My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3927 RUCKER AVE BASE FILE 2019-09-24
>
Address Records
>
RUCKER AVE
>
3927
>
BASE FILE
>
3927 RUCKER AVE BASE FILE 2019-09-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2019 10:41:11 AM
Creation date
9/24/2019 10:41:00 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
3927
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/27/2019 City of Everett Page <br /> 2:34:30PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. B1804-013 Site Address 3927 RUCKER AVE <br /> Applied 4/4/2018 Applicant ALLEN RALPH Lot <br /> Approved 5/31/2018 Owner HEALTHCARE PARTNERS RE LLC Block <br /> Issued 6/8/2018 Contractor ALDRICH&ASSOC INC Tract <br /> Parent Permit No. Description REPLACE BLDG CLADDING,EXTEND EXISTING,ADD NEW <br /> Notes REMOVE EXISTING EIFS CLADDING/UNDERLYING BYP SHEATHING-INSTALL NEW 5/8" <br /> DENSGLAS GOLD SHEATHING AND OUTSULATION PLUS MD BY DRYVIT AND W/METAL <br /> CLADDING AT SLOPE WINDOW SILL RECESSES CONFORMING TO THE WSEC <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 7/24/2018 7/24/2018 BLDG KMK PARTIAL APPR East side in progress,appears per plan.OK <br /> 09-DRYWALL to continue. <br /> 7/27/2018 7/27/2018 BLDG KMK PARTIAL APPR South side-work in progress <br /> 09-DRYWALL Reports being provided by Evolution <br /> Architecture. <br /> 8/2/2018 8/2/2018 BLDG DWF OTHER 5/8"type X dens glass <br /> 09-DRYWALL West side <br /> Note:Special inspection by Evolution <br /> Architecture <br /> Provide a letter at building final. <br /> 8/9/2018 8/9/2018 BLDG KMK PARTIAL APPR Work in progress.See inspection reports <br /> 09-DRYWALL <br /> 9/7/2018 9/7/2018 BLDG DWF PARTIAL APPR #2 wall signs.Design by SSF.Metal plates <br /> 08-FRAMING OK for install. <br /> 9/12/2018 9/12/2018 BLDG DWF OTHER Awning framing(only) <br /> 08-FRAMING Brackets <br /> -1/4"#14 x2 length self tap screw <br /> 20 brackets 2'-0"and 4'-0"enters <br /> Still need plans. <br /> Just brackets installed. <br /> Installed on studs. <br /> 10/5/2018 10/5/2018 BLDG DWF PARTIAL APPR 3#footing for support canopy <br /> 02-FOOTING/SETB 2'x2' <br /> OK for concrete. <br /> 10/22/2018 10/22/2018 BLDG DWF APPROVAL As noted Approval for canopy subject to arch/eng <br /> 08-FRAMING design approval. <br /> 1/2 roof truss bracket. <br /> 4/17/2019 4/17/2019 BLDG DWF OTHER Dave 206-396-0279 <br /> 02-FOOTING/SETB <br /> (4/17/2019 9:21 AM DWF) <br /> Special inspection by Otto Roseau. <br /> Provide final letter of special inspection at <br /> Bldg final. <br /> 7/8/2019 7/8/2019 BLDG 15-FINAL DWF APPROVAL PM Inspection requested <br /> 7/8/2019 7/8/2019 ADMIN USE KLC APPROVAL <br /> ONLY** <br /> INSP12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.