Laserfiche WebLink
� <br /> iS1E�lEIT . <br /> � HiTECT , � . <br /> �srw�t:�wRs�dr <br /> General Notes: <br /> RIDGE LINE A T LOWER RDOF . <br /> 1. Roof framing shall be factory engineered and prefabricated wood <br /> GUTTEI� W/DOWNSPOUT trusses. The supplier shall submit shop drawings for approval prior to � <br /> fabrication and submitted to the City of Everett as a deferred submittal. � �. ;�: <br /> � 48�-0�� See structural drawings for related supporting elements and roof � ` <br /> m sheathing requirements. � <br /> _ COMP.�1�lNGLES @ LOW W o ' <br /> i ROO�- SLOPE @ 4: l 2 N <br /> COMP Sl�lIVGLE ROOFING- - � <br /> 7YP�CAL ThROUGHOUT i q._ � �3�8 33 _ � 5�8 2. Roofing Materials: <br /> � 2� �unER w/oowNSPovT Apply composition roof shrngles per manufacturer's � � � , <br /> q.�.8�� � i �-4�/8° 7'- �%2° requirements over 30 Ib. roofing felt over roof sheath�ng in accordance � � �.._ � <br /> with published guidelines for installation by the National Roofing '' Q <br /> Contractor's Association Roofing and Waterproofing Manual. � V � Y <br /> � 4� � � �.� <br /> w _ ` <br /> _ <br /> � i i �- _ � . <br /> � � i ' i I m 3. Attic spaces shali be vented through eaves line vent strips as y�„ a �-- �, ,; <br /> � � <br /> detailed and continuous vent caps instailed continuously at all ridge 0 � — _ �� <br /> _� o ' i i lines. For detai l see s heet A 8 0 4. 0 � - _ � ., <br /> � . � i s�EEr MEra� cRicKEr @ (� � U �, . <br /> : . <br /> m i i BAYP�eo�ECTioNs 4. An insulation baffle shall be installed fora distance of 48" up s/ope � � <br /> � - � from the eve ventilation that will provide 2° c/ear vent space between � <br /> ' � the insulation and the underside of the roof sheathing. Q o <br /> � . . <br /> . ,, <br /> 4:l 2 COMP Sl�INGLE ROO� -_ c�i� �. <br /> .. <br /> cR�cKET @ .sNEo ooRn�ERs ' � 5. Storm water shall be collected in 5" min.. pre-finished metal gutters 0° ' ' <br /> _ - � � <br /> �v�ER w/oowrvsPovT �, conveying roof runoff to min.. 3"dia. metal gutters which are to be M � � <br /> GUTTER W/ ,: <br /> – connected to the under round storm water collection s stem. See �- <br /> � , DOWNSPOUT 9' Y <br /> , sheet A804 for gutter details. Any conflicts in downspout locations shall _ <br /> _ . <br /> be reported to the architect for resolution prior to installation. See Civil <br /> , - , <br /> drawings for subgrade storm water collection piping. <br /> : ��, <br /> , � . . <br /> 6. Sheet metal flashin at utters and rakes shall be refinished and = <br /> �, g g p <br /> � ,.., <br /> ' minimum 24 gauge, installed to a point 36" up s/ope from the gutters �and use �� <br /> — _ 09.15.16 ° <br /> , - for frost rotection and overla in the metal utter with a folded seam Permit A <br /> � � � p pp 9' 9' Pp• : <br /> FIRE RETARDANT TREATED � _� edge. ARCH SET <br /> PLYWODD ROO�SHEATING 48" � _ � m .SfIEET METAL CRICKET @ Permit App. <br /> 06.12.17 �;' <br /> BA Y PROJECTIONS <br /> EiTHER sioE o�con�n�oN 7. Where roof drainage crickets are shown, they shall be of plywood Replacement <br /> WALL GRID LINE - (AREA _ 09.15.17 � <br /> SfIADED) �" ' materral installed over the roof sheathing to provide positive drainage to Permit A . � <br /> – ` 4: l2 con�P.�H�N�LE RooF = _� the storm water collection gutters and scupper boxes. Waterproof <br /> _ _ <br /> cRicKET @ sHEo ooRn�ERs � ; ; membrane over the cricket shall be 22 gauge galvanized with no <br /> : : <br /> � � � exposed cut edges or approve liquid applied roof inembrane. .r . <br /> � . , .. � . . . . .. . . . � � . � � . . . . . . . .. . . . . � . .. --- � ..�.3_;�. <br /> COMP Sl lINGLE ROOFING- . . <br /> n�Pica� THRov�HovT 8. Roof to wall flashing shall be installed to a minimum of 24" above . <br /> i, <br /> , , the adjacent roof surfaces. Where adjacent to sloping roof surfaced <br /> - the flashing shall be stepped and integrated with the roof shingle <br /> o i _ _ , . <br /> , <br /> �. i -, cours�ng. <br /> '' GUTTER W/ - , � <br /> . _ <br /> '� ; _ _ - __ � ```� DOWNSPOUT <br /> - 9. Building flashing shall conform to standards promulgated by the <br /> - . <br /> - ' � i � SMACNA guidelines. ` <br /> o i , <br /> � ;: , <br /> � y <br /> � .. ... .'. . . .� ... ; ._ .. M .� ,� ����+ <br /> ��� <br /> � � � 10. Install R-38 batt insulation above the ceiling at the lower chord of � ' <br /> Sl-�EET METAL CRICKET @ • . <br /> U <br /> ' BAYPRo�ECTioNs the roof trusses over the entire heated areas of the units below insuring :: <br /> z � , . <br /> the full depth at the point where the trusses bear on the exterior wails. a1 — <br /> .. M <br /> s�oPE oowN @ �:�2 s�oPE oowN @ 4:�z _N instaU ventilation baffles in each truss space at eaves to insure �j z � � <br /> : <br /> ? adequate ventilation space. ,� � O Q , <br /> � _ �, � � U � <br /> _ � <br /> — <br /> _� � 11. Roofing shall be oc C/ass C rating tested in accordance with ASTM � � � � <br /> _ � , ; <br /> – N E-108 or UL 790. "� � c� <br /> m � � L ., <br /> j", <br /> . . . . . . . . . . . . � � <br /> GUTTER W/D(�WNSPOUT � -� c� <br /> 12. Roof decking within 48" of the townhouse common wall shall be of t� � Z � � :- <br /> o - fire retardant treated plywood, thickness, grade and fastening to be � � Q 0 �`- ,y' <br /> _ -� � � �, <br /> � � � per structural plans. � ' a� <br /> �- � � N � p � . <br /> _ N � z : <br /> � � N � a � <br /> � <br /> W , �- <br /> Q 3'-�%° 22'-5%° I I '- I I 3/" '- ' ° � � �LI Z � � . <br /> m 2 2 4 � � ��4 � � W <br /> 0 0 � o � . <br /> � <br /> w , <br /> J <br /> Q <br /> � � N O m <br /> N <br /> � GUTTER W/DOWNSPOUT J � W � �� <br /> �� � <br /> � y� �„ W a� <br /> � RooF P��v � N � <br /> � � N 0 � . <br /> o , <br /> U <br /> m <br /> � <br /> z � � � - <br /> o SCALE: %4" = 1'-0" <br /> � . <br /> J <br /> `_, <br /> � <br /> m . � . . . � :`�., <br /> iJ <br /> .:-_��.<_.'-., <br /> Y <br /> (� <br /> J ` <br /> � <br /> > <br /> � �. <br /> � , <br /> � <br /> � A204 <br /> o . � <br /> � <br /> � THREE T RY V'V D FRAI�/lE T WHH E TR T RE <br /> w s o 00 0 ovs s v� v . <br /> J - <br /> � �,, <br /> '� <br />