Laserfiche WebLink
� �` , <br /> � ' �E� ENDo <br /> FUTURE CONDUIT <br /> OFUTURE EQUIPMENT : <br /> MATCH LINE � .� <br /> �- I I I SEE SHT. OE112 � <br /> -� - - � � <br /> ---_— 3 � � ��� GE �IERA� NOTESo � � �� <br /> � 1 . ALL CONDUITS AND CABLE TRAYS ARE SHOWN <br /> � 3 PBC-179 3 PBC-241 1 "C� � I DIAGRAMMATICALLY. FINAL LOCATIONS SHALL BE <br /> ESTABLISHED BASED ON CLEARANCE OF DUCTS AND <br /> I � PIPING SYSTEMS. <br /> I A 2. ALL CONDUIT SHALL BE 1 " UNLESS NOTED OTHERWISE. <br /> SP-12 <br /> `^� ., <br /> I SP-11 �� I I I 3. REFERENCE CABLE AND CONDUIT SCHEDULE FOR T <br /> 5Hp, 3Ph CIRCUIT ROUTING. <br /> � � MCC J � <br /> 5Hp, 3Ph ••. <br /> MCC L 4. REFERENCE SHEET E543 AND E544 FOR INSTALLATION <br /> — 1 1 \\\ AND HANGER DETAILS OF CABLE TRAY AND CONDUIT. <br /> --_ <br /> -_ <br /> �-----__—______ _�-- 2 2 RW-12 � I 5. ALL CONDUITS SHALL MAINTAIN A MINIMUM OF TWE�VE ' � <br /> - - - - - - - - - ' - INCHES CLEARANCE FROM HOT WATER AND STEAM <br /> I ---____ _ � "� P I P I N G. . <br /> ------_____ _-------_ _ <br /> I -------------- �O 6. A�L CONDUIT, THIS DRAWING, SHALL BE RIGID '<� ., <br /> I I GALVANIZED STEEL (RGS). <br /> I � 3/4Hp, 3Ph � � . <br /> MCC N 7. CONDUITS AND RACEWAYS, PENETRATING WALLS AND �� <br /> PBC-297 FLOORS DESIGNED AS FIRE BARRIERS, SHALL BE <br /> SEALED PER SECTION 300-21 OF THE NEC. � <br /> I I I I I � � <br /> RE �ERE �ICE DRAW f� GSe <br /> 1� REFERENCE SHEETS E534 AND E536 <br /> FOR INSTALLATION OF EMBEDDED ` �:. <br /> _ _ _ � _ _ _ � _ _ _ _ _ _ CONDUITS. T <br /> � SP-44 . <br /> 5Hp, 3Ph <br /> TO 480V TRAY SF- 6 <br /> MCC L HRW-16 60Hp, Ph <br /> SP-43 PBC-210 3 4H 3Ph MCC R 0 . . <br /> SHp, 3Ph O 0 I MCC R I • I I I <br /> MCC K O PBC-338 <br /> PBC-237 >, FUTURE T� FUT�IRE <br /> _ _ _ � � ��� 1 C - - PBC-339 - - � „� _- 480V 2„� R E �U <br /> _ _ _ _ To TRAY A M A OTESo .r . <br /> I - - - - - - - - - - - - - - - - 480V �� `� <br /> TRAY � 1�'j DISCONNECT WIRING FROM SUMP PUMP MOTOR. PULL <br /> BACK TO JUNCTION BOX AND CUT. CONDUIT AND <br /> ( �80V 2"� WIRING WILL BE ABANDONED IN PLACE. •�. <br /> 1 "C RAY <br /> PBC-321 PBC-325 2� REMOVE CONDUIT BACK TO JUNCTION BOX AND CAP <br /> - - - - - - - - - � - - � - - �— - - 12 JUNCTION BOX. <br /> I I I � � <br /> 1 "C HRW-� 7 O FUTURE 3T 86 120V TRAY FUTURE � 3�- CUT CONDUIT AND WIRING ABOVE SEAL FITTING. PULL <br /> 3/4 H p, 3 P h 2T 86 B O T T O M O F W I R W G B A C K T O N E X T N E A R E S T J U N C T I O N B O X O R . <br /> BC-240 MCC R 3T080 UP TRAY 95'-0" SF- 7 � <br /> CONDUIT FI�ING. REMOVE CONDUIT BACK TO <br /> � � SEE SHT 3E1 15 60Hp, , 3Ph DO REROUTINGU SEEI�CONS�TRU�CTION�NDRAWIN SING FOR � �, <br /> � �, � 2T080 UP I MCC R � � <br /> r z I o PBC-177 SEE SHT 3E1 15 <br /> o =, TO 480V TRAY � •. <br /> o � I � 1 "C PBC-311 24" PBC-313 <br /> � ~ W � ��� TRAY „ <br /> i � cn 480V TRAY 2 � . <br /> `� � BOTTOM OF I I � <br /> � O HRW-18 > „ <br /> 0 3/4Hp, 3Ph TRAY 94 - � � <br /> i - - - - - - MCC Q _ PBC-300 - - - <br /> � SF=fi8 <br /> .� PBC-1 4 1 "C 2 � 100H 3Ph O� R A B c � s� � <br /> a I PBC-21 >> PBC-298 MCC pP I I <br /> � 1C . <br /> � � 14 <br /> - SF-19 <br /> � SP-45 5Hp 3Ph � � OE110 OE111 OE112 <br /> � � 0 MCC L HRW-19 100Hp, 3Ph � 3 <br /> � 5 Hp, 3 P h I D O MCC N . � <br /> ° MCC J 3/4Hp, 3Ph I I I OE113 OE114 OE11 � 2 <br /> � MCC Q OO <br /> � SP-17 SP-18 <br /> o OE116 OE117 OE1 18 � � <br /> � <br /> �'��"...fi,., . <br /> � 5Hp, 3Ph 5Hp, 3Ph 1 <br /> OE119 OE120 OE121 <br /> � � MATCH LINE MCC J MCC K I I I � o <br /> N SEE SHT. OE118 T � <br /> � - - - - - - - - - - - - - - I I , 5 '" <br /> .o <br /> � � KEY PLAN <br /> ' N <br /> w SCALE: NONE <br /> / <br /> � • <br /> .�., , <br /> � <br /> � <br /> � PARTA� 277 480� POWER P �Af� 8� 4� 0 4� 8� , �� <br /> U <br /> O <br /> % SCALE: 1/8" =1 '-0" <br /> w <br /> m SCALE: 1/8»_� ,_�„ � $:,, <br /> m . <br /> Q <br /> m <br /> � <br /> CASNE ENGINEERiNG, INC. ��. <br /> � ELECTRICAL AND TECHNOLOGY CONSULTANTS <br /> I S S U E D F�R C�N S T R U C T I O N 10604 NE 38th PL., SUI TE 205 KIRKLAND, WA 98033 <br /> (425) 522-1000 WWW.CASNE.COM JOB N0. 161-099 <br /> � SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE .��. ' 8 DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE . <br /> � � oF WAsk �� ACCEPTABILITY D. MELWICK 4 6 92 PARTIAL BASEMENT � <br /> q � I� � THIS DESIGN AND OR CHECKED W3347480 A 07.19.� � <br /> � - RECORD DRAWING - LOCKWOOD GREENE 03.94 � � � <br /> � F,`�" o SPECIFICATION IS APPROVED D.ROBINSON 4 6 92 LIGHTING PLAN SHEEf <br /> � — RECORD DRAWING 11572815 CASNE DFW 04.26.13 PRovE� BY DEPT. DATE qNGBREWTON 4 6 92 TITLE 40-37 PAINT CELL SSG SUMP RELIABILITY & SAFETY <br /> � BOEi��' 0 E 115R <br /> � A 40-37 PAINT CELL SSG SUMP RELIABILITY & SAFETYW3347480 CASNE 07.19.17 CHECKED <br /> � � 2910 �.. A. BREWTON 9/25/92 ELECTRICAL MASTER � ���� <br /> � �p�' ��ISTE�� �'�' APPROVED JOB N0. COMP N0. � <br /> � �SSIONAL ��� �cjf�1 APPROVED _ _ DWG N0. <br /> � o� BLDG 40-37 COL. B C/12 13 EVERETT, WA 40-037-OE115R „ <br />