My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snohomish County Port of Everett 9/19/2019
>
Contracts
>
Agreement
>
Interlocal Agreements
>
Snohomish County Port of Everett 9/19/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 7:10:15 AM
Creation date
9/24/2019 10:22:37 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snohomish County Port of Everett
Approval Date
9/19/2019
Council Approval Date
8/28/2019
Department
Parks
Department Project Manager
Bob Leonard
Subject / Project Title
Jetty Landing Restroom Development
Tracking Number
0002016
Total Compensation
$118,191.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.1 This Agreement may not be terminated by any party unless the Grant does not get awarded <br /> to fund the Project. If the Grant is not awarded by the RCO, or if the bids for construction of the <br /> Project exceed$939,084(which is the budget plus the contingency maximum amount),the Project <br /> will not proceed and this Agreement will automatically terminate. If the Grant is funded and the <br /> Port enters into a grant contract for this Project, this Agreement is valid for the duration of the use <br /> of the Grant funded facilities constructed as required by the Grant contract and regulations related <br /> thereto. <br /> SECTION 7. GENERAL INTERLOCAL AGREEMENT PROVISIONS <br /> 7.1 The parties will not form a separate entity to carry out the purposes of the Agreement. The <br /> Port shall be the administrator of the interlocal cooperative undertaking with authority, including <br /> but not limited to,undertaking Project planning, design, engineering,permitting, construction and <br /> ongoing maintenance and stewardship activities for the Project. The Port shall periodically report <br /> to the County and the City on mutually acceptable intervals and provide reasonable documentation <br /> so that the County and the City are informed. The Port will also respond to inquiries made by the <br /> County and/or the City about the interlocal cooperative undertaking. <br /> 7.2 Property that is acquired as a result of the Agreement will be held in the name of all three <br /> Parties unless it is determined and agreed by all three Parties that it should be held in the name of <br /> one or two of the Parties. If property is disposed of, it will be accomplished consistent with the <br /> grant contract or grant regulations or the agreement of the Parties. <br /> SECTION S. DISPUTE RESOLUTION <br /> 8.1 In the event of any dispute or difference arising by reason of this Agreement or provision <br /> or term thereof or the use of and/or payment for any facility or resource for the purpose of this <br /> Agreement, the dispute or difference shall be resolved jointly by the City Mayor, the County <br /> Executive, and the Port Executive Director, or their respective designee(s). Such decision shall be <br /> arrived at as expeditiously as possible.In the event it is not resolved after the Parties have discussed <br /> the issues and attempted to resolve the matters for a period of twenty(20) days, then agreed upon <br /> binding arbitration will be the next step to resolve the matter(s). <br /> SECTION 9.THIRD PARTY BENEFICIARIES <br /> 9.1 There are not third-party beneficiaries to this Agreement, and this Agreement shall not be <br /> interpreted to create such rights. <br /> SECTION 10. INTEGRATED AGREEMENT/AMENDMENT <br /> 10.1 This Agreement constitutes the entire agreement of the Parties, and may be amended at <br /> any time in writing by mutual agreement. <br /> SECTION 11. GENERAL PROVISIONS <br /> 11.1 This Agreement shall be effective upon the last of the authorized signatures of the <br /> Parties' representatives. <br /> 5 <br /> BNC\03221\0065\O 1021319.v <br />
The URL can be used to link to this page
Your browser does not support the video tag.