Laserfiche WebLink
INSPECTION REPORT <br /> ,,..77:,,,,„,,,, _ <br /> Date 1-41* Permit: J&L 6/S <br /> Contractor: <br /> fie-AA Owner: <br /> Site Address: , _z_ _ <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ■amu.h In El Structural Slab ❑OK to insulate ❑OK to insulate <br /> �j El Framing ❑Rooftop Units [-]Water Service <br /> ■ . -.Ing ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OT- ',o=t ii•,SULTATION:_ <br /> [ / P-ROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FO' .-.0. ❑ CORRECTION REQUESTEDMI e El <br /> C.O. El VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> Inspector11,..7. <br /> Date: <br /> EIR(10/06) DATABAR,INC. <br />