Laserfiche WebLink
.J INSPECTION REPORT <br />Date &-30-0�7P�ennit: O D N p1 S <br />Contractor: <br />Owner: <br />'�- <br />Site Address: ___���_ S 3✓�� <br />ELECTRICAL <br />] Temp Service <br />❑ Groundwork <br />❑ Slab/Conduit <br />❑ Rough In <br />❑ Semico <br />❑ Grounding <br />❑ Ceiling Grid <br />❑ Electrical Final <br />SITE WORK <br />(] Footing drat <br />❑ Roof dm <br />TYPE OF INSPECTION REQUESTED <br />BUILDING <br />MECHANICAL <br />❑UFER ground <br />❑ Groundwork/Slab <br />❑ Fooling <br />[) Rough In <br />❑ Foundation <br />❑ Ceiling Grid <br />❑ uctuial Slab <br />❑ OK to insulate <br />J Framing <br />❑ Rooftop Units <br />❑ Insulation <br />❑ Mechanical Final <br />lJ Drywall Naiung <br />in -Shear Nailing <br />❑ Roof Nailing <br />❑ Ce4ing Grid <br />(-j Building Final <br />27 OR CONSULTATION <br />APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br />iJ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br />❑ OK FOR C.O. ❑ VIOLATION J <br />❑ UNABLE TO PERFORM INSPECTION�Dz)/Fvr <br />CALL (425) 25T-8881 FOR REINSPECTION - 24 hour notice requ ed (� <br />PLUMBING <br />❑ GroundworkrSlab <br />❑ Rough In <br />❑ Ceiling Grid <br />❑ OK to insulate <br />❑ Water Service <br />❑ Medical Gas <br />❑ Plumbing Final <br />GAS PIPE <br />❑ Rough IwService Hot Water Tank <br />F I Relrigeralion ❑ Rough in <br />❑ Gas Pipe Final ❑ HWT Final <br />Inspector: U-�- _ ate: _ <br />CtRpee61 (yl onTaen NC <br />