My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc Everett Station Parking Expansion
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc Everett Station Parking Expansion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 3:08:45 PM
Creation date
10/18/2019 2:55:35 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
10/4/2019
Council Approval Date
9/18/2019
Department
Transportation Services
Department Project Manager
Vince Bruscas
Subject / Project Title
Everett Station Parking Expansion
Public Works WO Number
1807-018
Total Compensation
$1,026,969.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
525
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I 1 9-29.17 Signal Head Mounting Brackets and Fittings <br /> 9 <br /> 2 In the first paragraph, item number 2 under Stainless Steel is revised to read: <br /> I 3 <br /> 4 2. Bands or cables for Type N mount. <br /> 5 <br /> I 6 9-29.20 Pedestrian Signals <br /> 7 In item 2C of the second paragraph, "Federal Standard 595" is revised to read "SAE AMS <br /> 8 Standard 595". <br /> 9 <br /> I10 9-29.24 Service Cabinets <br /> 11 The third sentence of item number 6 is revised to read: <br /> 12 <br /> I 13 The dead front cover shall have cutouts for the entire breaker array, with blank covers <br /> 14 where no circuit breakers are installed. <br /> 15 <br /> I 16 Item number 8 is revised to read: <br /> 17 <br /> 18 8. Lighting contactors shall meet the requirements of Section 9-29.24(2). <br /> I 19 <br /> 20 The last sentence of item number 10 is revised to read: <br /> 21 <br /> 22 Dead front panels shall prevent access to any exposed, live components, and shall cover <br /> I <br /> 23 all equipment except for circuit breakers (including blank covers), the photocell test/bypass <br /> 24 switch, and the GFCI receptacle. <br /> 25 <br /> I 26 9-29.24(2) Electrical Circuit Breakers and Contactors <br /> 27 This section is revised to read: <br /> 28 <br /> I 29 All circuit breakers shall be bolt-on type, with the RMS-symmetrical interrupting capacity <br /> 30 described in this Section. Circuit breakers for 120/240/277 volt circuits shall be rated at 240 <br /> 31 or 277 volts, as applicable, with an interrupting capacity of not less than 10,000 amperes. <br /> 32 Circuit breakers for 480 volt circuits shall be rated at 480 volts, and shall have an <br /> I <br /> 33 interrupting capacity of not less than 14,000 amperes. <br /> 34 <br /> 35 Lighting contactors shall be rated for tungsten or ballasted (such as sodium vapor, mercury <br /> I 36 vapor, metal halide, and fluorescent) lamp loads. Contactors for 120/240/277 volt circuits <br /> 37 shall be rated at 240 volts maximum line to line voltage, or 277 volts maximum line to <br /> 38 neutral voltage, as applicable. Contactors for 480 volt circuits shall be rated at 480 volt <br /> I <br /> 39 maximum line to line voltage. <br /> 40 <br /> 41 Section 9-33, Construction Geosynthetic <br /> I42 August 6, 2018 <br /> 43 9-33.4(1) Geosynthetic Material Approval <br /> 44 The second sentence of the first paragraph is revised to read: <br /> I <br /> 45 <br /> 46 If the geosynthetics material is not listed in the current WSDOT QPL, a Manufacturer's <br /> 47 Certificate of Compliance including Certified Test Reports of each proposed geosynthetic <br /> I 48 shall be submitted to the State Materials Laboratory in Tumwater for evaluation. <br /> 49 <br /> I City of EverettPage AM 141 Amendments <br /> Everett Station 80 Stall Parking Expansion June 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.