Laserfiche WebLink
NOTES: <br /> 1. FLEXIBLE RUBBER TUBE MUST BE ATTACHED TO EXTRACTION VALVE CLIP. MINI CHECK VALVE- <br /> SEE NOTE#5. � <br /> I NSTALLATION N OTES FOR VACU U M DRAI NAGE PI PI NG. 2. CONTROLLER MUST BE INSTALLED IN AN ACCESSIBLE LOCATION. EXTRACTION VALVE- I; <br /> 3.APPROPRIATE PIPE BRACING MUST BE 12"(305mm)AWAY FROM EXTRACTION VALVE ON BOTH SIDES TO ALLOW COUPLINGS TO SLIDE FREELY. SEE NOTE#3 AND#4 � <br /> 1. PRESSURE RATED PVC PIPE AND DWV PATTERN FITTW�S ONLY TO BE USED ON VACUUM SYSTEM. 4.TOP OF EXTRACTION VALVE MUST BE INSTALLED EVEN WITH TOP OF CASE AND CLEARANCE MUST BE PROVIDED TO ALLOW FOR UNOBSTRUCTED MOVEMENT. 1/4"I.D. FLEXIBLE RUBBERTUBE TARG ETOO <br /> FLEXIBLE RUBBER <br /> 2. PITCH VACUUM DRAINAGE PIPING AT A MINIMUM 1/4"per foot. 5. MINI CHECK VALVE MUST BE 4"ABOVE VACUUM SOURCE PORT WHEN X-VALVE IS MOUNTED HORIZONTALLY AND 12"ABOVE VACUUM SOURCE PORT COUPLINGS <br /> WHEN MOUNTED IN THE VERTICAL POSITION. 1 OOO NICOLLET MALL <br /> 3. VACUUM DRAINAGE RISER MUST ENTER MAINS FROM ABOVE USING A WYE FITTING. THE WYE FITTING MAY BE ROLLED 45�FROM VERTICAL. MINNEAPOLIS, MN 55403 <br /> 6.THE CONNECTION FROM THE ACCUMULATOR SENSOR PORT TO THE CONTROLLER MUST NOT DIP BELOW TOP OF ACCUMULATOR OR CONTAIN ANY TRAPS. PIPE BRACING- CONTROLLER- <br /> 4. NO TEE FITTINGS ARE PERMITTED IN THE VACUUM DRAINAGE PIPING. SEE NOTE#3 �A OWNER FURNISHED <br /> TOP OF REFRIGERATED CASE SE VLV SEE NOTE#2 <br /> 5. INSIDE PIPING SURFACES AND JOINTS MUST BE SMOOTH, FREE OF BURRS AND OBSTRUCTIONS. <br /> 6. LOCATE CLEAN OUTS IN THE VACUUM DRAINAGE PIPING AT THE ENDS OF MAINS AND BRANCHES,AND WHEN THERE IS A 90�CHANGE IN DIRECTION IN THE OVERHEAD BRANCH OR MAIN. o 0 <br /> 7. A SINGLE OFFSET IS ALLOWED IN VERTICAL RISERS. OFFSET IS NOT PREFERRED AND SHALL ONLY BE USED TO BYPASS STRUCTURAL OBSTRUCTIONS. o o �' <br /> 8. ISOLATION AND CHECK VALVES SHALL BE FULL PORT VALVES. 24"MAX. 1/4"I.D. FLEXIBLE RUBBER <br /> 9. USE ONE DWV LONG SWEEP 1l4"BEND WHEN THERE IS A 90 DEGREE CHANGE IN DIRECTION. <br /> • � � TUBE TO CONTROLLER- <br /> 0 0 0 0 o OWNER FURNISHED, SEE NOTE#6 <br /> 10. LAYOUT ILLUSTRATES GENERAL PIPING ARRANGEMENT. CONTRACTOR TO COORDINATE WITH GENERAL CONTRACTOR AND SPECIFIC INSTALLATION REQUIREMENTS FOR FINAL POINTS OF CONNECTION AND � ��� ����-�-�"� � � � � � �� � � �' <br /> PIPE ROUTING. ° ° � � <br /> SEE NOTE#1. <br /> www.ctagroup.com <br /> CONNECTION TO G <br /> G����� <br /> LIFT OR BRANCH MAIN '�O�P MAXIMUM PERMISSIBLE ROTATION WHEN ACCUMULATOR IS CONCEALED AND NOT SERVICEABLE, <br /> � ANGLE OF WYE,TO FACILITATE EXTEND SENSOR PORT AND FURTHEST AIR INTAKE TO TOP OF ° ° <br /> CONNECTION TO LIFT AND BRANCH CASES AND USE A WASTE FITTING AT THE BOTTOM OF AIR o 0 <br /> � MAINS. INTAKE FOR CLEANOUT ACCESS. <br /> X 45° 45° <br /> ��O`1� <br /> x <br /> VIEW X-X SENSOR PIPE 1 1/2"LIFT <br /> 2 CONNECTION OF LIFT BRANCH TO MAIN <br /> P431 NOT TO SCALE <br /> 0 0 <br /> EXTEND AIR INTAKE TO � � <br /> MATCH ELEVATION OF Date N�. Description <br /> CASE DRAIN OUTLET <br /> 02/05/18 PERMIT ISSUE <br /> CLEANOUT <br /> USE DWV COMBY <br /> FITTING FOR CLEANOUT <br /> ACCESS <br /> BRACING(TYPICAL) <br /> SLOPE MAINS OR BRANCHES � � <br /> 1/4"PER 12" <br /> � <br /> 36"MAX. CONDENSATE o 0 0 <br /> FLOW <br /> 45° <br /> SLOPE FLOW —�- 12 <br /> —� <br /> 0 <br /> TO VAC CENTER <br /> 1/4" �2„ F LOW <br /> �— 12" <br /> 1 112"PIPE <br /> 48"MAX. <br /> 3 TYPICAL SLOPE DETAIL 4 SLOPE MAKE UP DETAIL 5 TYPICAL PIPE ACCUMULATOR CONNECTION <br /> P431 NOT TO SCALE P431 NOT TO SCALE P431 NOT TO SCALE <br /> ALL PIPING MUST BE SUPPORTED, BRACED <br /> CLEANOUT REQUIRED AND SECURED TO RESIST THRUSTING FORCES <br /> � AND MINIMIZED MOVEMENT. <br /> ALL PIPING MUST BE BRACED PER ACORNVAC <br /> � SPECS OR PER LOCAL CODE REQUIREMENTS <br /> WHICHEVER IS MORE RESTRICTIVE. <br /> 36"MAX. <br /> � ALL BRACING ASSEMBLIES MUST BE ATTACHED <br /> TO STRUCTURAL STEEL, RIG�D STUDS, OR <br /> —v <br /> WOODEN BACKINGS. DRYWALL AND HVAC <br /> FLOW DUCT WORK ARE NOT ACCEPTABLE ANCHOR BEAM CLAMP WITH ANGLE BRACKET WITH <br /> MAINTAIN SLOPE POINTS. ALL THREAD&SPLIT ALL THREAD&SPLIT <br /> NOTES: RING HANGER RING HANGER <br /> SWING CHECK VALVE BRACING OF HORIZONTAL PIPING SHOULD BE <br /> 1. INSTALL CONTROLLER AND EXTRACTION VALVE tN READILY ACCESSIBLE LOCATION FOR SERVICE. IN FOUR FOOT INTERVALS WHEN INSTALLATION <br /> OWNER FURNISHED, <br /> 2. INSTALL MINI CHECK VALVE WITHIN 6" OF VACUUM SOURCE PORT. IS DONE IN PVC,AND EIGHT FOOT INTERVALS � <br /> FOR COPPER,OR AS REQUIRED BY LOCAL ��a�'��� <br /> FULL PORT ISOLATION VALVE. FURNISHED Q <br /> 3. IF THE TOTAL QUANTITY OF PRIMARY LIFTS EXCEEDS 6, CONTACT FACTORY ORAUTHORIZED REPRESENTATIVE FORAPPROVAL. AND INSTALLED BY PLUMBING CONTRACTOR. CODE. o Q a �_�j��;�'��sfd��f�� <br /> INSTALL IN ACCESSIBLE LOCATION. o , <br /> "y�� �, ���Y <br /> FLEXIBLE RUBBER 7'-0"MAX. —►- 7'-0"MAX. i ,Q <br /> SAGGING OF THE PIPING BETWEEN SUPPORTS ° n a � � � � ti �'� �,�•�y <br /> IS NOT PERMITTED; 1/4"PER FOOT OF SLOPE IS ' ^ '"'"' �='� � ��3 <br /> TUBE TO CONTROLLER MINI CHECK VALVE- = o a � '�` ' <br /> OWNER FURNISHED,TYP OWNER FURNISHED, TO BE MAINTAINED AT ALL TIMES. fl o� ,p �,,,.t <br /> SEE NOTE#2. 1-1/2" _ - p • ° �,� � 3�'3�} <br /> N <br /> SECONDARY LIFT LATERAL OR SEISMIC BRACING SHOULD BE = Q a ° �,,�5 <br /> f . `1 > <br /> ADDED EVERY 25 ORAS REQUIRED BY LOCAL 'a r� <br /> 12"-18" MAX p o � <br /> (2ND STAGE) CODE WHICHEVER IS MORE RESTRICTIVE. ° o <br /> - - ` � ° ° � <br /> WHEN A UNI-STRUT TRAPEZE IS USED, PIPING ° 6 a <br /> MUST BE CLAMPED DOWN SECURELY. ° ° < <br /> � - - OFFSET NO DOUBLE VERTICAL LIFTS ARE TO BE SECURED IN SIX PIPE STAND WELDED BRACKET <br /> 25'MAX OBSTRUCTIO � � i � OFFSET FOOT INTERVALS. <br /> i�/ i"I � � � OBSTRUCTI \ / � BRACING IS REQUIRED AT THE TOP OF ALL <br /> �-��2" OFFSET I ONS I / � VERTICAL LIFTS TO PREVENT HORIZONTAL AND <br /> TYP 12"HORIZONTAL \ f �OBSTRUCTIO � LATERAL MOVEMENT. <br /> MAX / AN APPROVED BRACING ASSEMBLY MUST BE n o • n o � a <br /> 1-1/2"PRIMARY LIFT,TYP. \ / <br /> (1 ST STAGE)-SEE NOTE#3. �j / � OFFSET / � o a e <br /> � � / INSTALLED WITHIN ONE FOOT OF EVERY a o n p � . a ' p �o <br /> � � DIRECTIONAL CHANGE, ON BOTH SIDES OF THE ,°Q �p ` °q �; Q � <br /> OFFSETS IN EXCESS OF 12"MUST — FITTING. � p � 4 <br /> RUN HORIZONTALLY WITH SLOPE OFFSET <br /> INTO COLLECTION POCKET BEFORE <br /> RESUMING LIFT. AN APPROVED BRACING ASSEMBLY MUST BE � <br /> � INSTALLED WITHIN ONE FOOT OF EVERY � <br /> ' � • � •• �- ' • d • Q ACCUMULATOR EXTRACTION VALVE,ON BOTH THE INLET AND <br /> . Q ' • ' , • � .• d . . ' . • • d. THE OUTLET SIDE. STRUT&STRUT TRAPEZE WITH STRUT&STRUT � <br /> . . • 4 ' • Q Q • • . • ACCUMULATOR CLAMPS CLAMPS � � <br /> � � <br /> 6 TYPICAL TWO STAGE LIFT DETAIL 7 ROUTING AROUND HORIZONTAL AND VERTICAL OBSTRUCTIONS $ TYPICAL BRACING DETAILS —� � <br /> P431 NOT TO SCALE P431 NOT TO SCALE P431 NOT TO SCALE � � <br /> � � <br /> � � � <br /> � � � <br /> TOP OF REFRIGERATED CASE � � — �- � CONTROLLER � W � <br /> i <br /> / � � <br /> .. , � WW <br /> , <br /> 1 1/2" PRESSURE RATED / � \ `_ <br /> PIPE(TYPICAL) � � LLI � <br /> � � 1/4"PER FOOT <br /> PIPE SLOPE OVERHEAD MAIN TO VACUUM CENTER � 1 ' 1 \ <br /> / MUST BE 16 FEET ABOVE FINISHED LL �� <br /> SENSOR PIPE � NOTE: 2"SWING CHECK VALVE FLOOR OR GREATER. SEE PIPING PLAN � (J� L�J <br /> \ OWNER FURNISHED, FOR PRESSURE RATED PIPE SIZE, BY <br /> / ° ° ° ° CLEANOUT 1.ALL COMPONENTS SHALL BE ACCESSIBLE FOR SERVICING. INSTALLED BY PLUMBING 7�_Q�� MAX. PLUMBING CONTRACTOR. L� <br /> ' CONTRACTOR. Q <br /> � EXTRACTION VALVE 2. EXTRACTION VALVES,CONTROLLERS,AND SWING CHECK VALVES SUPPLIED 2" PRESSURE RATED PIPE, � <br /> �� BY OWNERSAND INSTALLED BY CONTRACTOR. PLUMBING CONTRACTOR <br /> I� I 1 1/2" ISOLATION VALVE � (TYPICAL) <br /> I 3. REFER TO DETAILS ON SHEET P431 FOR ADDITIONAL INFORMATION. ABOVE ACT CEILING <br /> � � - <br /> � USE DWV COMBY FITTING 4. HEIGHT OF TWO AIR INTAKES MUST BE LOWER THAN THE INLET ;�__ <br /> 1 � FOR CLEANOUT ACCESS OF ANY DRAINS IT IS CONNECTED T0. <br /> I \ / 1/4"PER FOOT <br /> / PIPE SLOPE <br /> � � / ACT CEILING <br /> � CLEANOUT <br /> � \ o 0 0 0 <br /> 1 1I2"PIPE ACCUMULATOR \ � � - / 1 1/2" PRESSURE RATED <br /> PROVIDED BY CONTRACTOR. � � � PIPE RISER. RATED PIPE <br /> (TYPICAL). SEE DETAIL 5/P431. � � RISER BY PLUMBING <br /> ' \ //// CONTRACTOR Pro�ect Number � <br /> REFRIGERATED CASE REFRIGERATED CASE � �3�� <br /> I \ � _ � � // �_— 1 1/2" PIPE DOWN TO PIPE <br /> � ��-o��Max. Proto: P2001 Version: N/A Config: RR <br /> � � _ __ \ - - - 1l4"PER FOOT MAIN DRAIN LINE ACCUMULATOR.(TYPICAL) <br /> � PIPE SLOPE <br /> Drawn By J RD/TJ K � <br /> � / \ / � � <br /> / <br /> � Checked By <br /> I \ / EXTRACTION VALVE <br /> (TYPICAL) <br /> � � � <br /> / REFRIGERATED CASE REFRIGERATED CASE CHECK VALVE <br /> � � / <br /> \ / � REFRIGERATED CASE <br /> � ,� (TYPICAL) C O N D E N AT E <br /> � �� VACUUM DETAILS <br /> , , <br /> 9 TYPICAL TWO STAGE MULTI-CASE END DISCHARGE LIFT 10 TOP VIEW OF CASES <br /> P431 NOT TO SCALE P431 NOT TO SCALE <br /> 2/5/2018 10:12:12 AM <br /> 4 ,.�.. . . M,M.� . . <br /> � . . � — � - . � � . r'L.. y � � '���.:� . .W.{. . . . . , . t . y . . . <br /> ., - —�•. w..: ..P., t<�: 'pt.i� yt. <br /> . .. . e.. P.. . u' .. —a�"r..:. ..-.;: . u� . � �..: ..'.:. � .fl',ti-.:., .::�� . :R'.v..... . . ,. . <br /> .... ... .. .. . .� .. .•.�,� .. P.. . . •- � .:�. ..�;� . .:.:� .�'F. . ; ....�P`�t,::� <br /> . . . �... . . .. <br /> .. .. ,: . .'.. .� . � . ., . ,.,. ..'. 4.... ..�;. . ..� .. `'�'.� ,. '.`.-' . ..� �. `'�'f+ . Pw�.' <br /> . .�:�,. . .�... . � . .. . .. .�� . � . .. . �.. .. . � . . .. . �.. . �-. . .. .. . . . �:,. � . .. . �. . :�,. � . . . ... , �: . . � . .� . . . . . . . . . . . . . . <br /> .f.1 . . .� ..�t� . .(� ..� .S� .� ..4� . . .f: .C: .�. .C,: . :f:. ;'�'� ' 'f:'� ' .t�`.� .'{:'� ' . '.�R:�`� ' ,'P�.� � �t�',: ' . <br /> �.' . ... ..... . ... . . �-.' . ... . . . ... <br /> . ... . . ._.. <br /> ' .[. . . �. . �.' . .t. �� -�� . ... . . � �-.' . �.. . . �. . . �. <br /> ... . . ... � .. <br /> � <br />