LAU I IUI�1 : II- I HI � �N �� I I � I�IU I �5U x4� I I I � /� K �UU �;�U F� KII�I I <br /> -- <br /> Y <br /> DOOR NOTES FINISH NOTES FLOOR PLAN NOTES DEMOLITION NOTES FIRE AUTHQRITY NOTES GENERAL NOTES � r-r-� � <br /> � � <br /> Z � W <br /> Q <br /> 1. VERIFY THAT ALL DOORS AND DOOR HARDWARE MEET THE REQUIREMENTS OF ALL 1. NO FINISH SUBSTITUTIONS MAY BE MADE UNLESS APPROVED BY ARCHITECT. 1. CONTRACTOR AND ARCHITECT TO REVIEW & APPROVE CHALK �INES OF PARTITION 1. DRAWINGS OF EXISTING CONDITIONS HAVE BEEN COMPILED FROM EXISTING DATA 1. FINAL ►NSPECTION BY FIRE DEPARTMENT IS REQUIRED - SCHEDULE 72 HOURS IN � � ' <br /> GOVERNING CODES & STANDARDS. NOTIFY THE ARCHITEGT IMMEDIATELY IN CASE LAYOUT PRIOR TO COMMENCEMENT OF PARTITION CONSTRUCTION. SUPPLIED BY THE OWNER TO THE ARCHITECT. THE ARCHITECT MAKES NO ADVANCE. L FOR METAL STUD S1ZES AND SPACING SEE LIMITING WALL HEIGHT TABLE L/240 z O � <br /> OF DISCREPANCY. 2. CONTRACTOR MUST NOTIFY THE ARCHITECT OF ANY DISCREPANCY IN PLANS. WARRANTY, EITHER EXPRESS OR IMPLIED, FOR THE ACCURACY OF THE 2. ALL WALL STUDS TO BE 3-5/8", U.O.N.. � � �� <br /> FINISH ITEMS CLEARLY SHOWN IN PLANS, BUT OMITTED FROM SCHEDULES OR 2. CONTRACTOR TO VERIFY DIMENSIONS FOR ALL PLUMBING PARTITION. COMP�ETENESS OF THE EXISTING INFORMATION RECORDED. THE CONTRACTOR 2. THE PROJECT ADDRESS SHALL BE PROVIDED FOR ALL NEW AND EXISTING Z i <br /> 2. FIELD MEASURE, AS REQUIRED, ALL DOORS PRIOR TO FABRICATION. LEGENDS MUST STILL BE PROVIDED AND INSTALLED BY CONTRACTOR. SNALL FIELD VERIFY ALL EXISTING CONDITIONS AND NOTIFY THE ARCHITECT BUILDINGS IN A POSITION AS TO BE PLAINLY VISIBLE AND L.EGIBLE FROM THE w � <br /> CONTRACTOR TO VERIFY OMITTED FINISHED WITH ARCHITECT PRIOR TO ORDERING 3. EXTEND ALL STUDS AND WALL MATERIALS TO CONSTRUCTION ABOVE, U.O.N. IMMEDIATELY OF ANY DISCREPANCIES OR CONFLICTS THAT MIGHT ARISE IN THE STREET OR ROAD FRONTING THE PROPERTY PER LOCAL FIRE DEPARTMENT 3. SEE KEYNOTE INFORMATION FOR ANY REQUIRED INSULATION. � � � <br /> 3. PROVIDE A SIGN ON OR NEAR TNE MAIN EXIT DOOR READING: PRODUCTS. COURSE OF THE DEMOLITION WORK. STANDARDS. � <br /> 4. CONTRACTOR SHALL PROVIDE RECORD DOCUMENTS AND PROVIDE SAID <br /> "THIS DOOR TO REMAIN UNLOCKED WHEN BUILDING IS OCCUPIED". 4. ALL CONDUIT PIPWG IN ELECTRICAL ROOM TO BE CONCEALED WITHIN TNE WALL W O <br /> 3. INSTALL MATERIALS ACCORDING TO MANUFACTURER'S SUGGESTED INSTALLATION CONSTRUCTION. 2. VERIFY LOCATIONS OF EXISTING MECHANICAL, PLUMBING AND ELECTRICAL 3. AN UNOBSTRUCTED ALL-WEATHER FIRE APPARATUS ACCESS ROAD SHALL BE IN DOCUMENTATION TO TENANT CONSTRUCTION COORDINATOR OR ARCHITECT UPON = V <br /> UTILITIES. LOCATE AND PROTECT UTILITIES TO REMAIN. DISCONNECT REMOVE PLACE PRIOR TO DELIVERY OF COMBUSTIBLE BUILDING MATERIALS TO THE S{TE. COMPLETION. � � <br /> 4. VERIFY THAT EXISTING DOORS COMPLY WITH ACCESSIBILITY REQUIREMENTS. AND PREPARATION/MAINTENANCE SPECIFICATIONS OR BETTER, UNLESS OTHERWISE � o �p <br /> APPROVED OR NOTED. 5. DOOR OPENINGS IN PARTITIONS NOT DIMENSIONED ARE TO BE LOCATED WITHIN BACK TO NEAREST JUNCTION BOX OR PANEL, AS REQUIRED, AND CAP <br /> 5. RATED DOORS SHALL COMPLY WITH REQUIREMENTS OF ALL GOVERNING CODES & 0'-4" OF ADJACENT PERPENDICULAR PARTITION. DESIGNATED UTILITIES WITHIN THE DEMOLITION AREA. REFER TO THE 4. FIRE PREVENTION WATER SERVICE SHALL BE IN SERVICE PRIOR TO DELIVERY OF 5. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS (IF ANY) AND NOTIFY o � <br /> STANDARDS AND SHALL BEAR A LABEL FROM A RECOGNIZED AGENCY SHOWWG 4. APPLICATION OF CONTROLLED INTERIOR FINISHES SHALL BE IN CONFORMANCE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITlONAL INFO. COMBUSTIBLE BUILDING MATERIALS TO THE SITE. ARCHITECT OF ANY DISCREPANCIES. � � , <br /> THE SPECIFIC RATINGS. WITH STATE & LOCAL CODES. 6. CONTRACTOR SHALL USE 3-5/8" METAL STUDS MINIMUM AT ALL PLUMBING � � <br /> WALLS. CONTRACTOR TO VERIFY ACTUAL DEPTH REQUIRED, ANY DISCREPANCIES 3. EXISTING ELECTRICAL AND TELEPHONE OUTLETS LOCATED ON DEMOLISHED WALLS 5. ACCESS GATES SHALL BE APPROVED PRIOR TO INSTALLATION AND SHALL BE IN 6. CONTRACTOR TO INCLUDE ALL FLOOR PREPARATIONS IN BASE BID. � � p , <br /> 6. ALL HARDWARE TO BE LEVER-TYPE PER GOVERNING CODES & ACCESSIBILITY 5. DECORATIVE MATERIALS SHALL BE MAINTAINED IN A FLAME-RETARDANT SHALL BE REPORTED TO THE ARCHITECT. ARE TO BE REMOVED INC�UDING CONDUIT AND WIRING BACK TO JUNCTION BOX. COMPLIANCE WITH LOCAL FIRE AUTHORITY. o � .� <br /> STANDARDS. CONDITION. LOCATIONS ARE TO BE PATCHED AND REPAIRED TO BE FLUSH WITH ADJACENT 7. ALL DRYWALL CORNERS AND COLUMN EDGES TO BE FINISHED WITH CORNER "L" � � <br /> WALL SURFACE. 6. FIRE SPRINKLER SYSTEM(S) SHALL MEET STATE & LOCAL FIRE CODES AND BE BEAD. ALL EXPOSED EDGES TO BE FINISHED WITH METAL TRIM. � '� <br /> 7. USE WATER RESISTANT GYPSUM BOARD/FIBER BOARD AT ALL AREAS SUBJECT TO c�S <br /> 7. DOOR HANDLES, PULLS OR KNOBS SHALL BE INSTALLED AT 40" ABOVE FINISH 6. SUBMIT THE FOLLOWING SAMPLES FOR ARCHITECT'S APPROVAL: MOISTURE OR WHERE TILE IS USED. PROVIDED TO PROTECT ENTIRE BUILDING INCLUDING PROJECTIONS OVER 4'-0". g, INTERIOR GYPSUM BOARD WALL SHALL CONFORM TO ICC REPORT ESR-1338. � J <br /> FLOOR. ALL OTHER OPERABLE PARTS OF DOOR HARDWARE (SUCH AS DEADBOLTS, A. THREE (3) 12" X 12" SAMPLES FOR ALL PAINT AND STAIN BRUSHOUTS, 4. WHERE PLUMBING FIXTURES ARE BEING REMOVED OR WHERE EXPOSED PLUMBING Q <br /> » >� PIPES OCCUR, CAP LINES BEHIND FINISHED SURFACES. PATCH AND REPAIR AS � <br /> KEYHOLES... ETC.) ARE TO BE CENTERED BETWEEN 34 AND 44 ABOVE FINISH VINYL AND FABRIC FINISHES AND COLORS APPLIED TO A SUBSTRATE WHICH 8. ALL PLUMBING WORK SHALL BE IN ACCORDANCE WITH LOCAL AND NATIQNAL 7. FIRE SPRINKLER SYSTEM(S) AND ALL CONTROL VALVES, INCLUDING EXTERIOR � <br /> FLOOR. IF EXISTING BUILDING STANDARD EXISTS, MATCH BUILDING STANDARD AND IS REPRESENTATIVE OF THE SURFACE TO BE FINISHED. SUBMIT PAINT CODES. REQUIRED. SHALL BE SUPERVISED BY A U.L. LISTED CENTRAL ALARM STATION OR PER 9• ARCHITECTURAL DIMENSIONS AND LOCATIONS TAKE PRECEDENCE. SEE o <br /> ELECTRICAL DRAWINGS FOR COORDINATION. IF INCONSISTENCIES OCCUR <br /> CONFIRM COMPLIANCE WITH ACCESSIBILITY REQUIREMENTS. SAMPLES FROM THE PAINT LOT OR LOTS INTENDED FOR APPLICATION. STATE & LOCAL FIRE CODES. � <br /> , � 9. ALL HOT WATER LINES SHALL BE PROPERLY INSULATED. SEE PLUMBING 5. ALL EXISTING CONSTRUCTION WHERE INDICATED INCLUDING ELECTRICAL, CONTACT ARCHITECT FOR CLARIFICATION. <br /> 8. SPECIAL LOCKING DEVICES SHALL BE OF AN APPROVED TYPE. B. ONE (1) 24 X 24 MOCK-UP WITH SAMPLE SEAM (CENTERED) OF ALL DRAWINGS. TELEPHONE PLUMBING AND MECHANICAL DEVICES NOT OTHERWISE INDICATED ON g, ALL VALVES CONTROLLING THE WATER SUPPLY FOR AUTOMATIC SPRINKLER � � <br /> THESE CONSTRUCTION DRAWINGS SHALL BE REMOVED IN A CAREFUL MANNER SO SYSTEMS AND WATER-FLOW SWITCHES ON ALL SPRINKLER SYSTEMS SHALL BE 10 CONTRACTOR TO RELOCATE LIGHTWG, SWITCHING AND ELECTRICAL N <br /> FABRIC AND VINYL FINISHES AND COLOR. w <br /> AS NQT TO DAMAGE ADJOINING CONSTRUCTION. CIRCUITING AS REQUIRED. a, v+ <br /> 9. PROVIDE WEATHER SEALS ON ALL EXTERIOR DOORS PER ANSI STANDARDS. 10. ALL PLUMBWG CLEAN-OUTS SHALL BE WSTALLED WHERE READILY ACCESSIBLE. ELECTRICALLY MONITORED WHERE THE NUMBER OF SPRINKLERS IS (100) OR � � o <br /> CONTRACTQR SHALL COORDINATE ALL CLEAN-OUT LOCATIONS WITH EQUIPMENT, � <br /> G THREE (3) 12° X 12" SAMPLES OF ALL FLOOR COVERING. MORE. o � � <br /> 10. CONTRACTOR IS RESPONSIBLE TO COORDINATE & VERIFY ALL DOOR FRAME AND CABWETS. SUBMIT A PLAN OF ALL PROPOSED LOCATIONS TO ARCHITECT 6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE ALL EXISTING 11. ALL TELEPHONE/ELECTRICAL OUTLETS IN EXISTING WALLS TO REMAIN, F- w , <br /> UTILITIES WHETHER SHOWN HEREON OR NOT AND TO PROTECT THEM FROM U.O.N. PROVIDE NEW ELECTRICAL, DATA AND TELEPHONE OUTLETS AS �- � <br /> D, SUBMIT ACTUAL CUTTINGS OF EACH PRODUCT FOR COLOR QUA�ITY CONTROL. FOR APPROVAL PRIOR TO INSTALLATION. 9. ELECTRICAL SUBCONTRACTORS TO INSTALL WIRING FOR FIRE SPRINKLER, ALARM <br /> THROAT THICKNESS' FOR EACH LOCATION. = Z ° <br /> � DAMAGE. THE CONTRACTOR SHALL BEAR ALL EXPENSE OF REPAIR OR INDICATED ON PLAN. c� v on <br /> REPLACEMENT OF UTILITIES OR OTHER PROPERTY DAMAGED BY OPERATIONS IN BELL AND TELEPHONE WARNING AS REQUIRED BY FIRE DEPARTMENT. � � � � <br /> 11. ALL DOOR FRAMES TO BE FACTORY FINISHED, U.O.N.. 1 1. A L L M I L L W O R K S H A L L C O N F O R M T O S T A T E & L O C A L W O O D W O R K I N G S T A N D A R D S. o � <br /> 7. WHERE MATERIALS ARE NOT RETURNABLE, SUBMIT SAMPLES TO ARCHITECT CONJUNCTION WITH THE EXECUTION OF HIS WORK. 12. NEW DATA CABLING TO BE SUPPLIED AND INSTALLED BY TENANT PLENUM � '� � � o � <br /> 10. INSTALLATION OF FIRE ALARM SYSTEMS SHALL BE IN ACCORDANCE WITH STATE & � <br /> BEFORE PLACING FULL ORDERS. RATED REQUIRED . m �' °J ,� 3 � � <br /> 12. FIELD MEASURE AS REQUIRED FOR ALL MILLWORK CONDITIONS PRIOR TO LOCAL FIRE CODES. ) <br /> 12. ALL WALL DOOR STOPS TO HAVE 2x6 BACKING IN THE WALL BEHIND. 7. ALL EXISTING BUILDING UTILITIES SHALL REMAIN IN OPERATION DURING m <br /> 8. SUBMIT SEAMING PLAN FOR ALL FLOOR FINISHES TO ARCHITECT FOR APPROVAL FABRiCATION. � °A � � �� N a� � �+ <br /> CONSTRUCTION. PROVIDE REROUTING OF UTILITIES SERVING ADJACENT AREAS 13. VERIFY POWER REQUIREMENTS FOR USER PROVIDE EQUIPMENT PRIOR TO � °��' ' •° :� v � 5� �° � <br /> 13. MAXIMUM UNDERCUT OF ALL DOORS NOT IN A RATED CORRIDOR SHALL NOT PRIOR TO ORDER. 11. COMPLETE PLANS AND SPECIFICATIONS FOR ALL FIXED FIRE PROTECTION Q � �, � ^, � � �i �; <br /> 13. CONTRACTOR TO PROVtDE SHOP DRAWINGS FOR ARCHITECT AND TENANT THAT ARE TO MAINTAIN UNINTERRUPTED SERVICE. ANY TEMPORARY SUSPENSION EQUIPMENT INCLUDING AUTOMATIC SPRINKLERS AND OTHER FIRE-PROTECTION INSTALLATION OF RELATED POWER & SIGNAL CONNECTIONS. _ � c� ,;3 � � ,� � `� c� <br /> EXCEED 1/2" ABOVE FINISH FLOOR SURFACE. OF SERVICE SHALL BE COORDINATED AND APPROVED BY THE FACILITY MANAGER, v� � p, ,� � •v � � �, w' <br /> 9. NOTIFY ARCHITECT IMMEDIATELY OF ITEMS WITH LONG LEAD TIMES. APPROVAL PRIOR TO MANUFACTURE OF ANY CABINET WORK, MILLWORK AND ANY SYSTEMS, SHALL BE SUBMITTED BY INSTALLING CQNTRACTOR. SUCH PLANS <br /> NOT LESS THAN 24-HOURS IN ADVANCE. 14. SEE KEYNOTE INFORMATION FOR ANY REQUIRED INSULATION. r <br /> 14, CONTRACTOR SHALL REFINISH ANY BLEMISHED DOOR OR REPLACE SAID DOOR 1F OTHER SPECIAL ITEMS REQUIRING CUSTOM SHOP FABRICATED WORK. SHALL BE APPROVED BY LOCAL FIRE AUTHORITY PRIOR TO INSTALLATION. z <br /> NOT ABLE TO REFINISH TO "AS NEW" CONDIT{ON. 10. ALL PAINT FINISH OF METAL PARTS OF DOQRS, HANDRAILS, PERIMETER 14. CONTRACTOR TO VERIFY FINAL LOCATION FOR CANTILEVERED COUNTERS AND $• THE CONTRACTOR WILL VERIFY AND CONFORM TO ALL REQUIREMENTS OF ALL 12. LOCATIONS AND CLASSIFICATIONS OF FIRE EXTINGUISHERS SHALL BE IN 15. SEE ENLARGED RESTROOM ELEVATIONS FOR WALL FINISHES. °- <br /> ENCLOSURES, ETC., SHALL BE SEMI-GLOSS, U.O.N. IN-WALL SUPPORT BRACKETS PRIOR TO GYPSUM BOARD FINISHING OF WALLS. UTILITY COMPANIES UNLESS OTHERWISE NOTED W THE PLANS AND ACCORDANCE WITH STATE & LOCAL FIRE CODES AND PLACEMENT IS SUBJECT TO � <br /> 15. ALL DOORS TO BE OPERABLE FROM THE INSIDE WITHOUT A KEY OR ANY SPECIAL ALL FINAL lNSTALLATION HEIGHTS FOR IN-WALL SUPPORT BRACKETS MUST MEET SPECIFICATIONS. THE APPROVAL OF THE FIRE INSPECTOR. VERIFY QUANTITY & EXACT LOCATION 16. SEE MILLWORK ELEVATIONS FOR COUNTERTOP AND CABINETRY FINISHES. � <br /> KNOWLEDGE OR EFFORT. 11, WHERE PAINT COLORS CHANGE, CORNERS ARE TO BE CUT-1N FREE OF ALL ACCESSIBILITY CODES REQUIREMENTS WITH COUNTERTOP MATERIAL THICKNESS FROM FIRE DEPARTMENT PRIOR TO ORDERING. � p �Z <br /> OVERLAPPING. 9. THE DEMOLITION PLAN KEYNOTES ARE DIAGRAMMATIC AND GENERAL IN NATURE. >- f- �p <br /> INCLUDED. 17. PROVIDE APPROPRIATE SEALER FOR ALL NEW FINISHES PER Z W <br /> 16. ALL DOORS WITH ELECTRONIC SECURITY DOOR LOCKS MUST BE OPENABLE FOR THE INTENT IS TO ILLUSTRATE THE COMPLETE DEMOLITION OF THE SPACES a � � ��" <br /> EXITING PURPOSES UNDER ALL CONDITIONS. INCL.UDING A POWER OUTAGE. 12. PRIOR T0 THE INSTALLATION OF WALL COVERINGS, SURFACES SHALL BE INDICATED UNLESS NOTED OTHERWISE. FIELD VERIFICATION OF EXISTING 13. AT LEAST ONE (1) FIRE EXTINGUISHER WITH A MINIMUM RATING OF: MANUFACTURER'S RECOMMENDATION. W � �„„rpz <br /> 15. PROVIDE AND WSTALL ALL NECESSARY WALL BACKING, STIFFENERS, BRACWG, w �- _ � <br /> PROPERLY PREPARED WITH SEALER PER MANUFACTURER'S RECOMMENDATIONS. CONDITIONS AND SPECIFIC QUANTITIES IS THE RESPONSIBILITY OF THE 2-A-10B:C (FOR OFFICE), OR 10-A-80B:C (FOR WAREHOUSE), SHALL BE F-- � _ .� <br /> BACK-UP PLATES AND/ OR SUPPORTING BRACKETS AS REQUIRED FOR THE CONTRACTOR. PROVIDED WITHIN 75'-0" MAXIMUM TRAVEL DISTANCE FOR EACH 3,000 SQUARE 18• PROTECT FINISHES FROM MARS, MARKS, INDENTATIONS, AND OTHER v� � � Q Q � <br /> 17. IF BUILDING STANDARDS ARE INCONSfSTENT FOR DOORS, RELITES, HARDWARE, o <br /> INSTALLATION OF WALL-MOUNTED OR SUSPENDED EQUIPMENT OR BUILT-IN fTEMS. DAMAGE FROM CONSTRUCTION OPERATIONS AND PLACEMENT OF m W �� ' <br /> DOOR AND RELITE FRAMES OR OTHER STANDARD DETAILS, THEN CONTRACTOR 13. CONTRACTOR TO VERIFY CONDITION AND LEVEL OF FLOOR SO AS TQ RECEIVE FEET OR PORTION THEREOF ON EACH FLOOR. <L J r� <br /> MUST VERIFY WITH DESIGNER AND OWNER PRIOR TO CONSTRUCTION. VERIFY REQUIREMENTS WITH MANUFACTURERS PRIOR TO INSTALLAT(ON. SUPPLY EQUIPMENT AND FIXTURES DURING REMAINDER OF CONSTRUCTION PERIOD. � � �0 0 <br /> NEW FINISHES WITHOUT BOWING AT FLOOR OR WAtL BASE. CONTRACTOR IS , 10. REMOVAL AND DISPOSAL OF DEMOLITION DEBRIS IS THE RESPONSIBILITY OF THE � <br /> CATALOG CUT SHEETS FOR ARCHITECT S APPROVAL. 14. STORAGE, DISPENSING OR USE OF ANY FLAMMABLE AND COMBUSTIBLE �IQUIDS, USE PROTECTION METHODS RECOMMENDED IN WRITING BY MANUFACTURER. w a w x <br /> RESPONSIBLE FOR ALL FLOOR PREPARATION. CONTRACTOR. VERIFY THE HAULING ROUTE THROUGH THE BUILDING, THE = z� W <br /> DEMOLITION STAGING AREA, AND THE LOCATION OF THE DUMPSTERS WITH THE FLAMMABLE AND COMPRESSED GASES, AND OTHER HAZARDOUS MATERIALS SHALL '- � >a <br /> 14. ALL CARPETING SHALL BE INSTALLED WITH GLUE DOWN METHOD, U.O.N. 16. PROVIDE AND INSTALL ALL NECESSARY ELECTRICAL CONNECTIONS AND PLUMBING OWNER PRIOR TO THE START OF DEMOLITION. DISPOSAL OF RUBBISH SHALL BE COMPLY WITH STATE & LOCAL FIRE CODES. THE STORAGE AND USE OF 19. INSTALLATION LEVELS QF GYPSUM BOARD FINISHING AS FOLLOWS: zo z � �� <br /> SUPPLY, FITTINGS & CONNECTORS TO COMPLETE INSTALLATION OF APPLIANCES & HAZARDOUS MATERIALS SHALL BE APPROVED BY THE FIRE AUTHORITY PRIOR TO 1.1. LEVEL 1 FINISH: WHEN ABOVE FINISHED CEILINGS AND CONCEALED o <br /> DONE IN A LEGAL MANNER. o � <br /> 15. WHERE FLOOR-MOUNTED OUTLETS ARE REQUIRED ON CARPETED AREA, CUT EQUIPMENT INDICATED ON PLAN. VERIFY REQUIREMENTS WITH MANUFACTURERS ANY MATERIALS BEING STORED OR USED ON SITE A SEPARATE PLAN SUBMITTAL FROM VIEW. <br /> PRIOR TO INSTALLATION. SUPPLY CATALOG CUT SHEETS FOR ARCHITECT'S IS REQUIRED PRIOR TO THE STORAGE AND USE OF HAZARDOUS MATERIALS. 1.2. LEVEL 2 FINISH: AS A SUBSTRATE FOR TILE. � ,- <br /> CARPET IN AN "X" OVER FLOOR HOLE AND INSTALL CARPET OVER TOP. DO NOT APPROVAL. 11. THE OWNER RESERVES THE RIGHT TO SALVAGE ANY DEMOLISHED ITEM. VERIFY 1.3. LEVEL 3 FINISH: WHEN SCHEDULED TO RECEIVE A HEAVY OR MEDIUM w `" <br /> TRIM CARPET. ITEMS TO BE SALVAGED WITH THE OWNER PRIOR TO THE START OF DEMOLITION. > � ` <br /> TEXTURED FINISH. <br /> M I L L W O R K N O T E S REMo�E PROTECT CLEAN REPAIR FOR REUSE AND TURN OVER SUCH ITEMS AS 15. BUILDING(S) NOT APPROVED FOR HIGH-PILED STOCK (MATERIALS IN CLOSELY ,,, � <br /> 16. ALL V.C.T. TO BE INSTALLED WITH FULL TILE FROM VINYL THRESHOLD STRIP AND 17. EXACT LOCATION OF FIRE EXTINGUISHER CABINETS TO BE CONFIRMED WITH DIRECTED BY THE}OWNER.� PACKED PILES OR ON PALLETS, OR IN RACKS WHERE THE TOP OF STORAGE 1.4. LEVEL 4 FINISH: fN OFFICES AND OTHER AREAS THAT RECEIVE LOWER m <br /> ARCHITECT BEFORE INSTALLATION. PROVIDE ADDITIONAL FIRE EXTINGUISHERS & PUBLIC TRAFFIC AND VISIBILITY. � <br /> FUL� TILE FROM WALL ADJACENT TO DOOR SWING U.O.N. EXCEEDS 12'-0" IN HEIGHT AND 6'-0" FOR GROUP "A" PLASTICS AND CERTAIN � <br /> ' CABINETS AS REQUIRED BY THE FIRE DEPARTMENT FIELD INSPECTORS. ' 1.5. LEVEL 5 FINISH: FOR ALL WALLS AND CEILINGS TO RECEIVE A a <br /> 12. IN ORDER TO INSTALL SOME OF THE NEW WORK (INCLUDING, BUT NOT LIMITED OTHER HIGH-HAZARD COMMODITIES). HIGH-PILED STOCK SHALL BE APPROVED PAINTED FIN►SH, LIGHTLY TEXTURED FINISH. v=, <br /> 1. CONTRACTOR MUST NOTIFY ARCHITECT DESIGNER OF ANY DISCREPANCY IN 17. PROVIDE AND INSTALL SPECIFIED BASE FOR ALL AREAS TO RECEIVE FLOORING. TO MECHANICAL, PLUMBING OR ELECTRICAL) IT WILL BE NECESSARY FOR THE BY THE FIRE AUTHORITY PRIOR TO MATERIALS BEING STORED ON 51TE. A <br /> � 18. CONTRACTOR TO VERIFY LOCATION OF ALL THERMOSTATS WITH ARCHITECT PRIOR o <br /> PLANS. FINISH ITEMS CLEARLY SHOWN IN PLANS, BUT OMITTED FROM SCHEDULES TO INSTALLATION. CONTRACTOR AND HIS SUBCONTRACTORS TO REMOVE AND REPLACE (OR SEPARATE PLAN SUBMITTAL IS REQUIRED FOR HIGH-PILED STORAGE IN 20. ROOMS TO RECEIVE PAINT (P-1), RUBBER BASE (RB-1} AND CARPET Q <br /> 18. CONTRACTOR SHALL PROVIDE PRE-FORMED RUBBER BASE CORNERS. DO NOT ACCORDANCE WITH STATE & LOCA� FIRE CODES. <br /> OR LEGENDS MUST STILL BE PROVIDED AND INSTALLED BY CONTRACTOR. REFINISH EXISTING WALLS FLOORS, OR CEtLING IN THE AREAS OF THE BUILDING <br /> CUT OR BEND STRAIGHT BASE TO MAKE CORNERS. ' (C-1), U.O.N. cn <br /> CONTRACTOR TO VERIFY OMITTED FINISHES WITH ARCHITECT OR DESIGNER PRIOR 19. ALL EXITS SHALL HAVE EXIT SIGNS AND ALL BLIND CORRIDOR TURNS SHALL NOT SHOWN ON THESE PLANS. THE CONTRACTOR SHALL INCLUDE ALL RELATED o <br /> TO ORDERING PRODUCTS. HAVE DIRECTIONAL EXIT SIGNS. COSTS IN HIS BASE BID, WHETHER SHOWN ON THESE PLANS OR NOT. 16. A LETTER OF INTENDED USE MAY BE REQUIRED BY THE FIRE INSPECTOR. N <br /> 19. MILLWORK LOWER CABINETS ARE NOT TO RECEIVE WALL BASE UNLESS INDICATED 21. PREPARE WALLS TO RECEIVE (2) COATS EGGSHELL PAINT, U.O.N. z <br /> 2. SHOP DRAWINGS MUST BE PROVIDED FOR APPROVAL PRIOR TO FABRICATION TO ON FINISH PLANS. 13. PROTECT ADJACENT SPACES NOT SCHEDULED FOR DEMOLITION. PATCN AND 17. ALL REQUIRED FIRE DOORS SHALL BEAR A LABEL FROM A RECOGNIZED AGENCY � <br /> 20. PREPARE ALL FLOOR SURFACES AS REQUIRED TO RECEIVE FINISHES AS NOTED SHOWING THE SPECIFIC RATING. o <br /> THE ARCHITECT. CABINETMAKER SHALL USE ON SITE FIELD FRAMING DIMENSIONS ON FINISH PLAN ENLARGED FINISH PLANS & FINISH LEGEND. REPAIR DAMAGED FINISHES ITEMS AND FIXTURES TO REMAIN AND/OR REPLACE ` <br /> 20. FLOOR FINISHES TO CONTINUE UNDERNEATH "OPEN F�OOR" AREAS OF MILLWORK, ' ' o �,,.. <br /> FOR ALL SHOP DRAWINGS AND FABRICATIONS. ANY SUBSTITUTIONS TO THE IN KIND TO MATCH EXISTING FROM DAMAGE DURING THE PROGRESS OF THE w <br /> FOLLOWING SPECIFICATIONS MUST BE APPROVED BY THE ARCHITECT PRIOR TO INCLUDING SINK AREA AND AT ALL UNDER-COUNTER EQUIPMENT AREAS WHICH 18. EXIT SIGNS AND ILLUMINATION SHALL CONFORM TO ALL APPLICABLE BUILDING M � � <br /> 21. UNLESS OTHERWISE NOTED, ALL GYPSUM BOARD SURFACES, WALLS, AND CEILINGS WORK. PROVIDE TEMPORARY SAFETY BARRIERS REQUIRED BY CODE AND AS a <br /> FABRICATION. ARE OPEN TO THE FLOOR. �> >� INDICATED TO INSURE PUBLIC SAFETY AND TO ALLOW BUILDING OCCUPANCY. AND FIRE CODES. � �-�J <br /> SHALL BE TAPED, SANDED SMOOTH TO A LEVEL 4 FINISH, SO AS TO RECEIVE <br /> PAINT OR WALL COVERING MATERIAL. CONTRACTOR TO SUBMIT FOR APPROVAL BARRIER LOCATIONS AND METHOD OF � �n � <br /> 21. FLOORS SHALL BE SLOPED TO FLOOR DRAINS. COORDINATE WITH PLUMBING AND ' ' 19. EXIT DOORS SHALL BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF A KEY w <br /> 3. CABWET MAKER TO COORDINATE & VERIFY WITH CONTRACTOR FINAL LOCATION CONSTRUCTION TO THE ARCHITECT PRIOR TO INSTALLATION. > `�� <br /> FOR CANTILEVERED COUNTERS FOR IN-WALL SUPPORT BRACKETS, PRIOR TO STRUCTURAL DRAWINGS. IN RATED FLOOR CONDITIONS, CONFIRM REMAINING FLOOR OR ANY SPECIAL KNOWLEDGE OR EFFORT. G C I N ST R U CT I O N S � Q <br /> THICKNESS STILL CONFORMS TO MINIMUM RATING REQUIREMENT. 22. PROVIDE SOUND INSULATION AT PERIMETER WALLS OF RESTROOMS, LOBBY, � , W � <br /> GYPSUM BOARD FINISHING OF WALLS. ALL FINAL INSTALLATION HEIGHTS FOR STAIRS, AND ACROSS CEILING OF RESTROOMS TO CREATE AN ACOUSTIC 14. NO STRUCTURAL ELEMENTS ARE INCLUDED IN THIS SCOPE OF WORK. � <br /> IN-WALL SUPPORT BRACKETS MUST MEET ALL APPLICABLE ACCESSIBILITY CODES 20. PROVIDE OR MODIFY AS NEEDED SPRINKLER ALARM AND SMOKE DETECTION z Z �M � <br /> ENVELOPE U.O.N. w d- <br /> , <br /> C 0 U C LCIU C LORIDE TEST ON ALL STING OR N W SYSTEM PER APPLICABLE CODES INCLUDING IF NECESSARY FOR HORNS STROBE <br /> 22. CONTRA TOR T R N A M H EXI E <br /> AND STANDARDS WITH COUNTER TOP MATERIAL THICKNESS INCLUDED. 15. PROVIDE DUST BARRIERS AROUND OPENINGS, TO AND FROM THE CONSTRUCTION <br /> CONCRETE SLABS PRIOR TO INSTALLING ANY FLOORING AND COMPARE RESULTS AREA. PROVIDE ALL MEANS NECESSARY TO INHIBIT DUST FROM ENTERING LIGHTS, CONTROL PANEL CONNECTIONS, SMOKE DETECTORS, AUDIo v�suA� SUBMITTALS � W a O <br /> 23. PATCH AND FILL VARIOUS OPENINGS AT EXISTING GYPSUM BOARD PARTITIONS w <br /> WITH FLOORING MANUFACTURE'S RECOMMENDED MAXIMUM CONTENT FOR ALARMS. SUBMIT SHOP DRAWINGS TO THE FIRE MARSHAL FOR APPROVAL. � 1 N <br /> 4. MATERIAL COLORS NOT LISTED SHALL BE REQUESTED FROM ARCHITECT/INTERIOR AND SOFFITS FOLLOWING REMOVAL OR INSTALLATION OF ANY SURFACE MOUNTED OTHER PORTIONS OF THE FACILITY. SUBMIT BARRIER LOCATIONS TO THE 1. AT THE START OF JOB PROVIDE A SCHEDULE OF ALL ANTICIPATED SUBMITTALS � W � 00 <br /> DESIGNER ON SHOP DRAWING SUBMITTALS OR BY LETTER. WARRANTIES AND ADHESIVE PRODUCTS. OR RECESSED FURNISHINGS, RECEPTACLES, UTILITY PIPING, SHELF STANDARDS & ARCHITECT FOR APPROVAL, PRIOR TO INSTALLATION. AND DATES. FLAG SUBMITTALS WHICH ARE OR COULD BE CRITICAL PATH. FLAG Y � <br /> 23. PRIOR TO NEW FLOORING INSTALLATION REMOVE EXISTING FLOOR FINISHES. PATCH ALL OTHER SIMILAR ELEMENTS INDICATED TO BE REMOVED DURING THE SUBMITTALS THAT WILL BE REQUESTED TO BE EXPEDITED FASTER THAN THE Q � U � Q <br /> 5. ALL UPPERS TO BE LAMINATED TO MATCH BASE CABINETS. BOTH UPPERS & DEMOLITION PHASE OR INSTALLED DURING THE CONSTRUCTION PHASE: TAPE AND 16. PROVIDE ADEQUATE SHORING, BRACING, BARRICADES AND PROTECTIVE MEASURES STANDARD 7-10 DAYS. ~ <br /> LOWER CABINETS IN WET AREAS TO HAVE MATCHING PVC EDGE, ALL OTHERS TO AND REPAIR SUB-FLOOR AS REQUIRED. PREPARE FLOORS AND TRANSITIONS AS AS REQUIRED TO SAFELY EXECUTE THE WORK 1N THE CONSTRUCTION AREA AND J �. <br /> REQUIRED FOR SMOOTH AND LEVEL FINiSH PER APPLICABLE BUILDING CODES. SEAL ALL SEAMS WITH JQINT COMPOUND: APPLY NEW FINISH TO MATCH EXISTING Q � � <br /> HAVE PLASTIC LAMINATE EDGE BANDING U.O.N. FINISH AT ADJACENT GYPSUM BOARD SURFACES AND FEATHER NEW FINISH WITH THE AREAS ADJACENT TO THE CONSTRUCTION AREA. CEASE OPERATIONS AND 2. A SUBMITTAL LOG IS TO BE MAINTAINED BY THE GENERAL CONTRACTOR AND A = � <br /> EXISTING FINISH TO PROVIDE CONSISTENT & CONTINUOUS FINISH. NOTIFY THE ARCHITECT IMMEDIATELY IF THE STRUCTURE APPEARS TO BE CURRENT COPY IS TO BE INCLUDED WITH EACH SUBMISSION. `" � �-1- W ',.._ <br /> 6. ALL CABINETS AND DOORS SHALL BE CONSTRUCTED FROM 3/4" THICK MATERIAL, 24. ALL FLOORING TRANSITIONS AMONG ALL THE DIFFERING FLOORING MATERIAL ENDANGERED. DO NOT RESUME OPERATIONS UNTIL CORRECTIVE MEASURES HAVE C E I L I N G N OT E S z O � I- <br /> UNLESS APPROVED PRIOR TO EACH JOB. SPECIFICATION TYPES ARE TO BE A FLUSH TRANSITION. BEEN TAKEN. o <br /> 3. ALL SUBMITTALS MUST BE REVIEWED AND APPROVED WITH A STAMP AND z W W <br /> 7. ALL BASE CABINET ARE NOT TO RECEIVE WALL BASE UNLESS IND(CATED ON 25. FEATHER SUB-FLOOR UP FOR A) TILE FLOORING TO CARPET AND B) VINYL 17. CONTRACTOR SHALL MAINTAIN REQUIRED MEANS OF EGRESS AND ENSURE THAT W Z > � <br /> FINISH PLANS OR ELEVATIONS. FLOORING TO CARPET, FOR FLUSH INSTALLATION. EXIT ROUTES ARE SIGNED, LIGHTED AND PROTECTED iN ACCORDANCE WITH CODE SIGNATURE BY THE GENERAL CONTRACTOR PRIOR TO SUBMISSION. THE REVIEW � <br /> WILL INCLUDE BUT NOT BE LIMITED T0: � � � W <br /> REQUIREMENTS. RELOCATE EXISTING AND/OR PROVIDE SMOKE PROTECTORS AND 1. SEE ELECTRICAL ENGINEERING DRAWINGS FOR SPECIF►CATIONS OF NEW BUILDING 3.1. CONFIRMING THAT THE SUBMITTAL MEETS THE REQUIREMENTS OF THE z 5 <br /> 26. INSTALL METAL TRANSITION STRIPS WHERE TILE MEETS ALL OTHER FLOORING w W � <br /> 8. ALL INTERIORS OF CLOSED CABINETS TO BE WHITE MELAMINE/POLYESTER OR TYPES. PROVIDE LOW PROFILE TRANSITION STRIP WHERE ALL OTHER DIFFERENT LIFE SAFETY EQUIPMENT FOR ADEQUATE COVERAGE. STANDARD LIGHT FIXTURES, SWITCHES, EXIT SIGNS, ETC. CONTRACT DOCUMENTS. � ` W <br /> APPROVED EQUAL, UNLESS OTHERWISE SPECIFfED. FLOOR TYPES MEET VERIFY COLOR. 3.2. COORDINATION HAS TAKEN PLACE WITH ALL INTERCONNECTING TRADES � z <br /> 18. PROVIDE TEMPORARY NON-COMBUSTIBLE CONSTRUCTION BARRIERS WHERE 2. ALL REPLACEMENT FLUORESCENT LAMPS TO MATCH BUI�DING STANDARD - SAME 3.3. THE SUBMITTAL IS COMPLETE AND COMPREHENSIVE � � � <br /> � POWER & SI � NAL NOTES Q � <br /> 9. ALL OPEN CABINETS OR SHELVES TO HAVE PLASTIC LAMINATE TO MATCH REQUIRED BY CODE AND THE GOVERNING FIRE AUTHORITY. MINIMUM COLOR AND MANUFACTURER. oo � <br /> 27. CONTRACTOR TO HEAT/CHEMICAL SEAM VINYL FLOORING AS PER REQUIREMENTS: � <br /> EXTERIORS. 4. REQUESTS ON SUBMITTALS FOR DIMENSIONS WHICH CAN BE DISCERNABLE o M <br /> MANUFACTURER'S SPECIFICATfONS AND SEAL ALL VINYL FLOORS PER 3. FIELD VERIFY EXISTING CEILING GRID LOCATION AND NOTIFY ARCHITECT OF ANY THROUGH MATHEMATICAL MEANS FROM INFORMATION ALREADY PROVIDED ON THE J <br /> 10. NO 3/4" THICK SHELF SHALL SPAN LONGER THAN 32" WITHOUT SUPPORT. MANUFACTURER'S MAINTENANCE SPECIFICATIONS. A. FULL HEIGHT WALL FROM FLOOR TO CEILING. DISCREPANCIES ON PLANS. CONTRACT DOCUMENTS WILL NOT BE PROVIDED. Q W N ' <br /> B. STUDS AT 24" O.C., WITH 5/8" TYPE 'X' GYPSUM BOARD. � � (Y'� <br /> 11. ALL SHELVING TO BE ADJUSTABLE UNLESS OTHERWISE SPECIFIED. 28. FLOOR COVERING INSTALLER TO FOLLOW MANUFACTURER'S SPECIFIED CARPET 1. COORDINATE TELEPHONE/DATA INSTALLATION WITH APPROPRIATE C. NON-COMBUSTIBLE ACCESS DOOR WITH (3) HINGES AND SPRING CLOSER. 4. WHERE DISCREPANCIES IN LOCATION OF LIGHT FIXTURES, AIR DIFFUSERS, GRILLES, 5. SUBMITTALS NOT REQUESTED BY THE CONTRACT DOCUMENTS MAY OR MAY NOT � <br /> INSTALLATION WSTRUCTIONS. USfNG ADHESIVES AND INSTALLATION METHODS SUB-CONTRACTOR. ETC. OCCUR ON THE ELECTRICAL ENGINEERING PLANS, THE ARCHITECTURAL BE REVIEWED AT THE DESIGN TEAMS DISCRETION. � � <br /> 12. ALL FILE PEDESTALS ARE TO BE CONFIGURED FOR "FRONT TO BACK" FILING AND REQUIRED INSTRUCTIONS TO MAINTAIN PRODUCT'S WARRANTY. CONTACT CARPET 19. SURVEY EXISTING FLOORS AND C�EARLY MARK ON FLOOR SURFACE THE PLANS SHALL GOVERN. NOTIFY ARCHITECT OF ANY DISCREPANCIES FOR = <br /> BE ABLE TO ACCEPT METAL HANGERS TO ACCEPT PENDAFLEX TYPE FILE SALES REPRESENTATIVE WITH QUESTIONS PRIOR TO PROCEEDING. 2. ALL EXISTING ELECTRICAL DEV(CES ARE TO REMAIN, UNLESS NOTED OTHERWISE. LOCATIONS OF ALL BEAMS AND JOISTS. MARK ALL CORE DRILL PENETRATIONS CLARIFICATIONS. ~ <br /> � <br /> FOLDERS, UNLESS NOTED AS LATERAL. AND RECEIVE STRUCTURAL ENGINEER'S APPROVAL PRIOR TO DRILLING CONCRETE. 6. SUBMITTALS ARE TO BE ROUTED THROUGH THE ARCHITECT AND ARE NOT TO BE <br /> 29. FLOOR COVERING INSTALLER TO FOLLOW MANUFACTURER'S SPECIFIED CQNTOURED 3. ALL OUTLETS TO BE INSTALLED AT LOCATIONS SHOWN BY DIMENSIONS ON THE 5. FIELD VERIFY ALL CLEARANCES OF DUCTS, PIPES, SPRINKLERS, ETC., AND NOTIFY SENT DIRECTLY TO ARCHITECT'S CONSULTANTS UNLESS SPECIFICALLY AUTHORIZED W <br /> 13. ALL COUNTER TOPS TO BE 24" DEEP, UNLESS OTHERWISE SPECIFIED. WHERE NO RUBBER BASE INSTALLATION INSTRUCTIONS USING ADHESIVES AND INSTALLATION POWER & SIGNAL PLAN. DIMENSION ALL OUTLETS FROM THE CENTERLINE OF THE 20. CUT RIGID MATERIALS USING MASONRY SAW OR CORE DRILL. PNEUMATIC TOOLS ARCHITECT OF ANY CONFLICTS PRIOR TO INSTALLATION OF LIGHTS, ETC. BY THE ARCHITECT. W <br /> BACKSPLASH IS SPECIFIED, COUNTER TOPS TO BE SCRIBED TIGHTLY TO BACK & METHODS REQUIRED TO MAINTAIN PRODUCT'S WARRANTY. OUTLET BOX. NON-DIMENSIONED OUTLETS ARE TO LOCATED AT THE NEAREST ARE NOT ALLOWED WITHOUT PRIOR APPROVAL. W <br /> SIDE WALLS. WALL STUD. 6. PLACEMENT OF LIGHT FIXTURES IN AREAS WHERE MAIN DUCTS MAY CAUSE � <br /> 21. ALL CORE DRILLING OR OTHER NOISY WORK SHALL BE SCHEDULED 48-HOURS IN INTERFERENCE MUST BE APPROVED BY ARCHITECT PRIOR TO INSTALLATION. 7, MINOR CHANGES IN THE WORK MAY OCCUR AS A RESULT OF THE DESIGN TEAM'S a <br /> 30. FLOOR COVERING INSTALLER REQUIRED TO PROVIDE MINIMAL SEAMS/JOINTS AT � <br /> 4. WHEN OUTLETS ARE GROUPED TOGETHER (2 OR MORE), THEY ARE TO BE SPACED ADVANCE WITH THE OWNER. m <br /> 14. ALL BACKSPLASHES TO BE SCRIBED TO WALLS, AND MUST BE FLUSN TO EDGE ALL LOCATIONS FOR FLOOR AND WALL BASE MATERIAL INSTALLATION. PROVIDE REVIEW. IF A CHANGE RESULTS IN MODIFICATIONS TO THE CONTRACT PRICE OR <br /> OF BASE, UNLESS OTHERWISE SPECIFIED. ALL COUNTER TRANSITION SEAMS MUST LOW VOC, BUT HEAVY DUTY ADHESIVES TO ENDURE HEAVY FOOT TRAFFIC, CARTS NO MORE THAN 2" APART. 7. CONDUITS ABOVE CEILING MUST BE A MINIMUM OF 12" ABOVE THE CEILING GRID. SCHEDULE, THE CONTRACTOR WILL ISSUE A CHANGE ORDER REQUEST FOR REVIEW � <br /> BE CAULKED SEALED, VERIFY EITHER MATCHING COLOR CAULK OR CLEAR 22. APPLY CEMENT BASE FLOOR PATCH AS REQUIRED TO FILL DINGS, NA(L HOLES, AND APPROVAL BY THE OWNER AND ARCHITECT PRIOR TO PROCEEDING. � ` <br /> AND TO MAINTAIN PRODUCT'S WARRANTY. � <br /> SILICONE. 5. ALL ELECTRICAL OUTLETS OF 30 AMPERES OR LESS SHALL BE MOUNTED BETWEEN CHIPS AND CRACKS. 8. NO COMBUSTIBLE MATERIALS SHALL BE USED IN THE PLENUM SPACE, INCLUDING X <br /> +15" TO BOTTOM RECEPTACLE AND +48" TO TOP OF RECEPTACLE FROM FINISH ALUMINUM FLEX ALUMINUM CONDUIT AND POT METAL CONNECTORS. `�' <br /> 31. PRIOR TO PAINTING, WALLS MUST BE PATCHED AND REPAIRED, CLEAN AND DRY ' ' Y <br /> 15. PROVIDE SIDE SPLASHES AT LOCATIONS ADJACENT TO WALLS OR WINDOWS, AND PROPERLY MEMBERED AND ALIGNED S0, AS TO LEAVE NO EVIDENCE OF FLOOR. SEE NOTE 6, BELOW, FOR GENERAL MOUNTING HEIGHT 23. AT FLOOR AREAS SCHEDULED TO RECEIVE NEW FLOOR COVERING, REMOVE o <br /> ESPECIALLY FOR S�NKS U.O.N. PATCHING OR REPAIRS. ALL SCREW AND NAIL HEADS MUST BE SET AND EXISTING FLOOR COVERING AND PREPARE SUBSTRATE FOR NEW FLOOR COVERING 9. ALL JUNCTION BOXES AND MECHANICAL EQUIPMENT REQUIRING ACCESS FOR REQUESTS FOR INFORMATION RFI�S � <br /> 6. ALL NEW WALL MOUNTED 15 20 AND 30 AMP OUTLETS RECEPTACLES TO BE PER SPECIFICATIONS AND MANUFACTURER'S REQUIREMENTS. SERVICE SHALL BE LOCATED OVER ACOUSTICAL CEILINGS. NO ACCESS HATCHES � � <br /> SPACKLED. ALL JOINTS MUST BE TAPED AND COVERED WITH JOINT COMPOUND. > > � � Y <br /> �� SHALL BE INSTALLED IN GYPSUM BOARD CEILINGS WITHOUT PRIOR APPROVAL BY <br /> 16. FACES OF PIGEONHOLES TO MATCH WORK SURFACE LAMINATE. CO�OR OF EDGE JOINTS THAT ARE FILLED TO BE SANDED SMOOTH AND DUST REMOVED PRIOR TO CENTERED AT +18 A.F.F., U.O.N. 1. THE GENERAL CONTRACTOR IS TO REVIEW ALL PROSPECTIVE RFI's AND MAKE � Q <br /> BANDING ON ALL DOORS TO MATCH FACE MATERIAL. RECEIVING NEW PAINT FINISH APPLICATION. 24. AT ABANDONED PENETRATIONS OF FtRE RATED WA�LS, CEILING OR FLOOR ARCHITECT. (NO EXCEPTION) EVERY EFFORT TO ANSWER THEM BEFORE SUBMITTING TO THE DESIGN TEAM. o g <br /> 7. ALL TELEPHONE AND DATA CABLE TO BE TEFLON COATED PLENUM RATED CABLE, CONSTRUCTION, COMPLETELY SEAL VOIDS WITH FIRE RATED MATERIAL TO FULL � � <br /> 17. SEE SPECIFICATIONS/PROJECT MANUAL FOR ADDITIONAL REQUIREMENTS. 32. PRIOR TO PAINTING OVER WALL COVERING, SECURELY GL.UE DOWN ANY LIFTING OR SUPPORTED INDEPENDENTLY FROM SUSPENDED CEILING SYSTEM. CABLING TO BE THICKNESS OF THE PENETRATED ELEMENT. ALL PATCHING OF EXISTING WORK TO 10. ALL SPRINKLER HEADS AT HARD-LID CEILINGS ARE TO BE FULLY RECESSED AND �z <br /> BUCKLING AND HIDE ALL SEAMING OR BUMPS. SUPPLIED BY TENANT; ALL PULLS AND TERMINATIONS BY GENERAL CONTRACTOR. REMAIN SHALL MATCH FINISH PER SCHEDULE OR WHERE UNSCHEDULED TO CONCEALED. HEADS ARE TO BE CENTERED BETWEEN LIGHTS IN A UNIFORM 2. MINOR CHANGES IN THE WORK MAY OCCUR AS A RESULT OF THE DESIGN TEAM'S <br /> 18. COUNTERTOPS SHALL HAVE A NOSING OF COUNTERTOP MATERIAL AT LEAST 3° MATCH EXISTING FINISHES TO REMAIN, AND SHALL MEET OR EXCEED FIRE RATING ARCHITECTURAL PATTERN. G.C. TO PROVIDE A SUBMITTAL WITH SPRINKLER HEAD REVIEW. IF A CHANGE RESULTS IN MODIFICATIONS TO THE CONTRACT PRICE OR o <br /> DEEP, WHEREBY THE COUNTER MATERIAL EXTENDS INTO THE INSIDE OF THE 33. WALLS TO HAVE AT LEAST ONE COAT OF COLORED PRIMER AND TWO COATS OF 8. LOCATIONS OF FURNITURE POWER FEEDS SHALL ACCOMMODATE CIRCUITS AND INDICATED ON FLOOR PLAN AND AS REQUIRED BY THE FIRE/LIFE SAFETY LOCATIONS FOR ARCHITECT 5 APPROVAL PRIOR TO INSTALLATION. SCHEDULE, THE CONTRACTOR WILL ISSUE A CHANGE ORDER REQUEST FOR REVIEW o <br /> CABINET, I.E. OVER THE DOOR (WHEN PRESENT). SPECIFIED PAINT FINISH TYPE. PAINT TO BE A LOW VOC UNLESS U.O.N. HIGH WIRE PER ELECTRICAL DRAWINGS. TENANT SHALL BE RESPONSIBLE F4R INSPECTOR. AND APPROVAL BY THE OWNER AND ARCHITECT PRIOR TO PROCEEDING. _ <br /> TRAFFIC/WEAR ABILITY WITH GOOQ SCRUB AND CLEANING ABILITY. VERIFY ALL PROVIDING FURNITURE POWER FEED, GENERAL CONTRACTOR SHALL INSTALL THE 11. ALL GYPSUM BOARD CEILINGS ARE TO BE INSTALLED WITH LINEAR DIFFUSERS. . <br /> 19. END PANELS AND FRONT EDGES OF EDGE PANELS WHICH ARE PROUD OF THE WITH TENANT OR OWNER PRIOR TO PURCHASING PAINT. POWER FEED. 25. COORDINATE EXISTING SPRINKLER LINE AND HEAD LOCATION WITH NEW PLAN. G.C. TO PROVIDE A SUBMITTAL WITH ALL LINEAR DIFFUSER LOCATIONS PRIOR T0 m <br /> INTERIOR CABINET SHALL BE FACED TO MATCH DOOR FRONTS. SUBMIT SPRINKLER SHOP DRAWINGS TO ARCHITECT FOR REVIEW WITH THE CITY INSTALLATION. 3. AN RFI LOG IS TO BE MAINTAINED BY THE GENERAL CONTRACTOR AND A �- U) <br /> 34. PAINT ALL SPEAKER COVERS AND HVAC GRILLS IN GYPSUM BOARD WALLS AND 9• WHERE DEDICATED ELECTRICAL OUTLETS ARE NOTED WITHIN THE FURNITURE FIRE DEPARTMENT. CURRENT COPY IS TO BE INGLUDED WITH EACH RFI SUBMISSION ALONG WITH ANY �z W � <br /> PANEL SYSTEM, THE PANEL SYSTEM SHALL ACCOMMODATE THIS REQUIREMENT. 12. LOCATE RECESSED DOWN �IGHTS, WALL WASHERS, SMOKE DETECTORS, EXIT SIGNS, CRITICAL RESPONSE DUE DATES. � <br /> 20. ALL HINGED DOORS TO HAVE CLEAR SILENCERS TOP AND BOTTOM ON DOOR (NOT CEILINGS TO MATCH ADJACENT PAINT COLOR AS SPECIFIED. „ „ J I- o <br /> CABINET). 26. CONTRACTOR IS RESPONSIBLE FOR BUILDING SECURITY DURING DEMOLITION SPEAKERS, FIRE SPRINKLERS, ETC. IN CENTER OF 24 x24 CEILING TILES OR IN Q O <br /> 35. PRIOR TO INSTALLING WALL TILES AND WALL BASE TILE, WALLS MUST BE 10. FLOOR OUTLETS ARE ACCEPTABLE NEXT TO SLIDWG PANELS/WALLS AND OTHER PHASE. PROTECT ALL OPENINGS FRQM WEATHER CONDITIONS AND SECURE THEM CENTER OF 24"x24" PORTION OF 24"x48" CEILING TILES, UNLESS OTHERWISE 4. RFI's REGARDING METHODS AND MEANS OF CONSTRUCTION WILL NOT BE REVIEWED c=n z <br /> 21. ALL DRAWERS GLIDES SHALL HAVE SILENCERS BUILT INTO THE GLIDE AND NOT PATCHED AND REPAIRED, CLEAN AND DRY AND BE PROPERLY MEMBERED AND SPECIAL CONVENIENT LOCATIONS. TO PREVENT VANDALISM. NOTED. AND WILL BE REMOVED FROM THE RFI LOG. o <br /> INSTALLED ON THE DRAWER OR DRAWER FRONT. ALIGNED, S0, AS TO LEAVE NO EVIDENCE OF PATCHING OR REPAIRS. ALL SCREW ¢ -� <br /> AND NAIL HEADS MUST BE SET AND SPACKLED. AL� JOINTS MUST BE TAPED AND 11. WHERE E�ECTRICAL WORK IS SPECIFIED IN CONJUNCTION WITH CABINET WORK, 27. DO NOT PERFORM ANY WORK THAT WILL VOID WARRANTIES OF EXISTING 13. PROVIDE SWITCHES AND LIGHT SENSORS FOR OPEN AREAS AND PRIVATE OFFICES. m w <br /> 22. ALL DRAWER GLIDES SHALL BE FULL EXTENSION. COVERED WITH JOINT COMPOUND. JOINTS THAT ARE FILLED ARE TO BE SANDED LAMPS AND FIXTURES ARE TO BE PROVIDED BY THE GENERAL CONTRACTOR. WEATHER EXPOSED OR MOISTURE RESISTANT ELEMENTS WITHOUT PRIOR ACTUAL LOCATION OF ALL SWITCHES TO BE DETERMINED BY ELECTRICAL CHANGE ORDERS � � > <br /> SMOOTH AND BUMP FREE WITH DUST REMOVED PRIOR TO RECEIVING MORTAR APPROVAL FROM THE OWNER. ENGINEER. J W � <br /> 12. CUT-OUTS FOR SWITCHES, OUTLETS, ETC. AS REQUIRED BY THE CABINET 1. A COMPLETE SCHEDULE OF VALUES OF THE BASE CONTRACT IS TO BE PROVIDED Q <br /> 23. ALL HINGES SHALL OPEN f105', EXCEPT WHERE CABINETS ARE ADJACENT TO THE BED/BOND COAT AND WALL TILES. 28. ARCHITECT ASSUMES NO RESPONSIBILITY RELATWG TO ANY TOXIC MATERIALS, � z � ~ <br /> CONTRACTOR ARE TO BE COORDINATED WITH THE ELECTRICAL CONTRACTOR, 14. WHERE EXIT SIGNS ARE REQUIRED PER STATE & LOCAL CODES, THEY SHALL BE TO THE OWNER AND ARCHITECT PRtOR TO THE START OF ANY WORK. <br /> WALLS. PROVIDE HINGES WHICH LIMIT THE DOOR SWING TO KEEP THE DOOR PULL w �,J,J > w <br /> FROM DAMAGING THE WALL. 36. ALL WALL TILES ARE TO HAVE A MORTAR BED/BOND COAT THICKNESS TO U.N.O. ALL RECEPTACLES WHERE MILLWORK OCCURS SHA�L BE LOCATED PER INCLUDING ASBESTOS, AND ASSUMES NO RESPONSIBILITY TO ITS EXISTENCE OR ILLUMINATED PER SAID CODES AND THE NEC. LOCATIONS SHALL BE Q Y � � . <br /> ELEVATIONS OF THE MILLWORK ITEM IN QUESTION. REMOVAL. THE OWNER WILL TAKE ACTION FOR DIRECTLY CONTRACTING WITH A COORDINATED WITH THE ARCHITECT. C� <br /> ACCOMMODATE THE VARYING THICKNESSES OF ALL MATERIAL TYPES OF TILE � � � � F- <br /> CONSULTANT OR SPECIALIST, LICENSED BY THE STATE, FOR SUCH SERVICES 2. ALL CHANGE ORDER REQUESTS ARE TO BE REVIEWED AND APPROVED BY THE ,l Q z o <br /> SPECIFIED FOR WALL INSTALLATION WITH A FLUSH FRONT FACE. g ,L, ,l � <br /> 13. ALL WALL COVER PLATES SHALL BE WHITE, UNLESS BUILDING STANDARD IS SHOULD THOSE SERVICES BE REQUIRED ON THE PROJECT. 15. PROVIDE BACK-UP POWER FOR EXIT SIGNS PER STATE & LOCAL CODES. OWNER AND ARCHITECT PRIOR TO SUBMISSION OF A CHANGE ORDER. � w � w <br /> DIFFERENT, MATCH BUILDING STANDARD. '- � �' ``' n- <br /> 37. ALL TRANSLUCENT GLASS TILE SPECIFIED ARE TO RECEIVE UNIFORM COVERAGE _ � <br /> 29. IF THE EXISTING BUILDING CONSTRUCTION IS CLASSIFIED SUCH THAT 16. THE MEANS OF EGRESS, INCLUDING THE EXIT DISCHARGE, SHALL BE ILLUMINATED <br /> BY BACK BUTTERING TILES AND TROWEL RIDGES FLATTENED PRIOR TO SETTING � o � o <br /> TRANSLUCENT GLA5S TILES. 14. ALL SEPARATE CIRCUIT RECEPTACLES TO BE ORANGE COLOR WITH BUILDING FIREPROOFING INSULATION IS PRESENT, THEN THE CONTRACTOR, PRIOR TO TO A LEVEL OF NOT LESS THAN ONE FOOT CANDLE AT THE WALKING SURFACE 3. CHANGE ORDER REQUESTS ARE TO INCLUDE A COMPLETE BREAKDOWN BY TRADE >- '�- � <br /> STANDARD COLOR COVER PLATE. STARTING ANY WORK, SHALL VERIFY THE CURRENT FIRE-RESISTANCE RATING(S) AT ALL TIMES THE BUILDING SPACE SERVED BY THE MEANS OF EGRESS IS ALONG WITH TRADE BACK-UP AND UNIT PRICING WHERE APPLICABLE. o � o <br /> OF THE EXISTING BUILDING ELEMENT(S). IF THE EXISTING FIREPROOFING OCCUPIED. � � <br /> 38. FLOORS OF TOILETS, BATHING AND SHOWER ROOMS SHALL HAVE A SMOOTH, > �„ <br /> � 15. POWER SIGNAL AND REFLECTED CE►LING PLANS ARE FOR THE GENERAL INSULATION IS DAMAGED AFFECTED DURING THE COURSE OF THE WORK, AS 4. A CHANGE ORDER REQUEST AND CHANGE ORDER LOG IS TO BE MAINTAINED BY � � cn <br /> HARD, NONABSORBENT SURFACE. THE INTERSECTION OF SUCH FLOORS WITH � � 17. EMERGENCY LIGHTING SHALL BE Q <br /> � WALLS SHAL� HAVE A SMOOTH, HARD, NONABSORBENT VERTICAL BASE AS INFORMATION OF THE CONTRACTOR. EXACT LOCATIONS SHOULD BE VERIFIED. DEFWED BY THIS PROJECT SCOPE, THEN THE CONTRACTOR SHALL PATCH/REPAIR (2) SEPARATE SOURCES OF POWER AND SHALL THE GENERAL CONTRACTOR AND SUBMITTED ALONG WITH EACH CHANGE ORDER <br /> o SPECIFIED IN FINISH PLANS OR RESTROOM ELEVATIONS. BASE SHALL EXTEND THE FIREPROOFING INSULATION TO A CONDITION THAT SHALL MATCH OR EXCEED COMPLY WITH THE NEC. REQUEST. � o � N <br /> Q� UPWARD ONTO THE WALLS NOT LESS THAN 4 INCHES. 16. TENANT TO PROVIDE AND INSTALL THE TELEPHONE AND DATA COMMUNICATION THE ORIGINAL FIRE-RESISTANCE RATING(S) OF THE EXISTING BUILDING �'-� � a o 0 <br /> �,� CABLING. CONTRACTOR TO COORDINATE SCHEDULING AND OTHER REQUIREMENTS 18. PROVIDE FIRE DAMPERS AT ALL SUPPLY AND RETURN AIR OUTLETS, INLETS OR o ¢ � � � <br /> WITH TENANT. ELEMENT(S). DUCTS PENETRATWG FIRE RATED ASSEMBLIES, ENCLOSURES, WALLS, FLOORS OR D E S I G N B U I L D N O T E S � � � � � <br /> 0 39. WALLS AND PARTITIONS WITHIN 2 FEET OF SERVICE SINKS, URINALS AND WATER � o 0 0 � <br /> j CLOSETS SHALL HAVE A SMOOTH, HARD, NONABSORBENT SURFACE TO A NEIGHT SURFACES AND AS REQUIRED BY THE FIRE DEPARTMENT. �`' N N <br /> � OF NOT LESS THAN 4 FEET ABOVE THE FLOOR. 17. ALL/ANY CORE DRILL LOCATIONS SHALL BE VERIFIED WITH DESIGNER PRIOR T0 3 0. C O N T R A C T O R T O R E L O C A T E A N D R E U S E E X I S T I N G D O O R S A N D H A R D W A R E W H E R E ' _ <br /> i DRILLING. ALL UNUSED CORE DRILLS SHALL BE PLUGGED AND CAPPED AS POSSIBLE. 19. CONTRACTOR SHALL PROVIDE EMERGENCY LIGHTING, STROBE LIGHTS, ~ <br /> 0 40. CONTROL JOINTS AT GYPSUM BOARD ASSEMBLIES: THE MAXIMUM RECOMMENDED REQUIRED TO MAINTAIN FLOOR FIRE RATING. AUDIO-VISUAL ALARMS AND OCCUPANCY SENSORS TO MEET ALL APPLICABLE � <br /> �� 31. EXISTING DOORS TO REMAIN U.O.N. CODES. �� ¢ <br /> / CONTROL JOINT SPACING FOR WALLS AND CEILINGS WITHOUT PERIMETER RELIEF IS 1. LIGHT SWITCHES SHALL BE INSTALLED AT +48 A.F.F. MULTIPLE SWITCHES <br /> 0 18. ALL TELEPHONE AND COMPUTER WIRES SHALL BE PULLED BY TENANT z PA/PM: I. CONNOR <br /> 30 LINEAR FEET OR 900 SQUARE FEET OF SURFACE AREA, WITH PERIMETER SHOULD BE GANGED TOGETHER UNLESS OTHERWISE SPECIFIED. <br /> � RELIEF IS 50 LINEAR FEET OR 2,500 SQUARE FEET OF SURFACE AREA. EXTERIOR CONTRACTOR U.O.N. ELECTRICAL CONTRACTOR SHALL PROVIDE PULL WIRES AND 20. CONTRACTOR SHALL PROVIDE LAMPS WITH TYPE IC RATED HOUSING WHERE � <br /> � JOINT SPACING IS RECOMMENDED AT 30 LINEAR FEET OR 900 SQUARE FEET OF BOXES AT EACH LOCATION. FIXTURES COME IN DIRECT CONTACT WITH INSULATION. 2. CONTRACTOR TO VERIFY ALL SWITCH LOCATIONS WITH THE ARCHITECT PRIOR TO � DRAWN BY: A.K. <br /> � SURFACE AREA. INSTALLATION. NUMBER OF SWITCHES FOR OPEN AREA IS BIDDER DESIGN. �- <br /> L 19. CONTRACTOR SHALL OBTAIN APPROVAL FROM ARCHITECT FOR ALL THERMOSTAT 21. EXIT SIGNS SHALL BE INTERNALLY OR EXTERNALLY ILLUMINATED AT ALL TIMES SWITCHES INDICATED ON THE DRAWINGS FOR OPEN AREA ARE FOR REFERENCE w JOB NO.: SEA17-6002-00 <br /> j 41. CONSTRUCTION JOINTS (EXPANSION JOINTS) AT GYPSUM BOARD ASSEMBLIES: LOCATIONS. AND SHALL BE CONNECTED TO AN EMERGENCY POWER SYSTEM (BATTERIES, UNIT ONLY. c°-i, <br /> � CONSTRUCTION JOINTS ARE REQUIRED AT CONTINUOUS GYPSUM BOARD SURFACES EQUIPMENT OR AN ON-SITE GENERATOR) THAT WILL AUTOMATICALLY lLLUMINATE o <br /> % WITH DISSIMILAR WALL STRUCTURE. THE EXIT SIGNS FOR A DURATION QF NOT LESS THAN 94 MINUETS. 3. CONTRACTOR SHALL PROVIDE SEISMIC BRACING AT ALL NEW AND RELOCATED Q SHEET <br /> o LIGHT FIXTURES. � � , <br /> o c� <br /> � 4. CONTRACTOR SHALL VERIFY AND PROVIDE A COMPLETE HVAC SYSTEM WHICH � o <br /> CONFORMS TO THE OWNER'S HVAC SPECIFICATIONS. CONTRACTOR SHALL BE Q N <br /> J RESPONSIBLE FOR ALL ROOF PENETRATIONS AND PATCHING, ANY SCREENING OF � ■ Q <br /> j ROOF-MOUNTED MECHANICAL UNIT REQUIRED BY GOVERNING JURISDICTION. w N <br /> � � ° <br /> � <br />