Laserfiche WebLink
Can you please tell me the process for modifying tower mounted equipment at an existing Wireless Communication <br />Facility? I believe it's a BP application (no separate land use), however I wanted to verify that, as well as the following: <br />• What forms are required? <br />• Number and size of drawings required (is 11" x 17" ok?) <br />• Number of structural reports required <br />• Any other submittal requirements? <br />Thanks, <br />John Eder <br />J4 Site Solutions, Inc <br />253-278-2902 (Mobile) <br />a ohn(a-)-*4sitesolutions.com <br />C21j) <br />