Laserfiche WebLink
INSPECTION REPORT " 'i f t'' <br /> 04Date id,"fa ePermit: /7�eal' Oar- <br /> Contractor: ] , Sr_ <br /> Owner: <br /> Site Address: 6 4 3o Q y M Pi'c__ O( <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> El Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units El Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK El Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid El Refrigeration ❑Rough in <br /> El Roof drains ❑Building Final ❑Gas Pipe Final '�HWT Final <br /> � <br /> OTHER OR CONSULTATION: !..__2 5_r.2 7 `. <br /> _ ?iti e <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL TH PER T <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> El OK FOR C.O. ❑ VIOLATION <br /> El UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION–24 hour notice required <br /> 1-- H'UlT ' h i4--N <br /> g -- <br /> d a...7____ t ./ m(...._ <br /> 0//,..,s,._...i.....s,,............._ <br /> Inspector: Date: w —/6i Vg <br /> EIR(10/06) DATABAR,INC. <br />