My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
711 100TH ST SE ALDEN LABS 2019-09-19
>
Address Records
>
100TH ST SE
>
711
>
ALDEN LABS
>
711 100TH ST SE ALDEN LABS 2019-09-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2019 7:28:41 AM
Creation date
9/19/2019 7:28:40 AM
Metadata
Fields
Template:
Address Document
Street Name
100TH ST SE
Street Number
711
Tenant Name
ALDEN LABS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9/11/2019 Page 1 <br /> City of Everett <br /> 11:16:02AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E1907-041 Site Address 711 100TH ST SE <br /> Applied 7/8/2019 Applicant Lot <br /> Approved 7/8/2019 Owner JOHNSON FAMILY LMT PRTNR Block <br /> Issued 7/8/2019 Contractor BOSCH ELECTRIC INC Tract <br /> Parent Permit No. Description 600AMP 277/480V NEW SERVICE&3 CORD DROPS FOR EQU <br /> Notes <br /> Scheduled Completed Tvne Inspector Result Remarks Inspector's Comments <br /> 7/9/2019 7/9/2019 ELEC 02-GROUND SKB PARTIAL APPR (7/9/2019 1:38 PM SKB) <br /> WORK Secondary duct bank extension on 240 volt. <br /> Secondary duct bank from Volt to building. <br /> 7/31/2019 7/31/2019 ELEC 05-SERVICE SKB CORRECTION Steve 425-870-7421 <br /> (7/31/2019 2:22 PM SKB) <br /> Provide physical protection for new service <br /> with bollards.Group your two disconnects <br /> for your service.Tie all services to one <br /> grounding electrode system.Label services <br /> one of two etc.Label AIC At services. <br /> 8/2/2019 8/2/2019 ELEC 05-SERVICE SKB APPROVAL eTRAKiT Inspection 8/1/2019 12:36 PM BOSCH ELECTRIC <br /> Request INC <br /> Contact Name:BOSCH ELECTRIC INC <br /> Site Address:711 100TH ST SE <br /> Phone:4253978765 <br /> e-Mail: boschelectricinc@outlook.com <br /> (8/2/2019 12:18 PM SKB) <br /> 600 amp service and disconnect with a 600 <br /> amp distribution panel behind it. <br /> 8/14/2019 8/14/2019 ELEC 09-FINAL SKB CORRECTION eTRAKiT Inspection 8/13/2019 1:59 PM BOSCH ELECTRIC <br /> Request INC <br /> Contact is Steve Shaw 425.870.7421 <br /> Contact Name:BOSCH ELECTRIC INC <br /> Site Address:711 100TH ST SE <br /> Phone:4253978765 <br /> e-Mail: <br /> BOSCHELECTRICINC@OUTLOOK.CO <br /> M <br /> (8/14/2019 1:49 PM SKB) <br /> Provide strain relief on cord drops etc. <br /> Provide bollards to protect service. <br /> 9/9/2019 9/9/2019 ADMIN USE KLC APPROVAL <br /> ONLY** <br /> 9/9/2019 9/9/2019 ELEC 09-FINAL MCB APPRVD-PERI eTRAKiT Inspection 9/6/2019 10:34 AM BOSCH ELECTRIC <br /> Request INC <br /> Reinspection <br /> Contact Name:BOSCH ELECTRIC INC <br /> Site Address:711 100TH ST SE <br /> Phone:4253978765 <br /> e-Mail: <br /> BOSCHELECTRICINC@OUTLOOK.CO <br /> M <br /> (9/9/2019 1:53 PM MCB) <br /> mcb changed Inspection Type from ELEC <br /> 08-OTHER to ELEC 09-FINAL <br /> INSP12CRWS 'd fPs1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.