My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA ST Recreation and Conservation Office (3)
>
Contracts
>
6 Years Then Destroy
>
2022
>
WA ST Recreation and Conservation Office (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2019 11:55:58 AM
Creation date
10/17/2019 11:55:30 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
WA ST Recreation and Conservation Office
Approval Date
8/27/2019
Council Approval Date
8/21/2019
End Date
5/31/2022
Department
Parks
Department Project Manager
Mark Harrison
Subject / Project Title
Forest Park Court Renovation RCO 18-2021D
Total Compensation
$154,111.00
Contract Type
Agreement
Contract Subtype
Interlocal
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
; '? WASHINGTON STATE RCO Project Agreement <br /> Recreation and <br /> Conservation Office <br /> Project Sponsor: Everett Parks&Recreation Department Project Number: 18-2021D <br /> Project Title: Forest Park Sport Court Renovation Approval Date:06/27/2019 <br /> Eligible Scope Activities <br /> ELIGIBLE SCOPE ACTIVITIES <br /> Project Metrics <br /> Sites Improved <br /> Project acres renovated: 0.52 <br /> Development Metrics <br /> Worksite#1, Forest Park Sport Courts <br /> General Site Improvements <br /> Develop circulation paths or access routes <br /> Enter length of circulation paths and routes by surface type: <br /> Asphalt 428 <br /> Lighting provided (yes/no): No <br /> Install general site structures <br /> Select one or more of the sheltered structures included in the None <br /> project: <br /> Select one or more of the surface structures included in the Retaining wall <br /> project: <br /> Install site furnishings <br /> Parking and Roads <br /> Parking development <br /> Number of vehicle parking stalls: 1 new, 0 renovated <br /> Number of vehicle with trailer parking stalls: 0 new, 0 renovated <br /> Number of accessible parking stalls: <br /> Vehicle 2 <br /> Vehicle with trailers 0 <br /> Select the parking surfaces: Asphalt <br /> Select the parking enhancements: Catch basins, Seal coating, Striping <br /> Site Preparation <br /> General site preparation <br /> Sport Courts <br /> Multi-purpose court development <br /> Select the surface types for multi-purpose courts: Impervious <br /> Select the multi-purpose court renovation elements: Add/upgrade court amenities, Replace <br /> surface <br /> Cultural Resources <br /> Cultural resources <br /> Permits <br /> Obtain permits <br /> Architectural& Engineering <br /> Architectural&Engineering(A&E) <br /> RCO: 18-2021 Revision Date: 1/1/2019 Page 5 of 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.