My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4418 RUCKER AVE MEDICAL BLDG 2018-01-02 MF Import
>
Address Records
>
RUCKER AVE
>
4418
>
MEDICAL BLDG
>
4418 RUCKER AVE MEDICAL BLDG 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2022 1:29:52 PM
Creation date
9/30/2019 2:04:11 PM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
4418
Tenant Name
MEDICAL BLDG
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'NG/NEERING / PUBLIC SERVICES DEPARTMENT <br />January <br />Mr. Adam Clark <br />Gary Parkinson Architects <br />2812 Colby Avenue <br />Everett, WA 98201 <br />RE: Owner: Schmidt Investments Group <br />Job Address: 4418 Rucker Avenue <br />Plan Check No: B0801-027 <br />Dear Adam, <br />In response to your application for a construction permit, your plans have been examined and <br />you are advised that the issuance of a permit is being withheld for the reasons listed below. <br />These comments address building issues only. Additional revisions, or additions, may be <br />required by other departments (such as Utilities, Planning or Fire). All references refer to the <br />2006 International Building Code, as amended by the State of Washington and adopted by the <br />City of Everett and the Washington State Energy Code, 2006 Edition, unless stated otherwise. <br />In order for the processing of your application to continue, it will be necessary to provide <br />the Building Division with two complete new sets of drawings reflecting the corrections <br />requested. <br />City Amendment 3004-07, Section4, V, required the elevator to accommodate a 24" x <br />84" ambulance stretcher in the horizontal open position and identified by the <br />international symbol for emergency medical services (Star of Life). The symbol shall <br />not be less than 3" high and shall be placed inside on both sides of the hoistway door <br />frame. <br />2. IMC 306.5 requires a permanent roof access. <br />3. The shower in the second floor bathroom should be detailed to assure compliance with <br />the accessibility requirements of ANSI A117.1, 608.2. <br />Upon resubmittal of the drawings, your application will be given priority and plan review will <br />recommence. <br />All required submittals shall be of sufficient detail and contain sufficient information to ensure <br />that the proposed structure will be constructed in compliance with all adopted codes. <br />Sincerely, <br />Steve Miller <br />Associate Engineer <br />CITY OF EVERETf • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8800 • Fax (425) 257-8856 <br />Ill DIP CKNEUMMXR%M01427(I/I9 RUCRUR AVE) <br />
The URL can be used to link to this page
Your browser does not support the video tag.