|
;=�,
<br /> �
<br /> �
<br /> r�
<br /> O "
<br /> �EGEND '
<br /> 0
<br /> �-
<br /> POINT OF CONNECTION �
<br /> �``� �"�, 1 1/2" PSAN DOWN o
<br /> 1 1 1 1 1 � . � � � 124 �� 8" FIRE RISER (REF) � ,� o
<br /> `' 6" FIRE RISER (REF) � -
<br /> GENERA �IOTES � ��rx
<br /> FOR CONTINUATION SEE o
<br /> TOOLING DRAWING 1� SEE TOOLING DRAWING FME 146W0002, SH M16 °-
<br /> FME 141W0000-1 , SH M19 FOR HYDRAULIC TUBING INSTALLATION AND � "
<br /> 2" SAN FROM TOOLIN,G 2" A UP MATERIAL REQUIREMENTS. �' �
<br /> � � � � 4" SAN DOWN � 1/2" CW DOWN I 1 1/2" SAN �
<br /> 2" V UP » EWC-1 2. COLD WATER (CW) PIPING: TYPE L COPPER WITH COPPER o
<br /> ( I _ MATCHLINE - FOR CONTINUATION SEE DWG 1M119 � �/2 3" V UP SOCKET JOINT FITTINGS. INSULATE WITH 1 " FIBERGLASS �
<br /> � __�--_e __- -�- - -- �,���, _._ ..�_ -- - __ _ _._ _m __
<br /> o� o � StoregeCart � Ir Y I� 9 I � . �� �� , �� ���-=' � Station I C6 +L'1' arging
<br /> I � L = � � I � i � I � - _ � �-- ' _� �A_-D_O-W�1 -� - � � � ,� � ; � _ L �o WITH FACTORY-APPLIED ALL-SERVICE JACKET. PROVIDE �
<br /> � � - - � N
<br /> � � � � � � 1 " CW UP „ j , „� _ 1/2 CW ro N � — w c4�r'�y ��1�2 1 1/4" CW DN FACTORY—MOLDED PVC COVERS FOR VALVES AND FIITINGS. «� `�
<br /> � — ...._ � _ _ _ _ _ �� � ��� �l� — 2 BOP EL � 16 =6 _ � _ ��'.;A���t� � � ���OP L 1 � 6,_6„0�� �� � - -� �����, _ _� TO SSEW k .
<br /> ' ,�--r-- - � ��{-� � �, � a �-v�, ,.L, r= �-,---�- I
<br /> T �, �� � i � �;� T � _ �. �i �-�� � �-�T.L 1. o � �. � � I� ,
<br /> I I N � % � v , � - -� _ _ ��� --- � v ,� � , 3. DRAIN (D) PIPING: ASTM A53 BLACK STEEL SCH 40 WITH
<br /> - - - - - �' - - - -- - - - °� � i Pw Pw � � -� w �- - � ` _Pw- -- - - -�- - Pw � ' ' ,- � 150� MALLEAB�E IRON FITTINGS. �
<br /> — — — — — — — — — — �� ��� — — — — — — — — — — — — — — — — -- — 1 � � � — — — — — — I I r� rt, N I I — - 1 — — — � ..
<br /> — — - �
<br /> �C— A A � A A
<br /> z� � EWF_� cw cw ' cw cw ' 4. THE CONTRACTOR SHALL PERFORM "POTABLE WATER �
<br /> � 4" BOP EL 116'-6" 2" V UP, 4" SAN DOWN
<br /> 3 V DOWN SSEW-1 SYSTEM TESTING" AS DESCRIBED IN THE BOEING �
<br /> o � 1/2" CW DN „ , 4" BOP EL 116'-6" 6" HUB DRAIN �N ENGINEERING DOCUMENT DI-0565.0567 DATED FEBRUARY �
<br /> � TO EWF-1 6 HUB DRAIN 4 CW DN WITH T,P. � 29, 2008. w
<br /> 0 1 1/2 SAN DN z �- �
<br /> o -' � 5. SUPPORT ALL PIPING PER UNIFORM PLUMBING CODE IN � _
<br /> � � I 2»W ��� AREAS NOT SPECIFIED. �
<br /> z� I � I I I 100 i ��� ,
<br /> ;:r°
<br /> � � 1/2�� PSAN DN P3-2 R E F E R E N C E D RAW N G S
<br /> c° x— x x x —x- —x __ _ _ --- - . -- - -- - -- . „ �- _ - - - -
<br /> w /� --x x x - � - - - - - _ - - --- — - - �- - - _ �1 -1�2 -�J_� _ _ -
<br /> '� - - - - - - - - - � - - - - - - - - - - - - - - - - - - - -- -- - -�- - - � - .. -- - - �
<br /> � __ T- _,_�___ _r—� F—� ��--� —1 �— - <�?—
<br /> — — — — — — — — — — — — — — — -- — — -- — — — — — --— — — — — — — — �
<br /> X � n=�.� � �
<br /> �
<br /> , i
<br /> ,�
<br /> _
<br /> X i � �- - - - - - - - - - - - ��- - ��2��,�,n� TO S I N K
<br /> o I � � � � � �� � , � � �� -: � � � i"1
<br /> ,- I / � � I I , � 2 W U P TO FD-1 WITH , � I
<br /> I „�,=o ( I ,� � Af�D � FFEE C O STR U CT O I V �l OTES
<br /> z � L � ! � � I ; TRAP PRIMER ��2"HW MAK�R
<br /> � � ��,,,� I I � �' I I i I I
<br /> i
<br /> o i I � I � i I ( X ' � I I � � � � � 3 n � 2 I � � REMOVE EXISTING SINK P3-2. COLD WATER, HOT WATER, ��
<br /> � � � � r � � ( � � � � � I I � � �� WASTE AND VENT PIPING SHALL BE DISCONNECTED FROM �t��
<br /> SINK AND COFFEE MAKER. WASTE PIPING SHALL BE CAPPE
<br /> � � I � $ I � ,�--�r � � � � I I I I � 3�4�� HYS � �--3�4" � AT FLOOR �MINIMUM 6" AFF� AND VENT PIPING SHALL BE
<br /> i �`rs` � ( � �3 4 HYR � ,,
<br /> � I � _ � I I � � � � 4�� ' CAPPED AT CEILING PENETRATION.
<br /> ,
<br /> z � I '\ I ( �` �i , 3" V UP 8c DN � i � � . . � ( I___ 2°�W �, � �_�, ��� � REMOVE EX►STING CW PIPING. REFER TO SHEET 1M123R
<br /> _ � � ( � UNDERSLAB � � I FOR CONTINUATION OF DEMO.
<br /> � I � � I 1 1 2" PSAN _ _ ' � ' � �
<br /> ����� �—
<br /> �I I- � " I � X � = T�HUB=D`RA(fV--� i � � I � �� I 3 4" HW� UP " �I��1 3 REMOVE EXISTING HW PIPWG BACK TO TEE FITTING AND
<br /> I I ��� � � � � , � / \ � ' � � � 3 � � �
<br /> I �� i I I-1� I I /X���� �6° HUB DRAIN � I i �I � \- - � --_ _ - - --- - -� � _ _ ! \ �_ AP.
<br /> - _._t�._�._._.._�_�_�_�_� ���___.�.�.____�._. .___._.__�_________.____ _ _ �____.�_-----�---o_ _�_.�._--. -_��.----�_- _
<br /> _--- --- � -�-
<br /> MATCH�LINE FOR CONTINUATION SEE BUILDING 40-036 DRAWING�� ;�-1x x x x -x x x -x �� ��� WITH T.P. --- -- ---- � - -- �''—`� �`'� �E
<br /> - y
<br /> _:�`
<br /> BLDG. 4�-36 (E) 4" SAN UP 8c ;
<br /> 6" DN W/WCO
<br /> FOR CONTINUATION SEE "'
<br /> TOOLING DRAWING
<br /> FME 146W0002, SH M17
<br /> R E M O�A� PARTIA� � R ST F�00 R P �U M B I �1 G P �AN
<br /> SCALE: 1/8"=1 '-0" FINISH FLOOR EL. 100'-0" �
<br /> :.1,�
<br /> iY-"x
<br /> 11 11' 12 13 14 15 16 17
<br /> , � � �
<br /> I i
<br /> �� � �
<br /> II ' B�DG I40�034� , _
<br /> -- - I _ I � _� �—� ;;���
<br /> �� �-- � �---�-- -
<br /> ,
<br /> — —_-�--- -- - ---�--�---- K ,
<br /> ��1 M1�10 1M1�11 �
<br /> -- ----------�`J
<br /> `r' 111 M1�13 1M1� 4 ••
<br /> N „ ,
<br /> � -- ---------- L.3
<br /> do-- (11 M1�1 6 1M1�17
<br /> �� �
<br /> � -- ---------- L.7
<br /> � '�1 M1I19 1M1I 0
<br /> m -- �� � I -------- -O -
<br /> , 1M1122 1M1, 3 M
<br /> -- I i I I ----------� �':�`.
<br /> iBLDG 40-036 •
<br /> KEY P�AN N ��
<br /> SCALE; NONE
<br /> 4' 2' 0 4' 8' 12' 16' 20'
<br /> E-
<br /> �t'.
<br /> www.brph.com Copyrighto 2Q17
<br /> PROFESSIONAL STAMP & SIGNATURE
<br /> APPLIES TO WORK WITHIN THE CLOUDED Architects, Engin�eers, Constructors
<br /> 19020 33rd Ave W,Suite 530 State of Washington
<br /> REVISION AREAS ONLY AS INDICATED �ynnwood,Washington,98036 CertificateofAuthorization
<br /> 425-921-3500 Architecture No.603235512
<br /> Engineering No.3137
<br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE
<br /> ACCEPTABILITY EAA 07 06 17 `
<br /> 0 ISSUE FOR PERMIT—SWR TOWER SUPPORT (40-25/25) WBS 16324 EAA �a�� �v������,, THIS DESIGN AND/OR CHECKED 06 REMOVAL PARTIAL FiRST FLOOR PLUM�ING PLAN 16324 07/06/17
<br /> �� BJ 07 17 SHEET
<br /> �
<br /> ` �`� �,:� SPECIFICATION IS APPROVED •
<br /> � r � o� ENGINEER TITLE FACTORY TRANSFORMATION 40-035 25 SRW Tower Su ort
<br /> � �U � �, f APPROVED BY DEPT. DATE FSG O� 06 �� � PP —
<br /> CHECKED 1 M 12 2 R �� � ,,
<br /> '�� �U I LD I N G 40-035 �oB N0. COMP No.
<br /> �1� � ;���1 �, w APPROVED
<br /> �G'F,.,�''G'(S,I,Fj:�� ,��
<br /> WO 15/2899-801
<br /> "``�5�0,���,L �``'` APPROVED MECHANICAL MASTER COL. M-N/11 -13 EVERETT, Wq °wc No. 40-035-1 M122R-801
<br />
|