATION.
<br /> � 6. ALL WORK IN AREAS AFFECTING EXISTING OPERATION OF
<br /> ' THE FACILITY SHALL BE COORDINATED WITH OWNER
<br /> ' PRIOR TO COMMENCEMENT.
<br /> o ' 7
<br /> a __ ----- -----------._ _.___---- -----._ - ----- ----- --___ _---- --- _ ._ ____ _ ___ __ � _ __ . CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS
<br /> �- --___ __ _ _ _. __ _ __.. ----- __ _ ___ ._ _-
<br /> _ ___- -- _ ___ _._ - � -
<br /> � AND COORDINATE DEMOLITION ACCORDINGLY. CONTRACTOR
<br /> w SHALL NOTIFY ARCHITECT OF ANY CONDITIONS THAT ARE
<br /> � ', ' SUBSTAINALLY DIFFERENT FROM THOSE SHOWN HEREIN
<br /> Z � ' PRIOR TO COMMENCING WORK.
<br /> � , ' 8. CONTRACTOR SHALL PROVIDE CONTINUOUS WEATHER
<br /> z ; ' I
<br /> PROTECTION OF EXISTING STRUCTURES THROUGHOUT
<br /> o I '', I o CONSTRUCTION.
<br /> 9. PROTECT ALL BUILDiNG COMPONENTS TO REMAIN IN
<br /> � N ORDER TO PREVENT DAMAGE DURING DEMOLITION AND
<br /> � '�, , CONSTRUCTION.
<br /> i � 10. DURING CONSTRUCTION, BARRICADE EXISTING DOORS
<br /> ,�, , I THAT ADJOIN AREA OF WORK. REMOVE ALL ILLUMINATED
<br /> z I I
<br /> � � EXIT SIGNS AND OTHER SIGNAGE DIRECTING BUILDING
<br /> � ,
<br /> � ; -- OCCUPANTS TO AFFECTED DOORS. PROVIDE ALTERNATE
<br /> _ ,
<br /> Q __ __ _. _ , �. � � TEMPORARY MEANS OF EGRESS ACCEPTABLE TO THE
<br /> � _ _--- ___ _ __ ____ _ -- - _ __ __ _ -___- _- _ - — -- - - — ------ _ ___ _ _ __ _ _ --- _ ___ _ __ _._ _ � � :
<br /> -� AUTHORITY HAVING JURISDICTION AND BOEING FIRE
<br /> � '� AND SECURITY.
<br /> � ' � 11 . CONTRACTOR TO VERIFY WITH PRECAST CONCRETE PANEL
<br /> I �
<br /> MANUFACTURE THAT CU171NG PANEL DOES NOT CAUSE
<br /> � THE PANELS TO BE OVERSTRESSED DUE TO APPLICABLE
<br /> LOADS. ADDITIONAL SUPPORTS MAY BE REQUIRED.
<br /> , ' 0 12. CONTRACTOR TO PROVIDE TEMPORARY STRUCTURES FOR
<br /> � ' � N CONTAINMENT OF DEBRIS AND WEATHER PROTECTION
<br /> � , � DURING WALL REMOVAL AND DEMOLITION.
<br /> ' 13. CONTRACTOR TO COORDINATE REMOVAL OF EXISTING MEP
<br /> , EQUIPMENT. COORDINATE SPECIFIC REQUIREMENTS AND
<br /> ' ' CONSTRAINTS WITH OWNER.
<br /> �, �
<br /> ____ __ l
<br /> 6.5 8 9.5 11
<br /> x x � � x x � � � -� x x __ _. _ __ _ __ __ _ __ __ ,.
<br /> � '', � `�-�
<br /> ' 1A10 1A11 1Al2
<br /> '' � C.5
<br /> � '��, ' RE�ERENCE DRAWI �IGS 1A13 1A14 1A15
<br /> 0
<br /> � -O
<br /> N COORDINATE WITH STRUCTURAL, ELECTRICAL AND
<br /> '� MECHANICAL DEMOLITION DRAWINGS.
<br /> 1A16 1A17 1A18
<br /> I
<br /> � � 8' 4' 0 4' 8' 16' H.5
<br /> �' � 1A19 1A20 1A21
<br /> ___
<br /> �,
<br /> -. -- SCALE: 1/8"=1 '-0" �
<br /> �� __ ___ `�_ � -_�. __ �� ' -- � \ "
<br /> MATCHLINE - FOR CONTINUATION SEE 1A14 -
<br /> KEY PLAN BLDG. 40-053 �
<br /> SCALE: NONE
<br /> �`s
<br /> �_:
<br /> R EM O�A� - PARTIA� P LAN �I EW
<br /> N �
<br /> SCALE: 1/8"=1 ,_0„ �
<br /> www.brph.com Copyright o 2016
<br /> Architects, Engineers, Constructors
<br /> PROFESSIONAL STAMP & SIGNATURE 1902033rdAveW,Suite530 StateofWashington
<br /> APPLIES TO WORK WITHIN THE CLOUDED L nnwood,Washin ton,98036 CertifcateofAuthorization
<br /> Y 9 Architecture No.603235512
<br /> REVISION AREAS ONLY AS INDICATED 425-921-3500 EngineeringNo.3137
<br /> DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE
<br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE 4520 ACCEPTABILITY KML 08 17 16 REMOVAL PARTIAL FIRST FLOOR PLAN 16124 O 08/17/2016
<br /> 0 Issue For Construction (Crane Relocation)(031-053)(16124) KML JTH 08/17/16 THIS DESIGN AND OR CHECKED \
<br /> �cxIT�c D SPECIFICATION IS APPROVED BRPH 08 17 16 SHEEf :
<br /> ; � ;2,eSTP�'081 ,-o�,o � T, APPROVED BY DEPT. DATE JTHIN o8 �� �s TITLE FACTORY TRANSFORMATION REPURPOSE CRANE BRDGE 20 1 A11 R -209 `
<br /> BOE,�� CHECKED <
<br /> ' H APPROVED B U I LD I N G 40-053 JOB N0. COMP N0. _
<br /> sTATE oF wAsxzNCTON WO 15/2899-209
<br /> APPROVED DWG N0.
<br /> ARCHITECTURAL MASTER COL. A-C.5/8-9.5 EVERETT, WA 40-053-1A11R-209
<br /> w
<br />
|