My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snohomish County Port of Everett 9/19/2019
>
Contracts
>
Agreement
>
Interlocal Agreements
>
Snohomish County Port of Everett 9/19/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 7:10:15 AM
Creation date
9/24/2019 10:22:37 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snohomish County Port of Everett
Approval Date
9/19/2019
Council Approval Date
8/28/2019
Department
Parks
Department Project Manager
Bob Leonard
Subject / Project Title
Jetty Landing Restroom Development
Tracking Number
0002016
Total Compensation
$118,191.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Access Directions: Heading North 1-5 Take Pacific Ave./WA-529,Exit#193 toward City Center Turn left onto Pacific Ave.Turn right onto W Marine View Drive Turn left <br /> onto 10th St. <br /> Worksite Address: <br /> 620 10th Street <br /> Everett,WA 98201 <br /> Development Metrics (Outcomes, Benefits) <br /> Category/Work Type/Metric Application Answer Work Type Costs <br /> Buildings and Structures <br /> Construct/install restroom <br /> Total cost for Construct/install restroom $500,780.00 <br /> Number of restrooms 12 new,0 renovated <br /> Select the restroom type Restroom <br /> Provide the square feet of each restroom (2)family style @ 100 sf each(2)ADA stalls @ 60 sf each(8)stalls <br /> @ 18 sf each(2)urinals <br /> General Site Improvements <br /> Develop circulation paths or access routes <br /> Total cost for development of circulation paths or access routes $59,850.00 <br /> Enter length of circulation paths and routes by surface type-Asphalt 170 <br /> Minimum width of the circulation paths or access routes 36 <br /> Lighting provided(yes/no) Yes <br /> Install lighting(general security) <br /> Total cost for Install lighting(general security) $12,067.00 <br /> Number of general security lights installed 2 <br /> Install signs/kiosk <br /> Total cost for Install signs/kiosk $6,033.00 <br /> Number of kiosks 0 new,0 renovated <br /> Number of interpretive signs/displays 0 new,0 renovated <br /> Number of permanent entrance signs 2 new,0 renovated <br /> Project involves installation of informational signs(yes/no) Yes <br /> Install site furnishings <br /> Total cost for Install site furnishings $3,620.00 <br /> Select the site furniture/amenities Benches,Recycling/Trash receptacles <br /> Landscaping improvements <br /> Total cost for Landscaping improvements $24,134.00 <br /> Acres of landscaped area 0 04 <br /> Select irie iaiiuscepeTeawies irngatun,Native vugelauuii,1 reesislnuus <br /> Site Preparation <br /> General site preparation <br /> Total cost for General site preparation $80,970.00 <br /> Acres of site preparation 0.12 <br /> Buildings/structures to be demolished Restroom-37 years <br /> Select the site preparation activities Demolition,General site prep activities,Mobilization,Surveying, <br /> Traffic control <br /> Utilities <br /> Install communication utilities <br /> Total cost for Install communication utilities $3,017.00 <br /> Select the communication utilities Phone,Wireless internet <br /> Install power utilities <br /> Total cost for Install power utilities $12,067.00 <br /> Select the power utilities General service connection,Relocate/bury power utility <br /> Install sewage system <br /> Total cost for Install sewage system $3,620.00 <br /> Number of dump stations 0 new,0 renovated <br /> Select the sewer utilities Sewer connection <br /> Install stormwater system <br /> Total cost for Install stormwater system $2,413.00 <br /> Select the stormwater utilities Catch basins,Stormwater line <br /> Install water system <br /> Total cost for Install water system $3,017.00 <br /> Select the water utilities Water meter,Water service connection <br /> Cultural Resources <br /> Cultural resources <br /> Total cost for Cultural resources $2,500.00 <br /> Acres surveyed for cultural resources 0.12 <br /> Permits <br /> Obtain permits <br />
The URL can be used to link to this page
Your browser does not support the video tag.