Laserfiche WebLink
Project Summary <br /> Program:2018 City Safety Program <br /> Date: December 2018 <br /> Agency: City of Everett <br /> Contact: Timothy Miller, PE, City Traffic Engineer,425-257-8977,TMiller@everettwa.gov <br /> Project Title: Citywide Safety Flashing Yellow Arrow Improvements <br /> Project Number:Not yet assigned <br /> Project Description: Install flashing yellow arrow left turn traffic signal phasing that operates in red when a pedestrian <br /> presses a pushbutton. Install traffic monitoring cameras and switches. <br /> Detailed Project Description: The following work includes associated ADA and utility work as needed. <br /> A. Convert from protected/permitted to protected/flashing yellow arrow permitted phasing at the following intersections. Left <br /> turns will be prohibited when the pedestrian phase is on. <br /> 1. Hewitt Ave, and Oakes Ave. <br /> a. Westbound <br /> 2. Pacific Ave. and Rucker Ave. <br /> a. Westbound <br /> 3. Hewitt Ave. and Fulton St. <br /> a. Eastbound <br /> 4. Smith Ave.and 32nd St. <br /> a. Southbound <br /> 5. 41st St. and 40th St. <br /> a. Eastbound <br /> 6. Merrill Creek Pkwy.and Glenwood Ave. <br /> a. Northbound <br /> 7. Hardeson Rd. and 75th St. SW <br /> a. Northbound <br /> 8. E Casino Rd. and Fred Meyer Driveway <br /> a. Westbound <br /> 9. Colby Ave. and 52nd St. SE <br /> b. Northbound <br /> B. Install traffic monitoring cameras and switches at the following signalized intersections: <br /> 1. Hewitt Ave. and Oakes Ave. <br /> 2. Hewitt Ave. and Fulton St. <br /> 3. Smith Ave. and 32nd St. <br /> 4. 41st St.and 40th St. <br /> 5. Merrill Creek Pkwy.and Glenwood Ave. <br /> 6. Hardeson Rd.and 75th St. SW <br /> 7. E Casino Rd.and Fred Meyer Driveway <br /> 8. Colby Ave. and 52nd St. SE <br /> Page 1 of 2 <br />