My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4418 RUCKER AVE MEDICAL BLDG 2018-01-02 MF Import
>
Address Records
>
RUCKER AVE
>
4418
>
MEDICAL BLDG
>
4418 RUCKER AVE MEDICAL BLDG 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2022 1:29:52 PM
Creation date
9/30/2019 2:04:11 PM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
4418
Tenant Name
MEDICAL BLDG
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PuB <br />hies c WORKS D00 Cedar <br />St <br />4L Utilities Division, 3200 Cedar Street <br />Everett IVA 98201 <br />425-257-8800 <br />Receipt # <br />Cost of Work Order <br />Cost of Service Order <br />Contact Person /%I/u A26-AsE <br />Requested By <br />properly Owner (name) 4eW141D7- .1�VES%uFjf/% U�490 <br />Date paid <br />Work Order# <br />Service Order # <br />Telephone# yls• ?Sy •:YZ� <br />Date of Request y'�j-OB <br />Charge Cost to (name if different than owner) <br />Address fP'dye zsrc City fir/ // 1,(//4 'Lip 1rBZ�3 <br />Installation Location ao,j <br />lnstallation type/description/size/etc .W140"M <br />irr/urif-S'L.%�LA�ri7r/ S�TL-Z-33ZF Gi.�, ifiA/Ct L�i�1Z /�.G1f.,EGTIotJ /-�!?d <br />The following estimate is based uporf the <br />materials. restoration, and final hook-up. <br />labor, equipment, <br />Please notify the City of Everett Utilities Division 10 working days in advance of required installation <br />date to allow for scheduling and parts procurement <br />Whenever the estimated cost is not sufficient to cover the total expense for labor, material, equipment rental and <br />administrative costs, the deficit shall be charged to the property for which such installation was made and the <br />owner thereof, and provided further, that any excess p. ymenl shall be returned to the person applying for the <br />installation. <br />`Deposit must be paid prior to ordering parts or scheduling work. <br />WATER AIE7TRS 3" AND LARGER A1AY NAVF. A SIX TO 10 WEEK LEAD TIME. <br />Material <br />Labor and Benefits <br />Equipment Rental <br />Tax <br />TOTAL <br />ZletplOO <br />yam, oa <br />UO <br />VZA/. 00 <br />Prepared by: /J//y��J Date Estitttatc Prepared <br />Accepted by: <br />s vcvemmk�aKd�Cua Wvcrs��srx� noc <br />Representing <br />ESTIMATE COOD FOR 6 MONTHS <br />cc: Bldg. Nnnit Center <br />Mark Sadler <br />Kirk Brooks <br />Gordon Witcher <br />Robert Waddle <br />Matt Welbom <br />Benyam Slephanos <br />Gerry Crum <br />Dennis Roberson <br />Cliff 1_indman <br />Randy Allen <br />—/ of, <br />
The URL can be used to link to this page
Your browser does not support the video tag.