Laserfiche WebLink
�} INSPE�CiTION REPORT <br />(�" Date: sly 6 ennit: <br />ELECTRICAL <br />❑ Temp Service <br />❑ Groundwork <br />❑ Stab/Conduit <br />❑ Rough In <br />❑ Service <br />❑ Grounding <br />❑ Ceiling Grid <br />lEleclrical Final <br />SITE WORK <br />❑ Footing drains <br />❑ Roof drains <br />OTHER OR CONSUL <br />TYPE OF INSPECTION REQUESTED <br />BUILDING <br />MECHANICAL <br />PLUMBING <br />❑ UFER ground <br />❑ Groundwork/Slab <br />❑ Groundwork/Slab <br />❑ Footing <br />❑ Rough In <br />❑ Rough In <br />❑ Foundation <br />❑ Ceiling Grid <br />❑ Ceiling Grid <br />❑ Structural Slab <br />❑ OK to insulate <br />❑ OK to insulate <br />❑ Framing <br />❑ Rooftop Units <br />❑ Water Service <br />❑ Insulation <br />❑ Mechanical Final <br />❑ Medical Gas <br />❑ Drywall Nailing <br />❑ Plumbing Final <br />❑ Shear Nailing <br />GAS PIPE <br />❑ Roof Nailing <br />❑ Rough In/Service <br />Hot Wale, Tank <br />❑ Ceiling Grid <br />❑ Refrigeration <br />❑ Rough In <br />❑ Building Final <br />U Gas Pipe Final <br />❑ HWT Final <br />❑ APPROVAL ALAPPROVAL <br />❑ OK FOR T.C.O. �COR -CTION REQUESTED <br />❑ OK FOR C.O. C TION <br />❑ UNABLE TO PERFORM INSPECTION: _ <br />❑ CALL (425) 257-8881 FOR REINSPECTION <br />FINAL APPROVAL THIS PERMIT <br />11 <br />24 hour notice required <br />EIR (4109) <br />Date: <br />1'^.1'^%yyn`]f(AY Y.... IM.IN.II��I��. ll. /11FJIww1 <br />