My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5416 S 1ST AVE MORSE CONSTRUCTION GROUP 2018-01-02 MF Import
>
Address Records
>
S 1ST AVE
>
5416
>
MORSE CONSTRUCTION GROUP
>
5416 S 1ST AVE MORSE CONSTRUCTION GROUP 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2022 2:08:11 PM
Creation date
9/30/2019 2:54:18 PM
Metadata
Fields
Template:
Address Document
Street Name
S 1ST AVE
Street Number
5416
Tenant Name
MORSE CONSTRUCTION GROUP
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Plan Check No. 91/35127 <br />Page Two of Two <br />Building and Wall Sections* <br />* Provide sections to verify the lower level meets the definition of a <br />basement. <br />* Provide wall sections indicating required below grade dampproofing <br />per 1988 UBC Section 1707(d). <br />* Provide sections indicating the required 1 hour occupancy separation <br />between the lower office level and main floor apartment. <br />2. Provide a building valuation from the Snohomish County Assessor. <br />Existing buildings are required to provide an automatic fire suppression <br />system when altered or repaired to 50% of the buildings assessed value <br />within a 70 month period and when meeting the requirements for a new <br />building (6,000 square feet for Bx occupancies). <br />3. Space under stair cannot Le used per 1988 UBC Section 3309(f). <br />4. Provide mechanical ventilation for those rooms without operable windows. <br />5. Provide an exhaust fan for the printing/copy room and provide make-up air <br />to this room. <br />6. Supply evidence of conformance to the 1991 Washington State Energy Code. <br />7. Provide lighting power budget calculations per 1991 Washington State <br />Energy Code. <br />In order for the processing of your application to continue, it will be <br />necessary to provide the Building Department with two complete new sets of <br />drawings reflecting the corrections requested. <br />Upon re -submittal of the drawings, your application will be given priority and <br />plan review will recommence. <br />All of the above information shall be of sufficient <br />structure d wcontain <br />sufficient. information to ensure that the prop <br />osed ill be <br />constructed in compliance with the City Building Code. <br />Sections shall be applicable to plan submitted. <br />Sin <br />fre S. M1 <br />Ass ate Engingi neer/Buildinng <br />JM:cg/ <br />hldI17. 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.