<br /> � ENERA� �IOTES � r�
<br /> 1 . THE BOEING EVERETT FIRE INSPECTION DEPARTMENT (425-342-2266) �
<br /> SHALL BE NOTIFIED 24 HOURS IN ADVANCE OF ALL VALVE CLOSURES, o ..
<br /> FLUSHING, AND HYDROSTATIC TESTS ON THE FIRE PROTECTION SYSTEM. � '
<br /> THE MAXIMUM DURATION OF A SYSTEM CLOSURE IS 8 HOURS. �
<br /> 13 �� �'
<br /> 2. THE FIRE PROTECTION SPRINKLER SYSTEM PIPING SHALL BE DESIGNED w
<br /> PER NFPA 13, ORDINARY PIPE SCHEDULE AND PIPE SPACING. PIPE �
<br /> �1AfCH �II�IE � HANGERS SPACING SHALL BE PER NFPA 13. �
<br /> ICharging 0.�. ��� —— —�— —— � �Rack �Rack r I �_.��.r���
<br /> �.1.2� 2.9.2 _-a 2.1.2 � �
<br /> � � � .� 3. A CONTRACTOR'S MATERIAL AND TEST CERTIFICATE SHALL BE REQUIRED � � �
<br /> � ��� :-���° .I I si t�oa'h � � UPON COMPLETION OF THE TESTING. THE CERTIFICATE SHALL BE '
<br /> - - �I - �`�� � � ����oa` � � - -- � � � - � - � �u�- �� SIGNED OFF BY THE BOEING EVERETT FIRE INSPECTOR DEPARTMENT �
<br /> I ; I Zote�Tate ° �� I � ;
<br /> � � - ,�f° �,.a; ;' � � � PRIOR TO COMMENCING ADD[TIONAL WORK ON THE FIRE PROTECTION � y
<br /> - � - -- SYSTEM. �
<br /> - - - ------ -- - - - - - - - - - - - - - - - - - - - - - - - - - - �
<br /> - w
<br /> 4. FIRE PROTECTION PIPING SHOP DRAWINGS SHALL BE SUBMITTED TO °-
<br /> � 4" 17'-0" AFF 4" 17'-0" AFF BOEING FIRE PROTECTION ENGINEERING AND SHALL BE APPROVED o
<br /> � 4" F UP BEFORE ANY MODIFICATION TO THE FIRE PROTECTION PIPING SYSTEM �
<br /> � BEGINS. w
<br /> J � �:
<br /> � 5. ALL SPRINKLER PIPING 3" AND SMALLER SHALL BE SCHEDULE 40 ASTM � :�°:x
<br /> � OUTLINE OF MEZZANINE ABOVE HOSE CONNECTION A-53, GRADE B, BLACK STEEL. ALL PIPING 4" AND LARGER SHALL
<br /> �� � AT 1 ST FLR & MEZZ. BE ASTM A-53, GRADE B, SCHEDULE 40 FOR VERTICAL RISERS AND
<br /> � r ° ° � � � SEE DETAIL •�
<br /> � -- -- — — — — � — -� — — — --. � MAY BE SCHEDULE 10 FOR HORIZONTAL CROSS MAINS.
<br /> _ 1 � � (SIMILAR)
<br /> - - 1M273 M513
<br /> x x-- - - - - _:,�, - � I 6. SPRINKLER SYSTEM PIPE FITTINGS SHALL BE 150 LB. THREADED
<br /> - - - - - - i - - � =� - - - - - - - - - - - - - - - -°- MALLEABLE IRON FOR 1 '/" AND SMALLER, AND VICTAULIC GROOVED
<br /> I � � ^ � � � � HUB DRAIN FITTINGS FOR 2�/�" AND LARGER . PIPE FITTINGS FOR 2" MAY BE
<br /> � � �: �I �- - � -� � - ° I I EITHER 150 LB. THREADED MALLEABLE IRON OR VICTAULIC GROOVED.
<br /> � � � � � �—' � �--- _ � � I
<br /> i I
<br /> � �, '` � � � � � � 7. COUPLINGS FOR GROOVED PIPE AND FITTINGS SHALL BE VICTAULIC
<br /> � � � � I �--- " '�,
<br /> �,, , � � � 1 1/4 INSPECTOR5 TEST FROM ZONE 4 STYLE 07 ZERO-FLEX UNLESS OTHERWISE NOTED. : ;
<br /> I � z � SPRINKLERS UN;DER �� I � � � I I � � � TRUSS LEVEL DWG CWM507
<br /> � c� � I � ---- � 1 1/4 INSPECTORS TEST FROM ZONE 3 8. HYDROSTATIC TEST: PRESSURE - 225 PSIG, DURATION - 2 HOURS.
<br /> MEZZANINE AT 8 AFF � � - I � TRUSS LEVEL DWG CWM507
<br /> � �� � --- ��
<br /> � I I ,
<br /> ��� � , � _____ � ( I „ SEISMIC BRACING SHALL BE INSTALLED IN ACCORDANCE WITH FM
<br /> �_ _ _ _ _ � ----- 1 1/4 INSPECTORS TEST FROM ZONE 3
<br /> I � � I I — ° ' � � - � 9. STANDARDS. SEE FM DATA SHEETS 2-8 "EARTHQUAKE PROTECTION
<br /> o, __ � � TRUSS LEVEL DWG 40-36-CWM506 �
<br /> � ; � � � � » FOR WATER-BASED FIRE PROTECTION SYSTEMS" FOR SPECIFIC DETAILS.
<br /> I __ _ _ I , I 1 1/4 INSPECTORS TEST FROM ZONE 4
<br /> - ! I � � � �!�j TRUSS LEVEL DWG 40-36-CWM506
<br /> �
<br /> �—i� 10. AUTOMATIC SPRINKLER HEADS SHALL BE 165 DEGREE F. TEMPERATURE
<br /> j � � - -- - - - -� - - - - � -
<br /> � RATED. ���
<br /> — — � ��_���—.�- �.�_�'��_� n - �� I � i� ii � �� E
<br /> �. -----�------------ �
<br /> � � � � � � 0 � � � � � � � MATCH �II�� ELEVATOR SPRINKLER � + r�
<br /> �, .�
<br /> 11 . ALL EQUIPMENT SHALL BE UL LISTED AND FM APPROVED FOR FIRE i =
<br /> BUI D N 4 - 36 PIPE UP AND DN SERVICE.
<br /> T SPILL 1 1/4" INSPECTORS TEST
<br /> DRAINS TO HUB DRAIN 1 '-0" ABOVE GRADE (TYP) "
<br /> I I
<br /> COf� STRUCTON NOTES
<br /> I � 1�j MODIFY EXISTING SPRINKLER SYSTEM IN THIS AREA AS REQUIRED TO
<br /> ( � ACCOMMODATE NEW OCCUPANCY HAZARD AS DEFINED BY BOEING FIRE ;�,
<br /> PART A� � RST F�00 R FI R E P ROTECT 0 N P �Af� � PROTECTION. COORDINATE PIPE ROUTING WITH ALL DISCIPLINES AND ,��
<br /> I PROVIDE ADDITIONAL OFFSETS AND SPRINKLERS AS REQUIRED. REMOVE
<br /> SCALE: 1/8"=1 '-0" FINISH FLOOR EL. 100'-0" i v ALL ABANDONED OR UNUSED SECTIONS OF PIPING AND CAP. PROVIDE
<br /> AUXILIARY DRAINS PER NFPA 13.
<br /> 2. MODIFY EXISTING FIRE SPRINKLER SYSTEMS IN ACCORDANCE WITH
<br /> BOEING FIRE PROTECTION ENGINEERING STANDARD D38108-F, NFPA 13,
<br /> FM 2-8 AND FM 2-8N, APPLICABLE CODES, AND BOEING FIRE
<br /> DEPARTMENT REQUIREMENTS.
<br /> FIRE SPRINKLER SHOP DRAWINGS SHALL INCLUDE THE SPRINKLER
<br /> CONTROL VALVE TAG AND LOCATION FOR THE CONTROL VALVE THAT �
<br /> SERVES THIS AREA. ;�� �
<br /> 3. COORDINATE SPRINKLER HEAD PLACEMENT AND PIPE ROUTING WITH ALL
<br /> DISCIPLINES, INCLUDING NEW AND EXISTING MECHANICAL AND ..
<br /> ELECTRICAL DISCIPLINES. PROVIDE ADDITIONAL PIPING AND SPRINKLERS y
<br /> 11 11' 12 13 14 15 16 17 AS REQUIRED.
<br /> � I I I ' '
<br /> �� � BLDG 40-034� � 4. PROVIDE CONCEALED FLUSH MOUNT STYLE PENDENT SPRINKLER HEADS
<br /> - �� - - I —I � IN THE SUPPORT CELL AREA. COVER PLATE FINISH SHALL BE WHITE.
<br /> ,� __� _ � � �
<br /> �� 1 M�60—�1 M2 1- ---�---�----� �::
<br /> -- -----------�`J =� .
<br /> � `� ,
<br /> N �� 1 M�63 �1 M2, 4
<br /> � -- ---------- L.3 R E FE R E�l C E D RAW �l G S ..
<br /> ¢ II 1 M�66 � 1 M2 7 :
<br /> -- �� ' ' ---------- L.7
<br /> �
<br /> � II 1M 69 � 1M2 0
<br /> m -- � -------- -�
<br /> II 1M�72 1M2 3 M
<br /> -- iB i �- � -----------�
<br /> �� LDG 40 036 _
<br /> K EY P LAN `�f ;
<br /> SCALE: NONE N
<br /> 4' 2' 0 4' 8' 12' 16' 20'
<br /> www.brph.com Copyrighto 2017
<br /> PROFESSIONAL STAMP & SIGNATURE
<br /> APPLIES TO WORK WITHIN THE CLOUDED Architects, Engineers, Constructors
<br /> 19020 33rd Ave W,Suite 530 State of Washington
<br /> REVISION AREAS ONLY AS INDICATED �ynnwood,Washington,98036 CertifiicateofAuthorization
<br /> 425-921-3500 Architecture No.603235512
<br /> Engineering No.3137
<br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE g` '�
<br /> ��1� ���f -� ACCEPTABILITY CH�ECKED 07 06 17 pq�TIAL FIRST FLOOR FIRE PROTECTION PLAN 16324 07/06/17 ;
<br /> 0 ISSUE FOR PERMIT—SWR TOWER SUPPORT (40-25/25)WSG 16324 EAA �`�F �v_,�,r� THIS DESIGN AND/OR CBJ 07 06 17 SHEET
<br /> �'� �c� SPECIFICATION IS APPROVED
<br /> � �r P o�, ENGINEER TITLE FACTORY TRANSFORMATION 40-035 25 SRW Tower Su ort ••
<br /> �� � -r, ;r APPROVED BY DEPT. DATE FSG 07 06 �� � PP
<br /> � � �= r � M273 -�01
<br /> � CHECKED
<br /> ��j;,�;£3�1 �� ;v APPROVED �U I LD i N G 40-035 JOB N0. WO 15/2899-801 COMP N0.
<br /> �rIS'1'F'����' `S:s'
<br /> �``�51on�,,L ��`' APPROVED MECHANICAL MASTER COL. M-N/13-14 EVERETT, Wq °wc No. 40-035-1 M273-801
<br />
|