My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc Everett Station Parking Expansion
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc Everett Station Parking Expansion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 3:08:45 PM
Creation date
10/18/2019 2:55:35 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
10/4/2019
Council Approval Date
9/18/2019
Department
Transportation Services
Department Project Manager
Vince Bruscas
Subject / Project Title
Everett Station Parking Expansion
Public Works WO Number
1807-018
Total Compensation
$1,026,969.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
525
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 The last paragraph is revised to read: <br /> 2 <br /> 3 Stainless Steel Clad and Stainless Steel Tube Dowel bar ends shall be sealed with a <br /> 4 patching material (primer and finish coat) used for patching epoxy-coated reinforcing steel <br /> 5 as required in Section 9-07.3, item 6. <br /> 6 <br /> 7 9-07.7 Wire Mesh <br /> 8 This section is supplemented with the following: <br /> 9 <br /> 10 Welded wire manufacturers shall participate in the NTPEP Audit Program for Reinforcing <br /> 11 Steel (rebar) Manufacturers and shall be listed on the NTPEP audit program website <br /> 12 displaying that they are NTPEP compliant. <br /> 13 <br /> 14 Section 9-08, Paints and Related Materials <br /> 15 January 7, 2019 <br /> 16 9-08.1(1) Description <br /> 17 The first sentence is revised to read: <br /> 18 <br /> 19 Paint used for highway and bridge structure applications shall be made from materials <br /> 20 meeting the requirements of the applicable Federal and State Paint Specifications, <br /> 21 Department of Defense (DOD), American Society of Testing of Materials (ASTM), and The <br /> 22 Society for Protective Coatings (SSPC) specifications in effect at time of manufacture. <br /> 23 <br /> 24 9-08.1(2) Paint Types <br /> 25 This section is supplemented with the following new subsections: I <br /> 26 <br /> 27 9-08.1(2)M NEPCOAT Qualified Products List A <br /> 28 Qualified products used shall be part of a NEPCOAT system supplied by the same <br /> 29 manufacturer. <br /> 30 <br /> 31 9-08.1(2)N NEPCOAT Qualified Products List B <br /> 32 Qualified products used shall be part of a NEPCOAT system supplied by the same <br /> 33 manufacturer. <br /> 34 <br /> 35 9-08.1(2)D Organic Zinc-Rich Primer <br /> 36 This section, including title, is revised to read: <br /> 37 <br /> 38 Vacant <br /> 39 <br /> 40 9-08.1(2)E Epoxy Polyamide <br /> 41 This section is revised to read: <br /> 42 <br /> 43 Epoxy polyamide shall be a two-component system conforming to MIL-DTL-24441 or <br /> 44 SSPC Coating Standard No. 42. <br /> 45 <br /> 46 9-08.1(2)H Top Coat, Single-Component, Moisture-Cured Polyurethane <br /> 47 This section is revised to read: <br /> 48 <br /> 49 Vehicle Type: Moisture-cured aliphatic polyurethane. <br /> City of Everett Page AM-124 Amendments <br /> 111 <br /> Everett Station 80 Stall Parking Expansion June 2019 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.