My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2410 PINE ST 2019-09-24
>
Address Records
>
PINE ST
>
2410
>
2410 PINE ST 2019-09-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2019 7:57:19 AM
Creation date
9/24/2019 7:57:19 AM
Metadata
Fields
Template:
Address Document
Street Name
PINE ST
Street Number
2410
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> EVERETT Permit Services <br /> WASHINGTON <br /> July 10, 2019 <br /> SAMANTHA A MCCRACKEN <br /> 2410 PINE ST <br /> EVERETT,WA 98201 <br /> RE: STATUS OF CITY OF EVERETT PERMIT(S) LOCATED AT 2410 PINE ST <br /> Work under this expired permit is no longer authorized. <br /> EXPIRED PERMIT NO.: M1812-077 <br /> DESCRIPTION OF WORK: REPLACE GAS WATER HEATER <br /> EXPIRATION DATE: 6/25/2019 <br /> Sections 105.5 and R105.5 of the International Building Code and International Residential Code state that <br /> permits become invalid if the work is not commenced or is suspended or abandoned for more than 180 <br /> days. <br /> 1. If work is complete, request a final inspection to close out the permit. <br /> 2. If work is continuing, request an inspection. <br /> 3. If work is currently suspended but will be pursued to completion within the next 6 months, request <br /> a permit extension through the Online Permitting Portal at pw.everettwa.gov.The reason for the <br /> extension is required. <br /> Please request inspections through the Online Permitting Portal at pw.everettwa.gov. Inspection requests <br /> submitted online by 11:59pm Monday-Friday will be tentatively scheduled for the next business day. If the <br /> volume of requests exceeds what can be completed the next business day,the remaining requests will be <br /> given priority on the schedule for the following business day. <br /> If no action is taken within 14 days of the mailing date of this letter,the expired permit record(s)will be <br /> closed without an approved final inspection. <br /> Continuing work after the permit is closed will require a new permit application and fees to inspect the work <br /> not finaled under the original permit. <br /> If you have questions or would like to discuss the status of the permit, contact our Permit Technicians at <br /> 425.257.8810, press option#8. <br /> 0 3200 Cedar Street © 425.257.8810 Oeveretteps@everettwa.gov <br /> Everett,WA 98201 425.257.8857 fax everettwa.gov/permits <br /> 7/10/19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.