|
�
<br /> iS1E�lEIT .
<br /> � HiTECT , � .
<br /> �srw�t:�wRs�dr
<br /> General Notes:
<br /> RIDGE LINE A T LOWER RDOF .
<br /> 1. Roof framing shall be factory engineered and prefabricated wood
<br /> GUTTEI� W/DOWNSPOUT trusses. The supplier shall submit shop drawings for approval prior to �
<br /> fabrication and submitted to the City of Everett as a deferred submittal. � �. ;�:
<br /> � 48�-0�� See structural drawings for related supporting elements and roof � `
<br /> m sheathing requirements. �
<br /> _ COMP.�1�lNGLES @ LOW W o '
<br /> i ROO�- SLOPE @ 4: l 2 N
<br /> COMP Sl�lIVGLE ROOFING- - �
<br /> 7YP�CAL ThROUGHOUT i q._ � �3�8 33 _ � 5�8 2. Roofing Materials:
<br /> � 2� �unER w/oowNSPovT Apply composition roof shrngles per manufacturer's � � � ,
<br /> q.�.8�� � i �-4�/8° 7'- �%2° requirements over 30 Ib. roofing felt over roof sheath�ng in accordance � � �.._ �
<br /> with published guidelines for installation by the National Roofing '' Q
<br /> Contractor's Association Roofing and Waterproofing Manual. � V � Y
<br /> � 4� � � �.�
<br /> w _ `
<br /> _
<br /> � i i �- _ � .
<br /> � � i ' i I m 3. Attic spaces shali be vented through eaves line vent strips as y�„ a �-- �, ,;
<br /> � �
<br /> detailed and continuous vent caps instailed continuously at all ridge 0 � — _ ��
<br /> _� o ' i i lines. For detai l see s heet A 8 0 4. 0 � - _ � .,
<br /> � . � i s�EEr MEra� cRicKEr @ (� � U �, .
<br /> : .
<br /> m i i BAYP�eo�ECTioNs 4. An insulation baffle shall be installed fora distance of 48" up s/ope � �
<br /> � - � from the eve ventilation that will provide 2° c/ear vent space between �
<br /> ' � the insulation and the underside of the roof sheathing. Q o
<br /> � . .
<br /> . ,,
<br /> 4:l 2 COMP Sl�INGLE ROO� -_ c�i� �.
<br /> ..
<br /> cR�cKET @ .sNEo ooRn�ERs ' � 5. Storm water shall be collected in 5" min.. pre-finished metal gutters 0° ' '
<br /> _ - � �
<br /> �v�ER w/oowrvsPovT �, conveying roof runoff to min.. 3"dia. metal gutters which are to be M � �
<br /> GUTTER W/ ,:
<br /> – connected to the under round storm water collection s stem. See �-
<br /> � , DOWNSPOUT 9' Y
<br /> , sheet A804 for gutter details. Any conflicts in downspout locations shall _
<br /> _ .
<br /> be reported to the architect for resolution prior to installation. See Civil
<br /> , - ,
<br /> drawings for subgrade storm water collection piping.
<br /> : ��,
<br /> , � . .
<br /> 6. Sheet metal flashin at utters and rakes shall be refinished and =
<br /> �, g g p
<br /> � ,..,
<br /> ' minimum 24 gauge, installed to a point 36" up s/ope from the gutters �and use ��
<br /> — _ 09.15.16 °
<br /> , - for frost rotection and overla in the metal utter with a folded seam Permit A
<br /> � � � p pp 9' 9' Pp• :
<br /> FIRE RETARDANT TREATED � _� edge. ARCH SET
<br /> PLYWODD ROO�SHEATING 48" � _ � m .SfIEET METAL CRICKET @ Permit App.
<br /> 06.12.17 �;'
<br /> BA Y PROJECTIONS
<br /> EiTHER sioE o�con�n�oN 7. Where roof drainage crickets are shown, they shall be of plywood Replacement
<br /> WALL GRID LINE - (AREA _ 09.15.17 �
<br /> SfIADED) �" ' materral installed over the roof sheathing to provide positive drainage to Permit A . �
<br /> – ` 4: l2 con�P.�H�N�LE RooF = _� the storm water collection gutters and scupper boxes. Waterproof
<br /> _ _
<br /> cRicKET @ sHEo ooRn�ERs � ; ; membrane over the cricket shall be 22 gauge galvanized with no
<br /> : :
<br /> � � � exposed cut edges or approve liquid applied roof inembrane. .r .
<br /> � . , .. � . . . . .. . . . � � . � � . . . . . . . .. . . . . � . .. --- � ..�.3_;�.
<br /> COMP Sl lINGLE ROOFING- . .
<br /> n�Pica� THRov�HovT 8. Roof to wall flashing shall be installed to a minimum of 24" above .
<br /> i,
<br /> , , the adjacent roof surfaces. Where adjacent to sloping roof surfaced
<br /> - the flashing shall be stepped and integrated with the roof shingle
<br /> o i _ _ , .
<br /> ,
<br /> �. i -, cours�ng.
<br /> '' GUTTER W/ - , �
<br /> . _
<br /> '� ; _ _ - __ � ```� DOWNSPOUT
<br /> - 9. Building flashing shall conform to standards promulgated by the
<br /> - .
<br /> - ' � i � SMACNA guidelines. `
<br /> o i ,
<br /> � ;: ,
<br /> � y
<br /> � .. ... .'. . . .� ... ; ._ .. M .� ,� ����+
<br /> ���
<br /> � � � 10. Install R-38 batt insulation above the ceiling at the lower chord of � '
<br /> Sl-�EET METAL CRICKET @ • .
<br /> U
<br /> ' BAYPRo�ECTioNs the roof trusses over the entire heated areas of the units below insuring ::
<br /> z � , .
<br /> the full depth at the point where the trusses bear on the exterior wails. a1 —
<br /> .. M
<br /> s�oPE oowN @ �:�2 s�oPE oowN @ 4:�z _N instaU ventilation baffles in each truss space at eaves to insure �j z � �
<br /> :
<br /> ? adequate ventilation space. ,� � O Q ,
<br /> � _ �, � � U �
<br /> _ �
<br /> —
<br /> _� � 11. Roofing shall be oc C/ass C rating tested in accordance with ASTM � � � �
<br /> _ � , ;
<br /> – N E-108 or UL 790. "� � c�
<br /> m � � L .,
<br /> j",
<br /> . . . . . . . . . . . . � �
<br /> GUTTER W/D(�WNSPOUT � -� c�
<br /> 12. Roof decking within 48" of the townhouse common wall shall be of t� � Z � � :-
<br /> o - fire retardant treated plywood, thickness, grade and fastening to be � � Q 0 �`- ,y'
<br /> _ -� � � �,
<br /> � � � per structural plans. � ' a�
<br /> �- � � N � p � .
<br /> _ N � z :
<br /> � � N � a �
<br /> �
<br /> W , �-
<br /> Q 3'-�%° 22'-5%° I I '- I I 3/" '- ' ° � � �LI Z � � .
<br /> m 2 2 4 � � ��4 � � W
<br /> 0 0 � o � .
<br /> �
<br /> w ,
<br /> J
<br /> Q
<br /> � � N O m
<br /> N
<br /> � GUTTER W/DOWNSPOUT J � W � ��
<br /> �� �
<br /> � y� �„ W a�
<br /> � RooF P��v � N �
<br /> � � N 0 � .
<br /> o ,
<br /> U
<br /> m
<br /> �
<br /> z � � � -
<br /> o SCALE: %4" = 1'-0"
<br /> � .
<br /> J
<br /> `_,
<br /> �
<br /> m . � . . . � :`�.,
<br /> iJ
<br /> .:-_��.<_.'-.,
<br /> Y
<br /> (�
<br /> J `
<br /> �
<br /> >
<br /> � �.
<br /> � ,
<br /> �
<br /> � A204
<br /> o . �
<br /> �
<br /> � THREE T RY V'V D FRAI�/lE T WHH E TR T RE
<br /> w s o 00 0 ovs s v� v .
<br /> J -
<br /> � �,,
<br /> '�
<br />
|