Laserfiche WebLink
C � <br /> �EGENDe � � � -: <br /> FUTURE CONDUIT <br /> FUTURE EQUIPMENT <br /> - - EMBEDDED CONDUIT <br /> . � � , � <br /> � <br /> - � � - - � - - - - - - �14 <br /> �— GE ERA OTESo � .� : <br /> I 2T066 UP � ' <br /> SEE SHT 3E11 1 . ALL CONDUITS AND CABLE TRAYS ARE SHOWN <br /> I DIAGRAMMATICALLY. FINAL LOCATIONS SHALL BE . <br /> 2T082 ST'I �,2 ESTAB�ISHED BASED ON CLEARANCE OF DUCTS AND <br /> I -a- - o � .� � � � .�' � � � ,� � TO 480V gOTT�OM TRAY — PIPING SYSTEMS. <br /> TRAY � <br /> FUTURE SP-15 Op Op SP-16 I � I I 2. ALL CONDUIT SHALL BE 1 " UNLESS NOTED � � <br /> 1 "C, 3�6, 6�14, #10G <br /> OTHERWISE. <br /> . p, h 7.5Hp, 3Ph 24" T AY <br /> MCC L MCC J <br /> �Hp, Ph 3. REFERENCE CABLE AND CONDUIT SCHEDULE FOR - <br /> PBC-266 TO 480V T 3T082 TO 480V TRAY � ��F CIRCUIT ROUTING. <br /> 1 "C .. <br /> 1 "C I BOTTOM OF TRAY I I <br /> � � 95'-0" OO F-� 4. REFERENCE SHE E T E 5 4 3 A N D E 5 4 4 F O R <br /> _ _ PBC-236 JOG INSTALLATION AND HANGER DETAILS OF CABLE TRAY ' <br /> I 3T066 UP • AND CONDUIT. <br /> SEE SHT 3 112 <br /> I � SF-15 �O PBC-1 9 60/� —� 5. ALL CONDUITS SHALL MAINTAIN A MINIMUM OF . <br /> TWELVE INCHES CLEARANCE FROM HOT WATER AND <br /> _ 50Hp, 3Ph STEAM PIPING. <br /> PBC 235 MCC J/VFD 3 . <br /> � OH , 3Ph 6. ALL CONDUIT, THIS DRAWING, SHALL BE RIGID <br /> AHU-5 � " 3 PBC-198 1 1 2"C CC GALVANIZED STEEL (RGS). . ��:� <br /> 1 1 2 C � � I ' <br /> 10Hp, 3Ph I � <br /> MCC L p 7. CONDUITS AND RACEWAYS, PENETRATING WALLS AND <br /> PBC-253 3 FLOORS DESIGNED AS FIRE BARRIERS, SHALL BE ' <br /> » SEALED PER SECTION 300-21 OF THE NEC. <br /> I � � <br /> HV-42 „ � � I . <br /> _ _ _ _ — _ _ _ _ ' 3 2 � � „ RE �ERENCE DRAW �1GSa <br /> ---�fl <br /> ------ MCC�L 0 1� REFERENCE SHEETS E534 AND E536 <br /> � FOR INSTALLATION OF EMBEDDED <br /> � ' BC-2 6 VM-2 _ <br /> CONDUITS. <br /> �- I 6 CCp,J 3P' 3 PBC-304 � ' . ��:�., <br /> I PBC-265I � � PBC-292 � <br /> � SF-9 „ ,. <br /> 2 2 � 75Hp, 3Ph O 2 C <br /> � � SP-10 � „� 2��� MCC P <br /> SP-9 S 12 � <br /> I D � MCC� KPh PBC-176 � � 75H , 3Ph ' R EM O�AL N OTES , � <br /> SHp, 3Ph �O �O � MCC �N D <br /> I MCC J <br /> 1�-j DISCONNECT WIRING FROM SUMP PUMP MOTOR. <br /> WING JACK I.S. JB PULL BACK TO JUNCTION BOX AND CUT. CONDUIT <br /> AND WIRING WILL BE ABANDONED IN PLACE. � <br /> - - - - �- - , - - - - - - - � - - - ' <br /> 2,.- REMOVE CONDUIT BACK TO JUNCTION BOX AND CAP <br /> PBC-305 PBC-239 JUNCTION BOX. �'. <br /> � 1 WING JACK POWER JB <br /> 3 <br /> � 3�- CUT CONDUIT AND WIRING ABOVE SEAL FITTING. <br /> � <br /> � I I � SF-10 � 1 "C SVP-2 BOXL RIRCONDUITKFITTINGEXR NEAREST JUNCTION <br /> o � � <br /> EMOVE CONDUIT BACK <br /> ,� 75H 3Ph �O 1 .5Hp, 3Ph TO NEAREST JUNCTION BOX OR CONDUIT FITTING <br /> �' _ MCCP�P FOR REROUTING. SEE CONSTRUCTIO . <br /> N DRAWINGS. <br /> o I SP 50 B -207 O MCC L , <br /> � <br /> � 0 <br /> � 7.5Hp, 3Ph SF-1 1 . � � ,� <br /> �o � I O MCC K I � ,� 75Hp, 3Ph � I I . <br /> 0 <br /> , MCC N O <br /> T 0 2 >> � .. <br /> � O <br /> .� _ � ��� <br /> � - - - - _ PR�;-�91 _ _ <br /> SF- I 3 <br /> � 2-1/2", 3 EACH-BELDEN� SP-49 <br /> � W � � 29536 3090CE, � PBC-267 � 75Hp, 3Ph � <br /> �' z ,�, 3/4", INSTRINSICALLY ' 7.5Hp, 3Ph <br /> o � 0 3088CE, 1475A MCC J � MCC Q A B C D <br /> I� SAFE-(3) BELDEN 1475A, AND (2) �14G � <br /> � � � (18) #14, #14G 14 <br /> m � w HRW-11 S -6 <br /> N �� PBC-296 �- _ OE110 OE111 OE112 i <br /> `� I 3 4H 3Ph I 1 C PBC 330 Hp Ph <br /> � P <br /> , <br /> , <br /> � 13 <br /> O . <br /> � ----�_ M CC N � C Q _ _ � ,, <br /> o� �_� <br /> � Op OE113 � OE114 � OE115 �2 <br /> � C MATCH LINE I I � <br /> � <br /> OE116 OE117 OE118 <br /> � SEE SHT. OE115 _ _ 11 <br /> � , <br /> U <br /> N <br /> ° OE119 OE120 OE121 <br /> N PBC-317 10 <br /> i <br /> � , �°:y . <br /> C �a <br /> � PART A� 277 /480� POWER P �AN SCALE: 1/8°°=, �—o�� KEY PLAN <br /> � � N <br /> o . <br /> w SCALE: 1/8„ -1 ,_0„ N.T.S. .. <br /> Q 0 2' 4' 8' 16' 32' <br /> m <br /> m <br /> Q <br /> m � <br /> � <br /> CASNE ENGINEERING, INC. � <br /> E ELEGTRICAL AND TECHNOLOGY CONSULTANTS <br /> IS S U E D F O R C 0 N S T R U C T I O�I �0604 NE 38th PL., SUI TE 205 KIRKLAND, WA 98033 <br /> m (425) 522-1000 WWW,CASNECOM JOB N0. 161-099 - <br /> � SYM - REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE ��,��'�� jyAS����� ACCEPTABILITY DRAWN DATE SUBTITLE PARTIAL BASEMENT CURRENT�EVISION SYMBOL DATE , , . � •t <br /> � RECORD DWG. LOCKWOOD GREENE 03.94 �`� `��a THIS DESIGN AND/OR CHECKED 277i480V POWER PLAN 3347480 D 07.19.17 <br /> �, o SPECIFICATION IS APPROVED SHEET <br /> � A HEX CHROME REDUCTION: 777-41/43 102506-00 CASNE 11.23.10 BOE,�� PPROVED eY DEPT. DATE ENGINEER TITLE 40-37 PAINT CELL SSG SUMP RELIABILITY 8c SAFETY <br /> � OE112R � <br /> B 777 ASM 11572815 CASNE DFW 04.26.13 cHECKEo <br /> �` 2s��o �' <br /> � C REPLACE HCS 9 & 10 — RECORD W1742988 CASNE/FSI DFW 09.20.13 ��'o�,��P�G � ��'�' APPROVED B U I L D I N G 40'�� �oB No. 1025066 COMP No. <br /> � rsT� � <br /> � D 40-37 PAINT CELL SSG SUMP RELIABILITY & SAFETYW3347480 CASNE 07.19.17 S`sI4NAL �� i� APPROVED DWG N0. . <br /> o��q� ELECTRICAL MASTER C-D/13-14 EVERETT, WA 40-37-OE112R ° <br />