Laserfiche WebLink
8/27/2019 City of Everett Page <br /> 2:34:30PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. B1804-013 Site Address 3927 RUCKER AVE <br /> Applied 4/4/2018 Applicant ALLEN RALPH Lot <br /> Approved 5/31/2018 Owner HEALTHCARE PARTNERS RE LLC Block <br /> Issued 6/8/2018 Contractor ALDRICH&ASSOC INC Tract <br /> Parent Permit No. Description REPLACE BLDG CLADDING,EXTEND EXISTING,ADD NEW <br /> Notes REMOVE EXISTING EIFS CLADDING/UNDERLYING BYP SHEATHING-INSTALL NEW 5/8" <br /> DENSGLAS GOLD SHEATHING AND OUTSULATION PLUS MD BY DRYVIT AND W/METAL <br /> CLADDING AT SLOPE WINDOW SILL RECESSES CONFORMING TO THE WSEC <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 7/24/2018 7/24/2018 BLDG KMK PARTIAL APPR East side in progress,appears per plan.OK <br /> 09-DRYWALL to continue. <br /> 7/27/2018 7/27/2018 BLDG KMK PARTIAL APPR South side-work in progress <br /> 09-DRYWALL Reports being provided by Evolution <br /> Architecture. <br /> 8/2/2018 8/2/2018 BLDG DWF OTHER 5/8"type X dens glass <br /> 09-DRYWALL West side <br /> Note:Special inspection by Evolution <br /> Architecture <br /> Provide a letter at building final. <br /> 8/9/2018 8/9/2018 BLDG KMK PARTIAL APPR Work in progress.See inspection reports <br /> 09-DRYWALL <br /> 9/7/2018 9/7/2018 BLDG DWF PARTIAL APPR #2 wall signs.Design by SSF.Metal plates <br /> 08-FRAMING OK for install. <br /> 9/12/2018 9/12/2018 BLDG DWF OTHER Awning framing(only) <br /> 08-FRAMING Brackets <br /> -1/4"#14 x2 length self tap screw <br /> 20 brackets 2'-0"and 4'-0"enters <br /> Still need plans. <br /> Just brackets installed. <br /> Installed on studs. <br /> 10/5/2018 10/5/2018 BLDG DWF PARTIAL APPR 3#footing for support canopy <br /> 02-FOOTING/SETB 2'x2' <br /> OK for concrete. <br /> 10/22/2018 10/22/2018 BLDG DWF APPROVAL As noted Approval for canopy subject to arch/eng <br /> 08-FRAMING design approval. <br /> 1/2 roof truss bracket. <br /> 4/17/2019 4/17/2019 BLDG DWF OTHER Dave 206-396-0279 <br /> 02-FOOTING/SETB <br /> (4/17/2019 9:21 AM DWF) <br /> Special inspection by Otto Roseau. <br /> Provide final letter of special inspection at <br /> Bldg final. <br /> 7/8/2019 7/8/2019 BLDG 15-FINAL DWF APPROVAL PM Inspection requested <br /> 7/8/2019 7/8/2019 ADMIN USE KLC APPROVAL <br /> ONLY** <br /> INSP12 <br />