Laserfiche WebLink
ELECTRI �AL L GEN POWER REQUIRE � ENTS C � NDUIT LEN �TH CAI�CULATIONS ELECTRI �AL NOTES <br /> SYM SIZE DESCRIPTION REMARKS SYSTE�i SUPPLY POWER SUPPLY ���N IF SITE SPEClFIC CONDITIONS EXCEED THE FOLL0�11/ING ASSUMED �) COMPLIANCE: ELECTRICAL WORK SHALL BE IN COMPLIANCE WITH THE <br /> SUPPLIED AND INSTALLED �Y CONTRACTOR VOLTA�E CQ�ISUMPTION IM�cDf�NCE BR�K�� VALUFS THEN ADDITInNAL LENGTH M�J�T BE SUBTRACTE� �Y TH� NATIONAL ELECTRICAL CODE (NFPA-70), o.s.H.A. REGULATIONS, AS WELL AS <br /> (VOLTS) (kVA) �m�� (AMPS) ELECTRICAL CONTRACTOR FI�OM THE MAXIMUM CONDUIT LENGTHS APPLICA�LE REGULATIONS OF CITY, COUNTY, STATE AND FEDERAL AGENCIES. Stantec Consulting Services Inc. <br /> AO AS REQUIRED PULL BOX MOUNTED FLUSH WITH FINISHED WALL AT FLOOR LINE IN SHOWN LOCATION. ANCILLARY WIRING "M" LISTED. PROVIDE MATERIALS AND EQUIPMENT THAT �OMPLY WITH ANSI, IEEE AND 4100 194th Street SW,Suite 400 <br /> B 8" x 8" PULL BOX MOUN7ED BELOW FLOOR SLA� WITH 5"� SLEEVE RUNNIN� THROUGH FLOOR SLAB GANTRY CABLE ACCESS SYM�IA 3� IF DUCT LOCATIONS ARE ALTERED FROM THE SHOWN LAYOUT IT NEMA STANDARDS AND ARE U.L. LISTED AND LABELED. THE CONTRACTOR'S �ynnwood WA <br /> O SEE BELOW 400 �O WORK AND ALL EQUIPMENT INSTALLE� SHALL COMPLY WITH THE CURRENT Tel. 206.667.0555 <br /> ENDING FLUSH WITH FINISHED FLOOR IN SHOWN LOCATION. INTEVO EXCEL 480�1 O% IS THE ELECTRICAL CONTRACTORS RESPONSIBILITY TO EDITION OF THE NATIONAL ELECTRICAL CODE ADOPTED/ENFORCED BY THE �W.stantec.com <br /> B2 6" x 6" PULL BOX MOUNTED BELOW FLOOR SLAB WIYH 3"b SLEEVE RUNNING THROUGH FLOOR SLAB PHS CA�LE ACCESS UNDER AND INTEVO 2 RECALCULATE THE MAXIMUM CONDUIT LENGTHS. AUTHORITY HAVING JURISDICTION. <br /> ENDING FLUSH WITH FINISHED FLOOR IN SHOWN LOCATION. 51EMENS SU�PLIED COVER. THE PHS 2) QUALITY ASSURANCE: THE CONTRACTOR SHALL VERIFY EXISTING <br /> SYMBIA INTEVO EXCEL AND SYMBIA INTEVO 2 ASSUMED VALUES USED IN CALCULATING STATED MAXIMUM CONDITIONS IN THE FIELD TO INSUR� THAT THE NEW WORK WILL FIT INTO Copyright Reserved <br /> OC --- TRANSFORMER �REAKER IN NEMA 1 ENCLOSURE FLUSH MOUNTED. EXACT LOCATION DETERMINED SEE POWER SCHEDULE POWER, CONSUMPTION: _ CONDUIT LENGTHS: THE EXISTING STRUCTURE AS SHOWN ON THE DRAWINGS. SHOULD ANY TheContractorshallverifyandberespoosibleforalldimensions.DO <br /> BY CONTRACTOR BASED ON LOCATION OF 7RANSFORMER. DETAIL 2, THIS SHEET �'rjO.S kVA MAXIMUM POWER CONSUMPTION VERTICAL DUCTS - 10�-0" CONDITIONS EXIST OR BE DISCOVERED 1'HAT PREVENT THE INSTALLATION OF NOTscalethedrawing-anyerrorsoromissionsshallbereporfedto <br /> � � �� WORK AS SHOWN, TI-�IE CONTRACTOR SFiALL NOTIFY THE OWNER'S stantecwithoutde�ay. <br /> <3.5 kVA STANDBY FLOOR PENETRATIONS - 3 -0 REPRESENTATIVE PRIOR TO FABRICATION OF EQUIPMENT, OR THE st nt�pRrehtoductio�nogsefor�qnawingsaretheproperfyof <br /> � p y purpose other than that <br /> � --- EMERGENCY POWER OFF �UTTON WlTlml PROT'ECTIVE COVEFZ, MOUNTED ON WALL A1' S'-0" A�OVE SEE POWER SCHEDULE PERFORfVlANCE OF ANY WORK THAT MAY BE AFFECTED. DO NOT ALTER authorized by Stantec is forbidden. <br /> FINISHED FLOOR THAT PREVENTS RESETfING OF CIRCUIT BREAKER WHEN IN THE OFF POSITION. DETAIL 2, THIS SHEET NOTE: THE SPECT UNITS NEED TO BE WIRED SINGLE PHASE TO DRAWINGS, DIMENSIONS, OR SPECIFICATIONS IN ANY WAY WITHOUT <br /> NEUTRAL WITH APPROPRIATE �REAKER AND WIRE SIZE. CONTACTING AND ��CEIVING WRI�EN CONFIRMA�I(�N �ROM SIEMENS PROJECT Consultants <br /> O AS REQUIRED PULL BOX MOUNTED FLUSH WITH FINISHED WALL AT FLOOR LINE IN SHOWN LOCATION. IMAGE CONSTRUCTION SYS MANAGER. ALL DIMENSIONS ARE FROM FINISHED SURFACES. CONDUIT' AND <br /> PULL BOXES TO BE INSTALLED �Y THE CONTRACTOR WITH LOCAT'IONS BEING <br /> �� --- FIXED POINT DESIGNATION, SAME PULL BOX/OPENING AS ICS. IMAGE RECONSTRUC710N SYS "X-RAY ON�� ABOVE SUPPLIED �Y FIELD VERI�IED BY THE SIEMENS PROJECT MANAGER. <br /> WARNING LIGHT DOOR CONTRACTOR 3) POWER SUPPLY SOURCE: POWER SUPPLIES FOR SIEMENS HEALTHCARE <br /> C� AS REQUIRED PULL BOX MOUNTED �ELOW FLOOR SLAB WITFi 6"� SLEEVE RUNNING THROUGH FLOOR SLAB LINE CONNECTION BOX EQUIPMENT SHALL BE FROM A MEDICAL IMAGING PANEL OR BUILDING <br /> ENDING FLUSH WITN FINISHED FLOOR IN SHOWN LOCA710N. 13 SERVICE EQUIPMENT THAT IS A GROUNDED 3 OR 4-WIRE 'WYE' SOURCE PER <br /> �P --- MAIN PANEL WITH MAIN BREAKER FLUSH MOUNTED. SEE POWER SCHEDULE sE� sHE�r E2.00 THE SPECIFIC EQUIPMENT OPERATION REQUIREMENTS. A DEDICATED CIRCUIT <br /> DETAIL 2, THIS SHEET SHALL �E PROVIDED THAT !S KEP�f ENTIRELY FREE AND INDEPENDENT 0� <br /> �------------------------, <br /> „ �Po ciRcuiT , , ALL OTHER BUILDING WIRING. NO ELEVAI"ORS, GENERATO�S, PUMPS, HVAC OR Le end <br /> � AS REQUIRED PULL BOX MOUNTED BELOW FLOOR SLA� WITH 3 � SLEEVE RUNNING 7HROUGH 'FLOOR SLAB UF�S-FOR SPECT sEE sHE�r E2.00 2 � � SIMILAR EQUIPMEN7 SHALL BE CONNECTED T0 THE SAME CfRCIJIT OR g <br /> ENDING FLUSH WITH FINISHED FLOOR lN SHOWN LOCATION. � � i i MEDICAL IMAGING PANEL THAT SERVES THE SIEMENS HEALTHCARE EQUIPMENT. <br /> Ef'0 EPO i i -- --- - - - - IF THE POWER SUPPLY SOURCE DOES NOT MEET THE SPECIFIC SIEMENS <br /> � --- FIXED POINT DESIGNATION, SAME PULL BOX/OPENING AS ICS. � i i I� � <br /> w � � I EQUIPMENT POWER REQUIREMENTS, THE CONTRACTOR SHALL PROVIDE THE <br /> XF AS REQUIRED TRANSFORMER PROVIDING STEP DOWN POWER FOR THE SPECT SYSTEM. EXACT LOCATION SEE POWER SCHEDULE # Q HOT� i NECESSARY EQUIPMENT REQUIREQ TO ESTABLISH THE POWER SUPPLY IN <br /> NOTE 1 � i i I � ACCORDANCE WITH THE REQUIRED POWER SUPPLY PARAMETERS OF THE <br /> DETERMINED BY CONTRACTOR BASED ON LOCATION OF MP AND/OR SPS. DETAIL 2, THIS SHEET NC NC 8 ST M (80A� ; RELAY 24 V � � POTENTIAL- � SIEMENS EQUIPMENT. THE CONTRACTOR SHALL COORDINATE THIS WORK WITH <br /> NOTE #2 NO NO Z ; NORMALLY ; � FREE � THE CUSTOMER AND/OR UTILITY COMPANY FIELD REPRESENTATIVE. <br /> HD1 HD2 6" x 3 1/2" ELECTRICAL DUCT THAT RUNS HORIZONTALLY ON THE WALL AT THE FLOOR LINE AND SURFACE RACEWAY A (80A� MP � i OPEN i � CONTACT I 4) WORK FURNISHED �Y CONTRACTOR: WORK NOT PROVIDED BY SIEMENS <br /> MOUNTED ON FINISHED WALL AS SHOWN FOR EXCESS CABLE STORAGE. DUCT TO BE DIVIDED g B 20A I HEALTHCARE BUT SHOWN ON DRAWINGS TO BE FURNISHED AND INSTALLED <br /> � } � � � BY CONTRACTOR INCLUDES, BUT IS NOT LIMITED T0, THE FOLLOWING, <br /> INTO THREE SECTIONS WITH METAL DIVIDERS. -i NEUTRAL �________________________� i � UNLESS N07ED OTHERWISE: ELECTRICAL RACEWAYS AND DUCTS, WIRING <br /> 0 --- X-RAY ON WARNING LIGHT. SEE LIGHT FIXTURE SCHEDULE, � 6 �- � TROUGHS, PULL BOXES, CONDUITS, CIRCUIT BREAKERS, ACCESS PANELS, <br /> SHEET E2.00 2 � PIGTAILS ( EMERGENCY OFF BUTTONS, DOOR SWITCHES, WARNING LiGHTS, WIRING, <br /> O1 AS REQUIRED CONDUIT FROM POWER SOURCE TO "MP". SEE POWER SCHEDULE 10 XF x� I I WIRING DEVICES, CONNECTORS, LIGHTING EQUIPMENT AND GROUNDING. <br /> 5 RACEWAY AND CONDUIT NOTES: ALL CONDUITS SHALL BE INSTALLED IN <br /> DE7AIL 2, THIS SHEET I I COMPLIANCE WITH THE CURRENT ENFORCED EDITION OF THE NATIONAL <br /> O2 AS REQUIRED CONDUIT FROM "MP" TO "XF". SEE POWER SCHEDULE 3 � I I ELECTRICAL CODE. � <br /> DETAIL 2, THIS SHEE7 LINE I I CONDUIT BODIES SHALL NOT BE USED. WHERE A CONDUIT ENTERS A <br /> C C (25A) �OX, FITfING, OR OTHER ENCLOSURE, AN INSULATED THROAT CONNECTOR NOtes <br /> O3 AS REQUIRED CONDUIT FROM "XF" TO "C". SEE POWER SCHEDULE 4 BOXNEc�ION �CB RELAY WITH A 24 VOLT 1 A-DC SUPPLIED � � SHALL BE PROVIDED TO PROTECT THE WIRE FROM ABRASION. ALL <br /> D�AIL 2, THIS SHEET (s�EMENs BY ELECTRICAL CONTRACTOR. SIEMENS TO � � CONNECTORS FOR EMT SHALL BE COMPRESSION OR DOUBLE SET SCREW � <br /> Q4 AS REQUIRED CONDUIT FROM "C" TO "SPS". SEE POWER SCHEDULE UPS FOR SUPPLIED) PROVIDE CONTROL SIGNAL TO RELAY. � � TYPE. <br /> DEfAIL 2, THIS SHEET SPECT ALL OTHEFZ ITEM� ,4RE �U�PLIED AND �CEEP RACE4VAYS AT LErAST 6 {NCHES AWAY FROM PARALLEL RUNS OF <br /> (SIEMENS INSTALLED BY CONTRACTOR. I � FLUES OR STEAM AND HOT WATER PIPES. INSTALL RACEWAY RUNS ABOVE <br /> O 1/2"� CONDUIT FROM "SPS" TO "B". MAXIMUM CONDUIT LENGTH SUPPLIED) Sps 7 � I WATER AND STEAM PIPES PROVIDED THAT CABLE RUN DISTANCES ARE <br /> 64'-0" I I MAINTAINED. USE TEMPORARY CLOSURES TO PREVENT FOf�EIGN MATTER FROM <br /> O6 1 1 4"� CONDUIT FROM "MP" TO "A" LCB . SEE POWER SCHEDULE 5 BY CONTRACTOR � SIEMENS � ENTERING RACEWAY. <br /> � � � SPECT cT �SYMBIA GANTRY _J CONDUIT RUNS ARE SHOWN SCHEMATICALLY. INSTALL CONDUIT WITH A <br /> DETAIL 2, THIS SHEET GANTRY GANr�Y � MINIMUM OF BENDS IN THE SHORTEST PRACTICAL DISTANCE CONSIDERING <br /> 7O 1 1/4"� CONDUIT FROM "LCB" TO "B". MAXIMUM CONDUIT LENGTH (s�EM�Ns (SIEMENS THE BUILDING CONSTRUCTION AND OBSTRUCTIONS, EXCEPT AS OTHERWISE � <br /> , „ SUPPLIED SUPPLIED INDICATED. THE CONTRAC70R SHALL MAKE CERTAIN THAT ANY <br /> s4 -o NOTE: A WARNING LIGHT IS INCLUDED WITH THE SYMBIA SYSTEM, CONDUIT/RACEWAY RUNS CONTAIiVING SIEMENS HEALTHCARE CABLES �o NOT <br /> 8O AS REQUIRED CONDUIT FROM "MP" TO "EPO". 5�E POWER SCHEDULE B LOCATED ON TOP OF PATIENT BOOM �WING ARM. EXCEED THE SPECIFIED MAXIMUM DISTAfVCES AS SHOWN ON THE ELECTRICAL <br /> DETAIL 2, THIS SHEET DETAILS. LISTED CONDUIT SfZES FOR SIEMENS-SUPPLIED CABLES MUST BE _ <br /> MAINTAINED IN ORDER YO ENABLE THE TOT'AL CABLE BUNDLE INCLUDING <br /> O9 AS REQUIRED CONDUIT FROM "EPO" TO "EPO". SEE POWER SCHEDULE ITEM QTY DESCRIPTION 3 AU�ILIARY WI�INC� CONNECTORS TO BE PULLED THf20UGH WITHOUT DAMAG�. <br /> DETAIL 2, THIS SHEET PROVIDE ENCLOSED METAL WIRE DUCT RACEWAY SYSTEM WHERE SHOWN <br /> 10 AS REQUIRED CONDUIT FROM "EPO" TO "SPS". SEE POWER SCHE[�ULE MP 1 MAIN PANEL WITH CIRCUIT BREAKER FLUSH MOUNTED. E3A0 SCALE:NONE ON DRAWINGS WITH DIVIDERS T0 SEPARATE THE DUCT INTO 7W0 OR THREE <br /> DETAIL 2, THIS SHEEf � SEPARATE COMF'AR7MENTS AS SHOWN ON THE SIEMENS PLANS (FOR POWER <br /> MAIN BREAKER MUST HAVE TRIPPING DEVICE SO WHEN AND SIEMENS HEALTHCARE CABLING). DIVIDERS AND CROSSOVER PIECES TO <br /> 11 --- NOT USED. M � ANY EPO IS PRESSED, THE BREAKER TRIPS. BE PROVIDED AS NECESSARY. THE CABLE TO CABLE AS WELL AS THE <br /> CIRCUIT TO CIRCUIT SEPARATION REQUIREMENT WAS EVALUATED DURING THE <br /> 12 --- NOT USED. MAIN BREAKER AMPS: 80 UL SYSTEM CERTIF'ICATION OF THE EQUIPMENT. ADDIT'IONAL SEPARATION OF . <br /> C�ENERAL NOTES: THE SYS`TEM CABLE ASSEMBLIES INTO SEPARATE OR PARTITIONED RACEWAYS, <br /> VOLTS PHASES NEUTRAL GROUND TOTAL WIRES UNLESS OTHERWISE NOTED, IS NOT NECESSARY TO INSURE SEPARATION OF <br /> 13 1/2"� CONDUIT FROM "B" TO "WARNING LIGHT" (X-RAY ON). SEE AUXILIARY WIRING 1. THE INFORMATION ON MRI WAS TAKEN FROM SIEMENS MRI (SITE SPECIFIC) SUPPLIED DRAWINGS CiRCUITS. <br /> DETAIL 3, THIS SHEEf q.���2��Y 3 1 1 5 AND EDITED. CONTRACTOR SHALL OBTAIN A COPY OF SIEMENS SITE SPECIFIC FINAL SHOP PROVIDE WIRE DUCT/RACEWAY WITH ACCESSIBLE REMOVABLE COVERS. <br /> O14 AS REQUIRED CONDUIT FROM "WARNING LIGHT" X-RAY ON TO "WARNING LIGHT" X-RAY ON . SEE AUXILlARY WIRING DRAWINGS. IF THERE ARE ANY DISCREPANCIES BE7WEEN THE ELECTRICAL DRAWIN6S AND THE LOCATIONS OF BUILDING MATERIAL OPENINGS (I.E. ACCESS PANELS) TO BE <br /> ( ) ( > DETAIL 3, THIS SHEET BREAKER AMPS: 80 (FOR LINE CONNECTION BOX "LCB" SIEMENS SUPPLIED DRAWINGS, REQUEST INFORPAATION FROM THE ELECTRICAL ENGINEER PRIOR TO CUT IN FIELD ARE TO �E COORDINATED WITH THE DRAWING REQUIF2EMENT� <br /> A 1 DOING ANY WORK. AND BUILDING STRUCTUR�. THOSE THAT ARE NOT INDICA7ED OR INTERFERE <br /> AND CT GANTRY "B" SIEMENS CONTACT, MR. DOUG LISSER � 360 515�1397 WITH �UILDING ELEMENTS SHALL BE COORDINATED WITH SIEMENS PROJECT <br /> 15 (2) 3"� CONDUIT "B" TO "ICS". ' MAXIMUM CONDUIT LENGI"H � � MANAGER. ELECTRICAL PULL BOXES AND RACEWAY COVERS SHALL BE <br /> 53'-0" VOL75 PHASES NEUTRAL GROUND TOTAL. WIRES 2. CONfiRM ALL GROUNDING REQUIREMEN7S WITH TFiE FINALIZED SITE SPECIFIC DRAWINGS. INSTALLED IN A MANNER TO ALLOW ACCESSI�ILITY FOR INSTALLATION AND <br /> 16 1 1/2"� CONDUIT FROM "LCB" TO "UPS". MAXIMUM CONDUIT LENGTH MAINTERIANCE. CONTRACTORS MUST PROVIDE PULL STRINGS FOR ALL CONDUIT - <br /> 64'-0" 480Y�277Y 3 1 1 5 3. PROVIDE AND COORDINATE ALL DUCT RUNS AS SHOWN ON THE FINAL SITE SPECIFIC S{EMENS AND WIRE DUCT/RACEWAY. IN-FLOOR T�ENCH DUCT AND FLUSH FLOOR <br /> DRAWINGS. COORDINATE ALL WORK WITH OTHER TRADES PRIOR TO BEGINNING ANY WORK. BOXES SHALL BE PROVIDED WITH FULLY GASKETED REMOVABLE COVERS. <br /> 17 3"� CONDUIT FROM "B" TO "B2". MAXIMUM CONDUIT LENGTH B 1 BREAKER AMPS: 20 (FOR TRANSFORMER "XF") WHEN JUNCTION �OXES AND WIRE DUCT/RACEWAY ARE MOUNTED <br /> 13'-0" 4. REFERENCE SIEMENS SITE SPECIFIC DRAWING SHEETS FOR ADDITIONAL INFORMATION. HIGHER THAN 14 FEET A�OVE FINISHEI� FLOOR, THE ELECTRICAL CONTRACTOR <br /> VOLTS PHRSES NEUTRAL GROUND TOTAL WIRES SHALL PROVIDE 7W0 ELECTRICIANS TO HELP THE SIEMENS INSTALLERS PULL <br /> SIEMENS SUPPLIED CABLES AT CUSTOMER'S EXPENSE. WHEN JUNCTION <br /> 480 � 0 1 3 BOXES AND WIRE DUCT/RACEWAY ARE MOUNTED ABOVE A HARD CEILING (I.E. <br /> ��� -L2� ��q� N�-�E�; SHEET ROCK), A 24" x 24" ACCESS PANEL IS REQUIRED AT EACH JUNCTION <br /> C � N T R A C T 0 R S U P P L I E D C� � L E S �OX AND WITHIN 2 FEEf OF EACH RACEWAY TRANSITION (SUCH AS A 90 <br /> C 1 BREAKER AMPS: 25 (FOR UPS FOR SPECT "SPS"� 1�REFERENCE POWER PLAN DETAIL 2, SHEET E2.00, FOR CIRCUIT. DEGREE ELBOW OR TEE) IN DUCT/RACEWAY. THERE MUST �E FREE AND <br /> CLEAR ACCESS TO JUNCTION BOXES AND WIRE DUCT/RACEWAY. WHEN <br /> VOLTS PHASES NEUTRAL GROUND TOTAL WIRES �REFERENCE LIGHIING PLAN DE7AIL 1, SHEET E2.00, FOR CIRCUIT. ACCESS PANELS ARE LOCATED MORE THAN 3 FEET FROM JUNCTION BOXES <br /> FROM VIA TO DESCRIPTION REMARKS AND WIRE DUCT/RACEWAY THE ELECTRICAL CONTRACTOR SHALL PROVIDE TWO <br /> 240 1 0 1 3 ELECTRICIANS TO HELP SIEMENS INSTALLERS PULL SIEMENS SUPPLIED <br /> POWER 1 MP 3-PHASE CONDUCTORS, 1 NEUTRAL AND GROUND ALL TO BE THE SAME SIZ�. SEE SHEEf E2.00 CABLES AT CUSTOMER'S EXPENSE, � <br /> SOURCE 6) WIRING: ALL WIRING INSTALLED SHALL BE 600 VOLT CLASS, STRANDED <br /> MP 2 XF POWER CABLE FOR SPECT PORTION OF SYMBIA. SEE POWER SCHEDULE PHASE AND NEUTRAL WIRES TO BE THE SAME SIZE, GROUND PER NEC. TYPE THHN/THWN-2, SINGLE CONDUCTOR ANNEALED COPPER FOR A <br /> MAXIMUM OPERATING TEMPERATURE OF 90' C 194' F), SIZ'�D AS INDICATED, <br /> PROVIDE 2�12,1#12G. DETAIL 2, THIS SNEET INSTALLED IN METAL RACEWAYS. THE CONTRACTOR SHALL LEAVE A MINIMUM <br /> XF 3 C POWER CABLE FOR SPECT PORTION OF SYM�IA. SEE POWER SCHEDULE UNLESS OTHERWISE NOTED, ALL BREAKERS WILL BE 80% RATED 10 FEET OF WIRE TAILS AT ALL OUTLET POIN7S WITH WIRE IDENTIFICATION <br /> f'ROVIDE 2#10,1�10G. DEfAIL 2, THIS SHEET TAGGED AT BOTH ENDS FOR FINAL CONNECTION 8Y THE ELECTRICAL <br /> 5kVA, 480V PRIMARY, �40V SECONDARY SINGLE-PHASE CONTRACTOR. <br /> C 4 SPS POWER CABL� FOR SPECT PORTION OF SYMBIA. SEE POWER SCHEDULE XF 1 STEP-DOWN TRANSFORMER WITH SEGONDARY BREAKER 7) 5HORT CIRCUIT REQUIREMENTS: ALL CIRCUIT BREAKERS SUPPLIED FOR <br /> PROVIDE 2#10,1�10G. DETAIL 2, THIS SHEEf "C" PROTECTION FOR SPECT GANTRY "B". THE SIEMENS EQUIPMENT REQUIREMENTS SHALL BE RATED HIGHER THAN THE <br /> SPS 5 B POWER CA�LE FOR SPECT PORTION OF SYM�IA. SEE POWER SCHEDULE SHORT CIRCUIT AVAILABLE AT THE TERMINALS OF THE ELECTRICAL EQUIPMENT <br /> PROVIDE 2#10,1�10G. DEfAIL 2, THIS SHEE7. 1 AS DETERMINED �Y THE ENGINEER OF RECORD, BUT NOT LESS THAN <br /> MAXIMUM LENGTH 70'-0" EPO VARIES NOTE 1 - EPO CIRCUIT #1 35,OOOA RMS SYMMETRICAL AT 480V, 3-PHASE, 60 HERTZ. THE CONTRACTOR <br /> � �h1ALL O�TA1N T�9E CORREC� �HORT CIRCUIT CURR�NT RATING OF ALL THE <br /> MP 6,A LCB POWER CABLE FOR CT PORTION OF SYMBIA. SEE POWER SCHEDULE MAIN CIRCUIT BREAKER EMERGENCY POWER OFF �UTTON � NEW EQUIF'MENT FOR INSTALLATION FROM THE �NGINEER OF REC�RD. <br /> PROVIDE 4#4, 1#4G DETAIL 2, THIS SHEET WITH PROTECTIVE COVER THAT PREVENTS ACCIDENTAL <br /> LCB 7 B POWER CA�LE FOR C7 PORTION OF SYM�IA. SEE POWER SCHEDULE ACTIVATION. THE EPO MUST BE OF FAIL-SAFE DESIGN. 6 <br /> ' 5 �s Revision BY Appd. YY.MM.DD <br /> , .� � � � <br /> x <br /> ROVIDE 4 4, 1 4G M XAMUM� LENGTHH70 -0 EPO MU�ST BE RESET�B FOR�CM,41N BRHEAKER CAN NISM. t �� ; � � <br /> MP 8 EPO PROVIDE 2�12, 1�12G SEE POVIIER SCHEDULE RESUME OPERATION. CONTACTS AND WIRING <br /> �� y� � <br /> CONFIGURATION TO BE DESIGNED BY ELECTRICAL ' � <br /> DETAIL 2, THIS SHEE�i' j � � <br /> ENGINEER OF RECORD. A <br /> EPO 9 EPO PROVIDE 2#12, 1#12G SEE POWER SCHEDULE � � 2 <br /> DErAIL 2, THIS SHEET �xK ., �,�� M,�,P �,�t,� . �,.�� �_..������,�.�._..�. � <br /> .��,,��, �..� �,� �.� ��� � , : , ...�,.�..,.,,, _...,�..:.., �..u.. v,�... C MDJ 18.12.13 <br /> NO"fE 2 -- EPO CIRCUIT 2 §� � �� � � � � � � A <br /> EPO 10 SPS PROVIDE 2#12, 1#12G SEE POWER SCHEDULE # : �,�� � MP c � " �.m..�� '� .�� � � �`� � ��-NWbi��� � IssuedS NBY Appd. YY.MM.DD <br /> TRUCTION DOCUMENTS <br /> �� �.��'w�`^' 4� <br /> DETAIL 2 THIS SHEET � &�� �p � �8J1F�t -� k ' � � . <br /> � EPO CONTACTS TO BE NORMALLY OPEN, WIRED IN ��Y��,��� � � � PS '���� � � �� , °� <br /> B 13 WARNING PROVIDE 2#12, 1#12G SEE AUXILIARY WIRING � � �.� - � ��� � �i';��; HD1 CB � u W�"�� <br /> XF �.,�.��.=,�m W��M�r.v.���._�,,�w �.._,. F <br /> PARALLEL CONNECTED TO UPS FOR SPECT. �" � ��:. <br /> ud.,� <br /> LIGHT DE7AIL 3, THIS SHEEf � � �� �< � '"�� ; `�'� � Nc MDJ . .13 <br /> � � � � °� � � � ��u � <br /> � . <br /> A NCA 18 12 <br /> �. ��,� � ��`� �z r�.� ;,.� �,., � � � <br /> W A R N I N G 1 4 W A R N I N G P R O V I D E 2#1 2, 1#1 2 G S E E A U X I L I A R Y W I R I N G R � � ��`;r ,�'' y�, ,, �, � ��''���x �" �" � � � D w n. C h k d. D s g n. Y Y.M M.D D <br /> LIGHT LIGHT DET'AIL 3, THIS SHEET 2 POUVER SCHEDULE � � -a `�'� � °� "���' �� ������� �° ��� ' <br /> �' � Permit-Seal <br /> � � E3.00 SCALE:NONE � � :�� � �'���� ' ���`� J 5�`�:� 4 �,� �=������ �� �� � � <br /> : �* �� <br /> ��A <br /> _ ���i � � �"� ��v y"�`"."�};.� �°Y R'' �9�;./ �e� `�. �„lrv �� � <br /> 'x � `' <br /> Q � � �' �� ��� ' '`,� �� �;� ��'� �� �� _.. ,....�...u, �. �._e. ���lo� WAS���� <br /> �� m w �. <br /> z � � �' � ��; � �g� �" ���"°� �'''�,. � n�.r_� ,�,� a..,v�...� � ��,�_e�.b.,�., � � � ��' 1'�''G� f , <br /> m � � �:��, ,�'���"`:� �� `����� °, �, � �� � A F,Q' � <br /> �°�, � ���,.� ,�� ° �� . °`,� �. ""'"� HD2 � ��' � �' <br /> � . � 4'k`�T. �E�'r`� 3' �Y�y �^z, �A� � '�.£"S�� +�iawR�^�2� 1 O � � <br /> � � R � U N D I N � N 0 T E � � � 5:� � � ����v`����.��} � � :: � ��� ���g ��� � � <br /> Y�3 A wr �`�* V i ''� a ���� ti � �{ r��� �.l''. � . <br /> d- � � � .��` ,��" ��f��A` _��§;�����' �� � �� ���� ��°� �� � �' � 38180 <br /> ;- � � ``��`' :;�' �� ,`�' � ���'���� � � � � ,�g �,� � � �' e��, � .�c��' . <br /> � � '�, a� � � ' �<�" .��� � � 3 ;� �.�� w � G <br /> r y �+ �a E � � 3� : ? O <br /> 0o g �,� �� `�� ��'� �� �y r� 4 � � �� �`'�� : IRS � �,S I ST �1�" <br /> o EQUIPMENT GROUND CONDUCTOR TO COMPLY WITH THE FOLLOWING: i5 r,KpJ�� , �£��� � � ��r F'° � � : P �w..� SIONAL �� <br /> z✓ v '� �7F >�� �� �� � � � �.,, <br /> � 13 � � , �� � �� � ICS � <br /> � ��'� � �'�'�� �' � � � � '� t � <br /> •-�-- � °�2. �� ��'� \ h�°"� � � � � , ,� $ ��>�,'�,�� <br /> � 1 ) SIZED EQUIVALENT TO THE PHASE CONDUCTORS (FULL SIZED GROUND). � � �� ��� �. `��,�.�, � � � � � Client/Project <br /> o 'n'�_�.- "�� ��, � � , � � � : $ �� <br /> 0 2) DERIVE� FROM THE ELECTRICAL SERVICE, TRANSFORMER OR MAIN DISTRI�UTION PANEL FEEDING THE SIEMENS EQUIPMENT. ,� � .c� ���� � �� '���� PROVIDEN�� R�GI.ONAL MEDICA�. <br /> � � .a <br /> � 3) RUN IN THE SAME CONDUIT, TROUGH OR RACEWAY AS THE PHASE CONDUCTORS. �� ��� �`M ���'�� � ' �.��� Po ��a <br /> � �' ��� � `���5 � � � CE�JTER EVERETT - COLBY CAMPUS <br /> / __ "„�' r��'�� � � � � {° <br /> �,_ <br /> � 4 CONTINUOUS, WITH NO �REAKS OR USE OF CONDUIT, CHASSIS OR EARTH AS THE SOLE GROUNDING PATH. ��l, � � � ; � <br /> m �n <br /> Q 5) BONDED TO CHASSIS AND/OR CONDUIT IN ACCORDANCE WITH THE NEC REQUIREMENTS. �e., ��� � "�`��� �..�v �n�9W� � <br /> � 6) MINIMIZE CONNECTIONS OR TERMINALS TO ENSURE CONTINUITY OVER THE LIFE OF THE INSTALLATION. `� � � NUC ME� #3 REPLACEMENT <br /> � � a2 � ��� � �.. <br /> � 7) AS A NORM, THERE SHOULD NOT BE ANY CURRENT PRESENCE ON THE GROUND CONDUCTOR, BUT IT IS ACCEPTABLE T(J HAVE ' � � <br /> � <500mA DURING OPERATION OF THE IMAGING EQUIPMENT. �3�� `�� �� � P0 ��`�� �� °� '$�.�� ����.� � � EVERETT, WA � <br /> r� <br /> � 14 � -�,.. . � � � � u_ ���.� <br /> o � �� � .� wrl �;����� ���,������ � � <br /> � �, .�,��.,�.w.�.,�. �,.�W�.�� _�,5�.� �.�,���.�a.�. _�.���.3�. ��� .� ; Title <br /> ���.�y x�� �x �� ��',��v��.� � <br /> � ' ��".:�� �`;9 ,�, ,��..� ..� � � <br /> Q ' ` ' �� � ¢ NUCLEAR MEDICINE ROOM <br /> � <br /> � RACEWAY PLAN AND DETAILS <br /> 0 <br /> � <br /> � <br /> � <br /> � <br /> 0 <br /> Y �� NUC M�D 3 RACEWAY PLAN a� ° 2 4 $ 12 Projecf No. sca�e <br /> � <br /> � �3,pp SCALE:AS INDICATED a D 1 ineh plotted Feet 204820937 AS INDICATED <br /> � If ineasurement is other than g <br /> 0 1 inch then the plot is reduced. Drawin No. � <br /> � <br /> � <br /> E�.00 <br /> � <br /> � <br /> o����,5�=�_����, <br />