|
I'I,II!!''��__.
<br /> ����-��� ����' ��������� l��������� __.�..
<br /> � �
<br /> _ � � '
<br /> u�a 1" o ,
<br /> . . . . . . . . � 1�,s..) w �
<br /> F� �
<br /> � � �
<br /> . .. . .. ..... . .. . ... . .. . . . .. . . . _ . . . . .. ...... . .... .. . . . . ._ . .. _.. ____.___.__..___"_" � � � � ^�$
<br /> ...._. ... ..._ ,...._.__._ ... .__.. ...... .. .. . _.__..._..,_. ._..... . . ..__.. . . . ... .. - . . ._ .. . . . .._._..
<br /> , .__ . � _'_ .
<br /> � ____.___"
<br /> . . . . ... .. .__... ._.__._____....._......,�--_.. . .
<br /> SECTION 08710-DOOR HARDWARE SECTION 096�0-CARPET
<br /> SECTION 15500 a HEATING,VEliTTILATII�G,AND AIR CONDITIONII�TG '''' � �
<br /> Summar : 1. Provide hardware for swinging and sliding doors per drawings and this specification. Products: 1. Products:Refer to Section 01020-Allowances. Summary: 1. Modify,relocate and extend existing equipment, systems,and controls for heating and � �l
<br /> y 2. Carpet Installation Method: Tackless mounting with carpet cushion installation. Ripple ventilation including gas piping. �' „�
<br /> Products; i. Products: As selected by owner complying with the following. Refer to Section 01020- ,
<br /> - Allowances. rubber cushion,for heavy traffic.Provide edge guards.Adhesives,cements and fasteners. 2. Coordinate with Owner's room uses to provide adequate system for all contract areas. t ; �.
<br /> 3. Coordinate location of thermostats and controls with Owner's requlremants. �, � ; �'
<br /> 2. Product Requirements: 4. Coordinate location of duct�ork to avoid interference with locatiori of designated lighting . . �
<br /> a. Materials and Application: ANSI A156 series standards. Installation: 1. Comply with requirements of Section 01000-Project Requirements.
<br /> 2. I n s t a l l w i t h t i g h t s e a m s a n d c a r p e t g r a i n r u n nin g in same direction. fixture locations.Notify architect of required architectural elements to conceal ducrivork
<br /> b. Quality LeveL• Residential. � �
<br /> such as lowered ceilings or soffits.
<br /> 3. Hardware Finishes: Oil rubbed bronze(US l OB).
<br /> 4. Locksets and Latchsets: Cylinder type,privacy function at all bedrooms. SECTION 09900-PAINT AND STAIN 5. Do not cut structural elements without prior written approval.
<br /> 5. Lock Cylinde�s: Interchangeable type. Suminary: 1. Provide painting and surface preparation for interior and exterior o x
<br /> 6. Hinges and Butts: Full-mortise type with non-removable pins at exterior, entrance unfinished surfaces as scheduled. Design l. Modify,relocate and extend existing forced air heating system and service to
<br /> doors. 2. Provide painting and surface preparation of exposed mechanical and electrical piping, accommodate new work,including new materials suitable for service intended complying �
<br /> 7. Closers: Low frequency,hinge type. conduit,ductwork,and equipment. with approved submittals. °�
<br /> 3. Provide repainting and surface preparation at areas of remodeling. '�
<br /> 8. Stops for each doar. p g p p g q Submittals: 1. Submit product data,warranties,operating and maintenance data. �
<br /> 9. Flush bolts wifh dustproof strikes. 4. Provide aintin of entire surface where atch aintin is re uired.
<br /> 10. Interior packet door hard�vare: Stanley heavy duty. �
<br /> ll. Sound-stripping @ bathroom doors. Submittals: L Submit product data,samples,4 foot by 4 foot mockup of each color, Products: 1. Provide new materials suitable for service intended complying with approved shop �
<br /> c�
<br /> 12, Weather-stripping at ali doors to unheated spaces:pressure seal neoprene type. extra stock consisting of 1 unopened gallon of each type of paint used. drawings.Provide accessory items such as controls,anchars and insulation. �
<br /> 13. Thresholds: Interlocking,aluminum�vith bronze finish.
<br /> Products: l. Products: Benjamin Moore,Sherwin Williams,Kelly Moore,Parker,Cabots or approved Installation: 1. Comply with requirements of Section 01000-Project Requirements. �
<br /> �
<br /> Installation: 1. Comply with requirements of Section 01000-Project Requirements. equaL 2. Comply with applicable codes,regulations, oxdinances and requirements of authorities �
<br /> 2. Comply with DHI "Recommended Locations for Builder's Hardwat`e" and hardware 2. First-line eommercial-quality products for all coating systems. having jurisdiction and SMACNA recommendations,
<br /> manufacturers instructions. 3. Conceal piping and ductwork in living spaces. o
<br /> 3. Refer to the door specifications and plans for hardware functions. Installation: 1. Gomply with rec�uirements of S_ection 01000-Project Requirements. 4. Center ceiling-mounted elements in center of ceiling tiles as applicable. M
<br /> 2. Provide field-applied mock-ups of each color and finish selected on actual surfaces to be 5. Maintain indicated fire ratings of walls,partitions,ceiling�, and floors at penetrations. �
<br /> END DIVISION 8 Seal with firestopping to main�ain fire rating. M
<br /> pauited.Test sample area for adhesion for each type of paint. `r'
<br /> 6. Insulate piping and ductwork. Provide vapor barrier on insulated piping operating below � �
<br /> 3. Sand before painting until smaoth and flat and sand between coats. L..
<br /> _ ._---_._ _..._ _,_. .._�,..._ 60 degrees F, � y�
<br /> 4, Recoat areas which show bleed-through or defects. '7. Locate floor grills 4"from finished wall,or as d'v-ected to clear drapes. ,� �
<br /> DIVISION 9-FIIVISHES 5. Remove cover plates and protect hardware and adjacent surfaces. ,
<br /> 6. Apply paint to achieve manufacturer's recommended dry film thicknesses. 8. Test all systems for proper operation. U �
<br /> 9. Comrnission and balance systems. O �
<br /> SECTION 09255-GXPSUM BOARD ASSEMBLIES
<br /> 7. Paint entire surface where patch painting is re,quired. � V.l M
<br /> Summary: l. Provide Gypsum Board Assemblies: 8. Clean paint spatter from adjacent surfaces and glass. 10. Instruct Owner s personnel in proper operation of systems. ,
<br /> 9. Touch-up damaged surfaces at completion of consn•uction. � � �
<br /> a, Interior walls,partitions,and ceilings for tape and joint compound finish. ENb OF DIVISION 15 ` � U M
<br /> b. Insulation and vapor barrier systems in gypsum drywall systems.
<br /> c. Cementitious backer units for application of tile.
<br /> INTERIOR PAINT SCHEDULE ___�..:..__.. ., �� � [W-+ �
<br /> d. Remodeling gypsum drywall systems at areas of new construction. ■ Gypsum Drywall Walls and Ceilings: Satin(1 step up from flat)fmish. 1 coat latex primer,2 Coats acrylic
<br /> N � �
<br /> 2. Gypsum Board Attachment: fmish. �� '�'' `�
<br /> a. Gypsum boaxd nail-attached to wood framing and furring. ■ Gypsum Drytivall Walls and Ceilings in Bathrooms and Lazrndry: Semi-gloss(1 step up from satin). 1 coat DIVISIOil�tt 16-EL�CTRICAL � �
<br /> latex primer,2 coats acrylic fmish. � � �
<br /> , Products: 1. Gypsum Board: • Wood for Puinted Finish(typical): Satin fmish(submit sample);1 coat acrylic enamel undercoat(if not pre- SECTION 16000-ELECTRICAL � p
<br /> �, « rimed material) 2 coats acrylic enamel. Summa 1. Modify,relocate,and extend existing electrical systems as required to
<br /> a. Gypsum Wallboard: ASTM C 36, 1/2 inch @ framing 16 d.c., ll2 inch sag- p � �'' �
<br /> resistant"ceiling board @ roof/ceiling framing 24"o.c. 5/8 inch. ■ Wood,for Transparent Finish('f not pre-fininshed by millwork supplier): Satin Gloss. 1 coat benite sealer, accommodate new work: � �
<br /> h. Water-Resistant Gypsum Backing Board: ASTM C 630,regular and fire-rated 2 coats catalyzed laquer at VG fir millwork and doars. 1 coat stain and 2 co�ts catalyzed laquer at a, Power. �
<br /> d. b. Liahtin ,interior and exterior. � �
<br /> types, 1/2 inch typical thickness. hardwoo g _
<br /> c. Joint Treahnent: ASTM C 475 and ASTM C 840,3-coat system. e. Power,telephone/internet,cable TV and data outlets and wiring.
<br /> d. Spray Texture Finish. EXTERIOR PAINT SCHEDULE d. Lightning protection. �
<br /> e. Installation Standard: ASTM C 840. ■ Exterior� Wood Trim, So�ts, Facia,Wood Doors, Frame:Low Sheen. 1 coat exterior alkyd primer,2 coats e, Provide for electrical permit, �"
<br /> 2. Cementitious Backer Units for application of tile on floors and wet areas: ANSI A acrylic fmish. _ f. Caordinate with owner's security supplier/installer. �
<br /> 118.9,cement-coated Portland cement panels. 1/2 inch nominal. • Wood Siding:Previously fmished surfaces 1 eoat solid acrylic urethane wdod stain.Unfinisfied or 2. Coordinate location of ductwark avoid interference with location o�'designated �
<br /> 3. Trim Accessories: Metal trim. Cornerbead, edge trim,and control joints. preprimed surfaces-2 coats solid acrylic urethane wood stain. Rodda:"Sharkskin or approived equal. lighting fixture locations.
<br /> a. AuYiliary Materials: Gypsutn boat�d screws,ASTM C 1002. Gypsum board nails, • �xterior Exposed Timber Framing and Decking:2 eoats(all sides)semi-solid oil or alkyd base stain. 3. Provide connections for appliances and mechanical equipment. �
<br /> ASTM C 514. Concealed acoustical sealant.Mineral fiber soimd attenuation
<br /> ■ Ferrous Metal:Low Sheen. lcoat,rust-inhibiting primer,2 coats acrylic fmish. 4. Do not cut structural elements without prior written approval. °�
<br /> blankets. ■ Galvanized Metal:Low Sheen. 1 coat,galvanized metal primer,2 coats acrylic fmish. �
<br /> ■ Prefinished Aluminum:Low 5heen.2 coats acrylic fmish. �
<br /> Existing Service: 1, 200 amp(in basement).Relocate and upgrade as indicated or requii�ed.
<br /> �
<br /> Installation: 1. Comply�vith requiremants of Section 01000-Project Requirements.
<br /> � 2. Comply with standards referenced above and ASTM C 840 and GA 216. Submittals: 1. Submit product data,warranties,operating and maintenance data,circuit �
<br /> 3. Provide acoustical sealant at plates, openings. END-DIVISION 9 diagrams. �
<br /> 4. Install gypsum board assemblies true,plumb,level and in proper relation to adjacent - �--�-- 2. Submit electrical permit. �
<br /> __--- - _
<br /> __ --.__. .
<br /> - -------_------ w
<br /> surfaces.
<br /> 5. Provide 3-coat joint treatment such that,after flnishing,joints are not visibl�. DNISION 10-SPECIALTIES Products: l. Provide new materials suitable for serviee intended complying with �-
<br /> 6. Seal with 1 eoat of PVA sealer in complianee with State Energy Code requiements for approved subinittals. Provide accessories such as controls,cover plates, �
<br /> vapor barriers.Apply a"orange-peel"spray texture with 80%coverage(provide sample SECTION 1Q804-TOILET AND BATH ACCESSORIES and connections to equipment,white UN.O. See Fixture Schedule below.
<br /> wall in inconspicuous location for architect's review before spraying remainder of job)to
<br /> all areas except those noted for wallpaper finish. Snmmary: 1. Provide toilet and bath accessories and wood frained mirrors/rnedicine cabinets Installation: 1. CQmply with requirements of Section 01000 -Project Requirements.
<br /> 2. Comply with applicable codes,regulations, ordinances and requirements of �
<br /> SECTION 09300-TILE Products: l. Products: authorities having jurisdiction and National Electrical Code. m
<br /> 2. Toilet Accessories:Danze, "Parma" series,brusheci nickel finish. 3. Provide core drilling as required for new work. o
<br /> Sununary: 1. Provide tile for the following applications:
<br /> �, Wall tile over gypsum wallboard. a. Paper Holder, single roll: install an side u=all{righC side,e�cept left side�vhen uo 4. Conceal all conduit and wiring in living spaces.
<br /> b. Wall tile over cement backer units at wet areas. ti��all on right side). 5. Layouf fixtures,switches and reeeptacles as shown on plans.Review/eonfirm �
<br /> c, Floor tile over cement backer units.
<br /> b. Double Z'o�uel Bar,?�". 1 at Baseineilt Bath over bench. layout with architect and owner in field prior to installation. �- �
<br /> d. Floor tile over electric radiant heating system over cement backer units. See aiso c. Robe Hook:Mount on interior side of door at to�rail. 6. Coordinate location of framing to avoid interference with designated lighting ��
<br /> section 15000. e. 18" To�vel Bar: 1 a�each side of Basement and Powder Bath lavatory counter. fixture locations. � �
<br /> f. Sho«�er Curtain Rod(at Basement Bath): Brushed Nickel. � �
<br /> 7, Centei ceiling-mounted elements in center of ceiling tiles as applicable.
<br /> Products: 1. Tile Ma�erials: ANSI A 118 series st�ndard specifications.As selected by owner.
<br /> ;. Frameless Mirrors: as indicated on dra���ings. 8. Instull thermostats centered above light switches where applicable.
<br /> , Matching trim units. Ceramic soap dishes. a. Glazing: Mirror glass, 1/�inch thick(6 mm),polished edges,ASTIvi C 1036. g, Gang-mount multiple switehing loeations. Mount multiple types of eont�ols as
<br /> 2. Setting Materials:Latex-Portland cement mortar,ANSI A118.4. Cementitious tile backer b. Type: Frameless. close together as possible and in-line with each other at uniform helght above
<br /> board,ANSI A118.9. Grout:Latex-Portland cement grout,ANSI Al 18.6. fmished floor unless noted otherwise. � � � � �
<br /> - rt mildew-resistant silicone sealant for non-traffie areas. Installation: l. Gomply with rec�uirements of Sectian OI000 -Project�equirements. 10. Group multiple junetion boxes,telephone and eleetrical outlets together on '�� � '� �
<br /> 3. Sealants; One pa
<br /> 4 Radiant heatin s stem:"Sun Touch"Mat 5 stem. wa l l s. A v o i d b a c k-t o-b a c k b o x l o c a t i o n s. � � ° � o
<br /> • g Y Y .� � �'.� � �
<br /> END OF DIVISION 10 11, Mnetrat ons�.�Seal�with fire-sto f m lto mamtam fire atin�and floors at
<br /> . . . g p g � �, �,�d �, �
<br /> ------- ��_- --- _ . .
<br /> Products: 1, Tile Materials: ANSI A 118 series standard specifications. See schedule below.Matching p pp � g � �� a' � •°' U
<br /> trim units. DIVISION 15-MECHANICAL 12. Provide power to all mechanical equipment and appliances as required. � � u, � o �
<br /> 2. Setting Materials:Latex-Portland cement mortar,ANSI A118.4. Cementitious tile backer 13. Test all systems for proper operation. � '9 �'�
<br /> board,ANSI A118.9. Grout:LateY-Portland cement grout,ANSI All8,6. SECTION 154�0-PLUMBING 14, Label circuits in electrical panels, b ��� � � �
<br /> 3. Sealants:"Impregnator 511"satin finish,or approved equal. Summary: 1. Provide complete plurnbing,waste,and vent systems for the following: 15. Instruct Owner's personnel in proper operation of systems. � � .� � °��:�
<br /> 4. Grouting Matarials: a. Toilets and bathrooms.
<br /> a. Sand-Portland Cement Grout: ANSI A118.6. b. Laundries. � � ° °
<br /> b. Commercial Portland Cement Grout: ANSI A118.6. c. On-demand gas hot rvater heater. Fixture Refer to Floor Plans and Electrical Fixture Symbols Legend on Sheet E1.1. � � � � `"' '�
<br /> c. Dry-Set Grout: ANSI A118.6. 2. Do not cut structural elements without prior written approval. Schedule: 1. Recessed Cans: Juno Universal or equal.LED lamps substituted far a a ,o y �
<br /> 0 o v, � � �
<br /> d. Latex-Portland Cement Grout: ANSI A118.6. incandescent. � � " � � �
<br /> � oo � .� �
<br /> S u b m i tt a l s: l. S u b m i t p r o d u c t d a t a,p i p i n g t y p e s b y a p plication,warranties,o peratin g a.T y pical: 6",No.27C-WH24 trim(clear alzac),substitute equivil�nd LED
<br /> 5. Setting Accessories: �a
<br /> maintenance data. lamop for 65W PAR 30 incandescent. � � � � Q �
<br /> a. Cementitious Backer Units: ANSI A118.9. b. Wall Washer: 6"Umversal,I�1o.261-WH(white baffle),LED lamp equivilant
<br /> b. Waterproof Membrane: Elastomeric membrane meeting ANSI A 108 and A11$. Products: 1. Modify,relocate and extend existing plumbing system and service to accommodate new to 65 W PAR 30 incandescent.
<br /> For installation over concrete or cement backer board.Custom"Redgard", work,including new materials suitable for service intended complying with�pproved c. Wet-locations-Showers: 6"Universal,#9702(luminous collar),No.21 trim
<br /> Merecrete"Hydroguard 1",or apprived. submittals. Provide accessory materials such as hangers and pipe insulation. Provide d.4"recessed fixture: 17C-WH(clear alzac),with LED lamp equivilant to
<br /> c. Setting Buttons: Plastic buttons, fixtures complying with water consumption requirements and accessibility requirements. PAR20 incandescent.
<br /> d. Sealer for Floors: Colorless,slip-and stain-resistant sealer. e.Recessed Wall"Step Light":Juno Mini LBD Step I,ight(Outdoor)838 LED,
<br /> " Installation: l. Comply with requirements of Section 01000-Project Requirements. 3000K,Bronze fmish,IC115LEDHSG housing.2.
<br /> � Schedule: 1. Foyer,Rec Room,and Wine Cellar Floors: 2. Comply with applicable codes,regulations,ordinances and requirements of authorities 3. Strip FiYtures(length per plan):
<br /> Large format parcelain or stone tile,allow$3/s.f. for tile. Set with thinset latex modified having jurisdiction. Vent all fixtures. a.Closets: flourescent,single tube T8,programmed start,mounted above inside
<br /> cement mortar over crack prevention membrane. Latex portland cement grout. 3. Conceal all piping. door head. �
<br /> 2. Basement Bath Counter Top and Backsplash; 4. Maintain indicated fire ratings of walls,p,artitions,ceilings,and floors at pe�ietrations. 4. Under-cabinet Flourescent Fixture: Juno 22", 14W TS HE 3000K�amp, � � �
<br /> in to maintain f�re ratin . Appliance White. � � �
<br /> Allow$8/s.f. for tile. tnstall with thinset latex modified cement mdrtar over water Seal with firestopp g g
<br /> resistant gypsiun wallboard at walls and over I/4"backer board over'/4"plywood at 5. Coordinate location plumbing systems to avoid interference with location of designated 5. Track Lighting: Juno line voltage track system with open back spot lamp holders � Q,
<br /> ortland cement out. li htin fixture locations. for 50 watt halogen lamps. � � � Op
<br /> counters.Latex p gr $ g
<br /> 3. Laundry Room Backsplashes: To be selected by owner(allow$8/s.f, for tile)Install with 6. Test all systems for proper operation. 4. Surface Mounted Fixtures: �
<br /> thinset latex modified cement mortar over water resistant gy�sum wallboard:Latex 7. Instruct Owner's personnel in proper operation of systems. a. Foyer Pendant:Allow$250. � � � �
<br /> portland cemant grout. c. Bathroom Wall Sconces: allow$150 each.
<br /> Fixture Kohler fixtures,white,UN.O.Danze trim,brushed nickel finish,U.N,O. d. Ceiling Fixtures: allow$100 each. � � �i �
<br /> Installation: l. Comply with requirements of Section 01000-Project Requirements. Schedule: 1. Master Bath Under-counter Mounted Lavatories(Phase 2):Kohler"Ladena"K-2215, e. Extarior wall Sconces: allow$150 each. .
<br /> ard s ecifications and Tile Council of America vitreous china,white.Danze"Parma"D221558BN single handle counter mount 5. Exhaust Fans: Panasonic"Whipsper-Quiet Se.ries",(as indicated oh drawings) �+ � � ��
<br /> 2. Comply with ANSI 108 series stand p ,
<br /> Handbook for Ceramic Tile Installation. faucet/trim. with 4"or 6"vent duct as required.Review exterior vent locatians With architect
<br /> 3. Layout tile in grid pattern with alignment of grids,to provtde uniform joint width,and to 2. Toilets: TOTO Drake II,CST454CDF,two piece, 1.28 GPF,high profile(ADA)toilet on site befare installing. �+�-' � � Q�j
<br /> minimize cutting.Review layout with architect prior to installation. with upgraded"Oval Soft Close"seat. 6. Door Chimes:Nutone Wireless LA600 WH(white)with 128MB m�mory. � �1 r�
<br /> nd Powder Bath Shower Phase 2 : 7. Accessories:Provide related accessory materials as required for complete � � � �
<br /> 4. Grout,cure,clean and seal tile surfaces. 3. Master Bath a ( )
<br /> a, Wedi Fundo floor drain for tile/F'undo Shower System Assembly or mud pan operable system. Q�y �
<br /> SECTION 09550-WOOD FLOORING installation,stainless steel.
<br /> Products: 1. Hardwood Strip Flooring: Match existing solid wood strip flooring with tongue and b. Shower/Controls: Danze"Parma"D500558BN single handle shower control with END DIViSION 16
<br /> , groove in areas with existing hoard�vwod flooring. Swedish finish. Matching h•im, 3 function showerhead.All brushed nickel fmish.
<br /> . thresholds,and reducer strips. � c. Hand-held shower spray:Danze ID465005BN 3-function 24"slide bar assembl3�.
<br /> 4. Master Bath Tub(Phase 2):Acrylic oval soaking tub, Atlantis 3660"Petite" ,60"x 36"
<br /> Installation: 1. Comply with requirements of Section 01000-Project Requirements. x 23"soaking htb, drain and overflow kit.Danze"Parma'i D30578BN Roman Tub
<br /> 2. Blind nail-down installation at wood sub-floors. Faucet.
<br /> 5. Powder Bath(Phase 2)and Basement Bath counter mount�d Lavatories:K-2905
<br /> "Farmington,"vitreous china,self rimming. Danze"Parma"D225558$N single handle
<br /> SECTION 09660-RESILIENT FLOORING counter mounted faucet/trim.
<br /> Products: 1. Sheet Flooring:Refer to Section 01020-Allowances. Light commercial gr�de. Heat 6. Basement Bath Tub/Shower:Fiberfab#101 60"x36"x77"fiberglass tub/shower unit, or
<br /> welded seams.Provide edge strips and terminations. approved equal.Danze "Parma"D500058BN single handle pressure balande tub&
<br /> sho�ver faucet, brushed nickel valve/head/trim assembly.
<br /> Installation: 1. Comply with requirements of Section O 1000-Project Requirements. 7. Laundry/Utility Sinks: Counter mounted molded fibarglass,single basin,white. Mustee �� ��
<br /> 2. . Prepare surfaces by cleaning, leveling and priming. "Model 10",#671031000019 or equal.Allow$150 for trim.
<br /> 3. Leve1 to 1/8;;inch in 10 feet tolerance. 8. "On-Demand"Hot Water Heater(gas): Sized for fixtures serviced,A.O. Smith,Rheem;
<br /> 4. Install tile with tight joints and required patterns. . or approved equal.
<br /> 9. Accessories; Provide related materials as needed for complete operable system.
<br />
|