My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2602 59TH ST SW 2019-09-18
>
Address Records
>
59TH ST SW
>
2602
>
2602 59TH ST SW 2019-09-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2019 8:49:30 AM
Creation date
9/18/2019 8:49:15 AM
Metadata
Fields
Template:
Address Document
Street Name
59TH ST SW
Street Number
2602
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FOR OFFICE USE ONLY PERMIT <br /> BUILDING <br /> PLANNING <br /> Bldg/re /Rem Size 2—qO s 7 Zoning Classification 1 <br /> Garage Size Ci 500 Overlay/Agreement <br /> VALUATION Nonresidential Use <br /> Number of Stories 1 Residential Use St'r`-- <br /> Occupancy Group Proposed No.of Dwelling Units: <br /> Occupant Load Total No. of Dwelling Units: <br /> Basement No.Yes_ Fin / Unfin Landscape or Planning Inspection <br /> Type of Construction needed before final? Yes_ No ✓ <br /> Existing Sprinkler System? Yes_ No_Unk_ Planning Inspector: <br /> Fire Sprinkler Required Yes_ No_ Phone#: <br /> Reason Approved by:;;' Date: I,112_)1-4.-- <br /> Existing Fire Alarm Yes_ No_Unk Historic Approved by: Date: <br /> Fire Alarm Required Yes_ No_ School Mitigation Reqd? Yes— No <br /> Reason Everett School Dist Muk. -• chool Dist <br /> RCW 64.55 MF worksheet req'd for permit? Yes No_ #of Net New Units: <br /> Add'I RCW 64.55 docs required prior to final?Yes_ No_ Calculated - ool Impact Fee: <br /> Architectural Approved By/Date: cJjI/ `42//L Sc •• Impact Fee Credit: <br /> Structural Approved By/Date: otal School Impact Fee Owed: <br /> Comments: zc,/,‘ i1/ Comments: <br /> Intake OK by: Intake OK Ok to route Hold <br /> Make this a"W"Permit? Yes No <br /> PUBLICWORKS, <br /> FSE$ INTAKE: Checked By: Date: <br /> Plan Check Fee Comments: <br /> Building Permit <br /> Surcharge High Hazard Sites(Dental/Medical,Animals, Mortuary,etc-Review for RPBA) <br /> Additional Plan Check 0 Public Works/Sys Dev/Traffic Mit./RPBA- NOT REQUIRED <br /> Plumbing Fee 0 Route for Public Works Review(bldg folder, PW Worksheet) <br /> Mechanical Fee 0 Public Works Permit-Concurrent Review(separate green folder) <br /> Ping Bldg Review Fee PW REVIEW: PW Reviewer: 27.4 Date: f/2-- <br /> Water Fee 0 PW Permit Approved-PW <br /> Sewer Fee 0 See PW Review Worksheet <br /> Systems Dev. FeePW Permit Not Required <br /> Traffic Mitigation Fee <br /> Public Works Fee <br /> FIRE DI=PgRTMENT. <br /> School Mitigation Fee Update/New Sprinklers Yes No_ Existing Bldg. <br /> Update/New Detection Yes_ No_ Existing Bldg._ <br /> Update/New Chemical Yes No_ Existing Bldg. <br /> Update/New Fire Service Yes_ No Existing Bldg._ <br /> Approved by: Date: <br /> Comments: <br /> Kofi YYE� <br />
The URL can be used to link to this page
Your browser does not support the video tag.