Laserfiche WebLink
;=�, <br /> � <br /> � <br /> r� <br /> O " <br /> �EGEND ' <br /> 0 <br /> �- <br /> POINT OF CONNECTION � <br /> �``� �"�, 1 1/2" PSAN DOWN o <br /> 1 1 1 1 1 � . � � � 124 �� 8" FIRE RISER (REF) � ,� o <br /> `' 6" FIRE RISER (REF) � - <br /> GENERA �IOTES � ��rx <br /> FOR CONTINUATION SEE o <br /> TOOLING DRAWING 1� SEE TOOLING DRAWING FME 146W0002, SH M16 °- <br /> FME 141W0000-1 , SH M19 FOR HYDRAULIC TUBING INSTALLATION AND � " <br /> 2" SAN FROM TOOLIN,G 2" A UP MATERIAL REQUIREMENTS. �' � <br /> � � � � 4" SAN DOWN � 1/2" CW DOWN I 1 1/2" SAN � <br /> 2" V UP » EWC-1 2. COLD WATER (CW) PIPING: TYPE L COPPER WITH COPPER o <br /> ( I _ MATCHLINE - FOR CONTINUATION SEE DWG 1M119 � �/2 3" V UP SOCKET JOINT FITTINGS. INSULATE WITH 1 " FIBERGLASS � <br /> � __�--_e __- -�- - -- �,���, _._ ..�_ -- - __ _ _._ _m __ <br /> o� o � StoregeCart � Ir Y I� 9 I � . �� �� , �� ���-=' � Station I C6 +L'1' arging <br /> I � L = � � I � i � I � - _ � �-- ' _� �A_-D_O-W�1 -� - � � � ,� � ; � _ L �o WITH FACTORY-APPLIED ALL-SERVICE JACKET. PROVIDE � <br /> � � - - � N <br /> � � � � � � 1 " CW UP „ j , „� _ 1/2 CW ro N � — w c4�r'�y ��1�2 1 1/4" CW DN FACTORY—MOLDED PVC COVERS FOR VALVES AND FIITINGS. «� `� <br /> � — ...._ � _ _ _ _ _ �� � ��� �l� — 2 BOP EL � 16 =6 _ � _ ��'.;A���t� � � ���OP L 1 � 6,_6„0�� �� � - -� �����, _ _� TO SSEW k . <br /> ' ,�--r-- - � ��{-� � �, � a �-v�, ,.L, r= �-,---�- I <br /> T �, �� � i � �;� T � _ �. �i �-�� � �-�T.L 1. o � �. � � I� , <br /> I I N � % � v , � - -� _ _ ��� --- � v ,� � , 3. DRAIN (D) PIPING: ASTM A53 BLACK STEEL SCH 40 WITH <br /> - - - - - �' - - - -- - - - °� � i Pw Pw � � -� w �- - � ` _Pw- -- - - -�- - Pw � ' ' ,- � 150� MALLEAB�E IRON FITTINGS. � <br /> — — — — — — — — — — �� ��� — — — — — — — — — — — — — — — — -- — 1 � � � — — — — — — I I r� rt, N I I — - 1 — — — � .. <br /> — — - � <br /> �C— A A � A A <br /> z� � EWF_� cw cw ' cw cw ' 4. THE CONTRACTOR SHALL PERFORM "POTABLE WATER � <br /> � 4" BOP EL 116'-6" 2" V UP, 4" SAN DOWN <br /> 3 V DOWN SSEW-1 SYSTEM TESTING" AS DESCRIBED IN THE BOEING � <br /> o � 1/2" CW DN „ , 4" BOP EL 116'-6" 6" HUB DRAIN �N ENGINEERING DOCUMENT DI-0565.0567 DATED FEBRUARY � <br /> � TO EWF-1 6 HUB DRAIN 4 CW DN WITH T,P. � 29, 2008. w <br /> 0 1 1/2 SAN DN z �- � <br /> o -' � 5. SUPPORT ALL PIPING PER UNIFORM PLUMBING CODE IN � _ <br /> � � I 2»W ��� AREAS NOT SPECIFIED. � <br /> z� I � I I I 100 i ��� , <br /> ;:r° <br /> � � 1/2�� PSAN DN P3-2 R E F E R E N C E D RAW N G S <br /> c° x— x x x —x- —x __ _ _ --- - . -- - -- - -- . „ �- _ - - - - <br /> w /� --x x x - � - - - - - _ - - --- — - - �- - - _ �1 -1�2 -�J_� _ _ - <br /> '� - - - - - - - - - � - - - - - - - - - - - - - - - - - - - -- -- - -�- - - � - .. -- - - � <br /> � __ T- _,_�___ _r—� F—� ��--� —1 �— - <�?— <br /> — — — — — — — — — — — — — — — -- — — -- — — — — — --— — — — — — — — � <br /> X � n=�.� � � <br /> � <br /> , i <br /> ,� <br /> _ <br /> X i � �- - - - - - - - - - - - ��- - ��2��,�,n� TO S I N K <br /> o I � � � � � �� � , � � �� -: � � � i"1 <br /> ,- I / � � I I , � 2 W U P TO FD-1 WITH , � I <br /> I „�,=o ( I ,� � Af�D � FFEE C O STR U CT O I V �l OTES <br /> z � L � ! � � I ; TRAP PRIMER ��2"HW MAK�R <br /> � � ��,,,� I I � �' I I i I I <br /> i <br /> o i I � I � i I ( X ' � I I � � � � � 3 n � 2 I � � REMOVE EXISTING SINK P3-2. COLD WATER, HOT WATER, �� <br /> � � � � r � � ( � � � � � I I � � �� WASTE AND VENT PIPING SHALL BE DISCONNECTED FROM �t�� <br /> SINK AND COFFEE MAKER. WASTE PIPING SHALL BE CAPPE <br /> � � I � $ I � ,�--�r � � � � I I I I � 3�4�� HYS � �--3�4" � AT FLOOR �MINIMUM 6" AFF� AND VENT PIPING SHALL BE <br /> i �`rs` � ( � �3 4 HYR � ,, <br /> � I � _ � I I � � � � 4�� ' CAPPED AT CEILING PENETRATION. <br /> , <br /> z � I '\ I ( �` �i , 3" V UP 8c DN � i � � . . � ( I___ 2°�W �, � �_�, ��� � REMOVE EX►STING CW PIPING. REFER TO SHEET 1M123R <br /> _ � � ( � UNDERSLAB � � I FOR CONTINUATION OF DEMO. <br /> � I � � I 1 1 2" PSAN _ _ ' � ' � � <br /> ����� �— <br /> �I I- � " I � X � = T�HUB=D`RA(fV--� i � � I � �� I 3 4" HW� UP " �I��1 3 REMOVE EXISTING HW PIPWG BACK TO TEE FITTING AND <br /> I I ��� � � � � , � / \ � ' � � � 3 � � � <br /> I �� i I I-1� I I /X���� �6° HUB DRAIN � I i �I � \- - � --_ _ - - --- - -� � _ _ ! \ �_ AP. <br /> - _._t�._�._._.._�_�_�_�_� ���___.�.�.____�._. .___._.__�_________.____ _ _ �____.�_-----�---o_ _�_.�._--. -_��.----�_- _ <br /> _--- --- � -�- <br /> MATCH�LINE FOR CONTINUATION SEE BUILDING 40-036 DRAWING�� ;�-1x x x x -x x x -x �� ��� WITH T.P. --- -- ---- � - -- �''—`� �`'� �E <br /> - y <br /> _:�` <br /> BLDG. 4�-36 (E) 4" SAN UP 8c ; <br /> 6" DN W/WCO <br /> FOR CONTINUATION SEE "' <br /> TOOLING DRAWING <br /> FME 146W0002, SH M17 <br /> R E M O�A� PARTIA� � R ST F�00 R P �U M B I �1 G P �AN <br /> SCALE: 1/8"=1 '-0" FINISH FLOOR EL. 100'-0" � <br /> :.1,� <br /> iY-"x <br /> 11 11' 12 13 14 15 16 17 <br /> , � � � <br /> I i <br /> �� � � <br /> II ' B�DG I40�034� , _ <br /> -- - I _ I � _� �—� ;;��� <br /> �� �-- � �---�-- - <br /> , <br /> — —_-�--- -- - ---�--�---- K , <br /> ��1 M1�10 1M1�11 � <br /> -- ----------�`J <br /> `r' 111 M1�13 1M1� 4 •• <br /> N „ , <br /> � -- ---------- L.3 <br /> do-- (11 M1�1 6 1M1�17 <br /> �� � <br /> � -- ---------- L.7 <br /> � '�1 M1I19 1M1I 0 <br /> m -- �� � I -------- -O - <br /> , 1M1122 1M1, 3 M <br /> -- I i I I ----------� �':�`. <br /> iBLDG 40-036 • <br /> KEY P�AN N �� <br /> SCALE; NONE <br /> 4' 2' 0 4' 8' 12' 16' 20' <br /> E- <br /> �t'. <br /> www.brph.com Copyrighto 2Q17 <br /> PROFESSIONAL STAMP & SIGNATURE <br /> APPLIES TO WORK WITHIN THE CLOUDED Architects, Engin�eers, Constructors <br /> 19020 33rd Ave W,Suite 530 State of Washington <br /> REVISION AREAS ONLY AS INDICATED �ynnwood,Washington,98036 CertificateofAuthorization <br /> 425-921-3500 Architecture No.603235512 <br /> Engineering No.3137 <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE <br /> ACCEPTABILITY EAA 07 06 17 ` <br /> 0 ISSUE FOR PERMIT—SWR TOWER SUPPORT (40-25/25) WBS 16324 EAA �a�� �v������,, THIS DESIGN AND/OR CHECKED 06 REMOVAL PARTIAL FiRST FLOOR PLUM�ING PLAN 16324 07/06/17 <br /> �� BJ 07 17 SHEET <br /> � <br /> ` �`� �,:� SPECIFICATION IS APPROVED • <br /> � r � o� ENGINEER TITLE FACTORY TRANSFORMATION 40-035 25 SRW Tower Su ort <br /> � �U � �, f APPROVED BY DEPT. DATE FSG O� 06 �� � PP — <br /> CHECKED 1 M 12 2 R �� � ,, <br /> '�� �U I LD I N G 40-035 �oB N0. COMP No. <br /> �1� � ;���1 �, w APPROVED <br /> �G'F,.,�''G'(S,I,Fj:�� ,�� <br /> WO 15/2899-801 <br /> "``�5�0,���,L �``'` APPROVED MECHANICAL MASTER COL. M-N/11 -13 EVERETT, Wq °wc No. 40-035-1 M122R-801 <br />