Laserfiche WebLink
Page 3 <br />Addendum no. 1 <br />UIPS - S13ARCO <br />Eastmont, Wash <br />4. Sheet #4 <br />a. Changes swing of <br />door 72IL23. <br />'i <br />5. Sheet 45 <br />}! <br />a. Shows elevation <br />of glass enclosure for <br />elevator, <br />.� <br />6. Sheet #6 <br />y <br />a. Shows a revised <br />section of steel stairs <br />with winders removed. <br />7. Sheet '17 <br />a. Revises sections to show that all first floor areas will have a <br />1 hour rated ciilino. <br />b. Interior- type•X core 5/8" gypsum board. <br />c. Exterior- Type X core 5/8" moisture gaurd gypsum board. <br />d. All ceilings so changed will be suspended by nailing as required <br />to 2x4 joists at 16" on center. <br />8. Sheet '"s <br />a. Door and Finish schedule revised. <br />Add door 30 <br />Rooms 211 u 212 to have ceramic tile floors and wainscot up 5' <br />9. Sheet #9 <br />a. Revised detail 18/9 <br />b. Omit detail 14/9 <br />10. Sheet 1, 10 .' <br />Voids original steel stairway section, see sheet 77# 6 for revised section. <br />11. Sheet 4t11 <br />a, shows depth and pitch of roof trusses. <br />b. Changes steel column at steel stairway. <br />c. Shows 5/8" gyp bd draft stop in attic. <br />12. Sheet #14 <br />a. Adds glass enclosure around elevator shaft. <br />13, Sheet ?15 <br />a. Specifies fire extinguishing equipment for kitchen exhaust hood. <br />b. Voids original electrical riser diagram. <br />c. revised electrical riser diagram attached. <br />GENERAL NOTES <br />1. Carpeting will be by others. <br />2. Spacing of roof trusses are revised to be placed at 41-0" on center <br />escept the flat roof trusses which will remain at 2'-0" on center. <br />SEE SHEET # 13. <br />