My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1310 SE EVERETT MALL WAY Geotech Report 2022-10-25
>
Address Records
>
SE EVERETT MALL WAY
>
1310
>
Geotech Report
>
1310 SE EVERETT MALL WAY Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 11:48:34 AM
Creation date
10/14/2019 8:43:55 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1310
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. r <br /> 2006 W gton State Nonresidential Energy Code Co ce Form <br /> 2006 Washington State Nonresidential Energy Code Compliance Forms Revised July 2007 <br /> Project Info Project Address sE Everett Mall way Date 4/4/2013 <br /> For Building Dept. Use <br /> Everett, WA (Snohomish County) <br /> Applicant Name: Daraen Restaurants <br /> Applicant Address: s - Fiii out tnis line on PRJ-SUM <br /> ApplicantPhone: 6 - Fill out this line on PRJ-SUM <br /> Project Description <br /> Briefly describe mechanical <br /> system type and features. <br /> ❑ Includes Plans Include documentation requiring compliance with commissioning requirements,Section 1416. <br /> �Simple System �Complex System �Systems Analysis <br /> Compliance Option �See Decision Flowchart(over)for qualifications.Use separate MECH-SUM for simple&complex systems.) <br /> Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on the <br /> plans. For projects without plans,fill in the required information below. <br /> Cooling Equipment Schedule <br /> Equip. CapacityZ OSA CFM SEER <br /> ID Brand Name' Model No.' Btu/h Total CFM or Econo? or EER IPLV3 Location <br /> AC- T� YHC120 1ZOOOO 4000 ECONO 11.30 RooF <br /> i,z,a <br /> AC-3,6 T� YHC102 93920 3400 ECONO 11.30 RooF <br /> AC-5 TRANE YHC151 144750 5000 ECONO 11.3� ROOF <br /> Heatin E ui ment Schedule <br /> Equip. CapacityZ OSA cfm <br /> ID Brand Name� Model No.' Btu/h Total CFM or Econo? Input Btuh Output Btuh Efficienc 4 <br /> MAU-1 CAPTIVEAIRE A3-D.750-G18 (����� 7135 7135 6�0��� 6����� 1�0.�00 <br /> Fan Equipment Schedule <br /> Equip. <br /> ID Brand Name' Model No.' CFM Sp� HP/BHP Flow Control5 Location of Service <br /> EF-1 CAPTIVEAIRE NCAIBFA 3750 1.35 2.00 CV KITCHEN HOOD <br /> EF-2 CAPTZVEAIRE NCAIBFA 3300 O.JO 1.SO CV KITCHEN HOOD <br /> EF-3 CAPTIVEAIRE NCAIBFA 3150 1.ZO 1.JrO CV KITCHEN HOOD <br /> EF-4 CAPTZVEAIRE DU33HFA 6�� �.']rj �.5� CV KITCHEN HOOD <br /> EF-5 CAPTIVEAIRE DU50HFA HOO O.J�O O. 'JrO CV DISHWASHER HOOD <br /> EF-6 CAPTIVEAIRE DD11FA Zlrj� 0.50 0.33 CV TOILET EXHAUST <br /> 'If available. z As tested according to Table 14-1A through 14-1G. 3 If required. °COP, HSPF,Combustion Efficiency,or AFUE,as <br /> applicable. 5 Flow control types:variable air volume(VAV),constant volume(CV), or variable speed(VS). <br /> /�� �"'��, '� <br /> �.._.�-�"" <br />
The URL can be used to link to this page
Your browser does not support the video tag.