My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1310 SE EVERETT MALL WAY Geotech Report 2022-10-25
>
Address Records
>
SE EVERETT MALL WAY
>
1310
>
Geotech Report
>
1310 SE EVERETT MALL WAY Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 11:48:34 AM
Creation date
10/14/2019 8:43:55 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1310
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2006 W � gton State Nonresidential Energy Code Co ce Form <br /> 2006 Washington State Nonresidential Energy Code Compliance Forms Revised July 2007 <br /> Project Info ProjectAddress sE Everett rraii waY Date 4/4/2013 <br /> For Building Dept. Use <br /> Everett, WA (Snohomish County) <br /> Applicant Name: Daraen Restaurants <br /> ApplicantAddress: 5 - Fill out this line on PRJ-SUM <br /> ApplicantPhone: 6 - Fill out this line on PRJ-SUM <br /> Project Description <br /> Briefly describe mechanical <br /> system type and features. <br /> ❑ Includes Plans Include documentation requiring compliance with commissioning requirements, Section 1416. <br /> U Simple System �Complex System �Systems Analysis <br /> Compliance Option �See Decision Flowchart(over)for qualifications.Use separate MECH-SUM for simple&complex systems.) <br /> Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on the <br /> plans. For projects without plans,fill in the required information below. <br /> Cooling Equipment Schedule <br /> Equip. Capacity2 OSA CFM SEER <br /> ID Brand Name' Model No.' Btu/h Total CFM or Econo? or EER IPLV3 Location <br /> AC- Trane YHC120A3 12���� 4000 YES �.1.3� <br /> 1,2,4 <br /> AC-3,6 Trane YHC102A3 93920 3400 YES 11.3� <br /> �+C-5 Trane 5cFv151C3 144750 5000 YES 11.30 <br /> Heatin E ui ment Schedule <br /> Equip. Capacity2 OSA cfm <br /> ID Brand Name' Model No.' Btu/h Total CFM or Econo? Input Btuh Output Btuh Efficienc 4 <br /> AC- Trane YxC120A3 122000 4000 YES 150000 122000 81.000 <br /> 1,2,4 <br /> AC-3,6 Trane YHC102A3 12���� 3400 YES 120�0� 972�0 81.��� <br /> Ac-s Trane YHC151C3 122000 5000 YES 150000 122000 81.000 <br /> rs�u-i Trane A3-D.750-G18 600000 7135 YES 600000 600000 100.000 <br /> Fan Equipment Schedule <br /> Equip. <br /> ID Brand Name' Model No.' CFM gp' HP/BHP Flow Controls Location of Service <br /> EF-1 CAPTIVE-AIRE NCA18-FA 3�]rJO 1.35 L.00 NA KITCHEN HOOD <br /> EF-2 CAPTIVE-AIRE NCA18-FA 3300 0.90 1. 'rJO NA KITCHEN HOOD <br /> EF-3 CAPTIVE-AIRE NCA18-FA 3150 1.ZO 1.SO NA KITCHEN HOOD <br /> EF-4 CAPTIVE-AIRE DU33HFA F)OO O.'],5 O. 'JrO NA KITCHEN HOOD <br /> EF-5 CAPTIVE-AIRE DU50HFA HOO O.SO O.SO NA KITCHEN HOOD <br /> EF-6 CAPTIVE-AIRE DD11FA ZSSO O.cJO 0.33 NA KITCHEN HOOD <br /> 'If available. 2 As tested according to Table 14-1A through 14-1G. 3 If required. 'COP, HSPF,Combustion Efficiency,or AFUE,as <br /> applicable. 5 Flow control types:variable air volume(VAV),constant volume(CV), or variable speed(VS). <br /> ,_ �^`/ c.� <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.