My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5117 SEAVIEW WAY 2019-09-19
>
Address Records
>
SEAVIEW WAY
>
5117
>
5117 SEAVIEW WAY 2019-09-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2019 3:47:01 PM
Creation date
9/19/2019 3:46:49 PM
Metadata
Fields
Template:
Address Document
Street Name
SEAVIEW WAY
Street Number
5117
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Op <br /> PUBLIC ORKS PERMITAs <br /> �ateApplied: 8/3/2018 <br /> City of Everett Permit Services Public Works Permit#: PW1808-009 <br /> 3200 Cedar Street, 2' Floor sociated Bldg Permit#: <br /> Everett,WA 98201 Planning Reference#: 09, <br /> losi (425)257-8810 Public Works Fee: ,v-' 44. >,:A - <br /> 1 6 NOV 2018 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> ALEXANDER ALVAREZ ALEXANDER ALVAREZ <br /> 1108 B STREET SE 1108 B STREET SE <br /> AUBURN, WA, 98002 AUBURN, WA, 98002 <br /> PHONE: 4259718779 PHONE: 4259718779 <br /> TAX PARCEL ID#: 00567900300702 SITE ADDRESS: 5117 SEAVIEW WAY <br /> DESCRIPTION: REPAVE A DRIVEWAY <br /> (8/3/2018 9:43 AM BES) <br /> REPAVE A DRIVEWAY SAME WIDTH AS EXISTING <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 08-07-2018. <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starting construction and with <br /> other inspection requests. <br /> 6. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will be <br /> managed on-site in a manner that does not adversely affect neighboring properties, including the City's right-of-way and/or <br /> easements and the improvements located therein. <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br /> 8. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starting construction and with <br /> other inspection requests. <br /> 9. Protect all existing underground utilities during construction. <br /> 10. New driveway must be paved (asphalt or concrete). Driveway apron to be installed per City of Everett Standards <br /> Public Works Permit Fee Breakdown: <br /> Driveway $45.00 <br /> PW Plan Review $20.002 f7 n 6 <br /> PW Site Inspection $20.0011 �J <br /> NOV 16 2010 <br /> CITY OF EVERETT <br /> Permit Services <br /> 0 City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> 111inimm, harmless the City of Everett from any and all claims for damages,costs, <br /> V'�.., ` �i�� R>$ e expenses,or causes of action that may arise because of installation and <br /> ��! ���--�`� i 't� maintenance of the improvement or other right-of-way use here to applied <br /> pproved for Construction-' Iic Works) Dat- for and further agrees to remove same upon notice from the City and to <br /> replace public property damaged thereby. <br /> FINAL INSPECTION Date P" /or <br /> / ������� <br /> Approved as Constructed (PW Inspector) Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.