Laserfiche WebLink
EVERETT WAC 296-46B-900: ELECTRICAL PLAN REVIEW <br /> DIRECTIONS: Read the WAC section below to determine if plan review is required or not required.Then select the box next to(a)to <br /> tell City Staff if plan review is not requried and select the box next to the specific reason from WAC 296-468-900. If plan review is <br /> .required, select the box next to(b)and(c)to acknowledge that plan review is required and the electrical plans have been provided <br /> with this permit application. <br /> *If item(a)-(ii, iii,or v)is selected,the work must also comply with section(a)-(vii). See arrow flow chart below, <br /> (3) E)rectricai plan review. <br /> IEi !I! (a)Electrical plan review is notreq;,ires4for: <br /> (i) Low voltage systems; <br /> 4--❑ (ii) Lighting specific projects that result in an electrical load reduction on each feeder involved in the project; <br /> I <br /> t (iii)Heating and cooling specific retrofit projects that result in an electrical load reduction on each existing feeder <br /> involved in the project, provided there is not a corresponding increase in the available fault current in any feeder. <br /> (iv)Stand-alone utility fed services that do not exceed 250 volts,400 amperes where the project's distribution system <br /> LI does not include: <br /> (A) Emergency systems other than listed unit equipment per NEC 700.12(F); <br /> (B)An essential electrical system defined in NEC 517.2;or <br /> (C)A required fire pump system. <br /> (v)Modifications to existing electrical installations where all of the following conditions are met: <br /> (A)Service or distribution equipment involved is rated not more than 400 amperes and does not exceed <br /> 250 volts or for lighting circuits not exceeding 277 volts to ground; <br /> (B)Does not involve emergency systems other than listed unit equipment per NEC 700.12(F); <br /> (C)Does not involve branch circuits or feeders of an essential electrical system as defined in NEC 517.2; <br /> and <br /> (D)Service or feeder load calculations are increased by 5%or less. <br /> (vi)Electric power production source(s)such as solar photovoltaic,fuel cell,or wind electric system(s)with a total <br /> Cl rating of 9600 watts or less. <br /> (vii)For installations in (a)(ii),(iii),and(v)of this subsection to be considered,the following must be available <br /> C-I to the electrical inspector before the work is initiated: <br /> i (A)A clear and adequate description of the project's scope; <br /> (B)A load calculation(s); <br /> (C)What the load changes are, providing both before and after panel schedules as needed;and <br /> (D)Provide information showing that the service and feeder(s)supplying the panel(s)where the work is <br /> taking place has adequate capacity for any increased load and has code compliant overcurrent protection' <br /> for that supply. <br /> 1 . NOTE: Electrical plan review is not required for"Medical, dental,and chiropractic clinic"of which is a clinic or <br /> physicians'office where patients are not regularly kept as bed patients for twenty-four hours or more,per section <br /> I (1)(c)(xii). <br /> (b)Electrical plan review is required for all other new or altered electrical projects in educational, institutional,or health care <br /> occupancies defined in this chapter. <br /> (c)If a review is required,the electrical plan must be submitted for review and approval before the electrical work is begun. <br /> I -. <br /> Table 900-1Table 900-2 <br /> Health or Personal Care Facilities Educational and Institutional Facilities,Places of Assembly,:or Other Facilities <br /> 8: Health or Personal Care acii ry Plan Review <br /> ' <br /> €- Type I Re Lilted Educational,Inscitu(iot1 sl or Plan Review <br /> _c . t, v,,.; Other Facility Types Required <br /> Aed 1-,,,,'f, 1 tJ <br /> ,-(i^ ..,I: <br />