My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc Everett Station Parking Expansion
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc Everett Station Parking Expansion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 3:08:45 PM
Creation date
10/18/2019 2:55:35 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
10/4/2019
Council Approval Date
9/18/2019
Department
Transportation Services
Department Project Manager
Vince Bruscas
Subject / Project Title
Everett Station Parking Expansion
Public Works WO Number
1807-018
Total Compensation
$1,026,969.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
525
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 1 TABLE OF CONTENTS - SPECIAL PROVISIONS <br /> I 2 INTRODUCTION TO THE SPECIAL PROVISIONS 1 <br /> 3 Division 1 - General Requirements 2 <br /> 4 1-01 DEFINITION AND TERMS 2 <br /> I 5 1-01.3 Definitions 2 <br /> 6 1.02 BID PROCEDURES AND CONDITIONS 5 <br /> 7 1.02.1 Prequalification of Bidders 5 <br /> I <br /> 8 <br /> 9 1-02.4 Examination of Plans, Specifications, and Site of Work 6 <br /> 1-02.5 Proposal Forms 6 <br /> 10 1-02.6 Preparation of Proposal 7 <br /> I 11 1-02.7 Bid Deposit 8 <br /> 12 1-02.8 Non-collusion Declaration and Lobbying Certification 8 <br /> 13 1-02.9 Delivery of Proposals 8 <br /> 14 1-02.13 Irregular Proposals 9 <br /> I 15 1-02.15 Pre-Award Information 9 <br /> 16 1-03 AWARD AND EXECUTION OF CONTRACT 10 <br /> 17 1-03.1 Consideration of Bids 10 <br /> I <br /> 18 <br /> 19 1-03.3 Execution of Contract 10 <br /> 1-03.4 Contract Bond 10 <br /> 20 1-03.7 Judicial Review 10 <br /> I <br /> 21 <br /> 22 1-04 SCOPE OF THE WORK 11 <br /> 1-04.2 Coordination of Contract Documents, Plans, Special Provisions, Specifications, and <br /> 23 Addenda 11 <br /> 24 1-04.4 Changes 14 <br /> I 25 1-04.5 Notice by Contractor 16 <br /> 26 1-04.7 Differing Site Conditions (Changed Conditions) 17 <br /> 27 1-05 CONTROL OF WORK 18 <br /> I 28 1-05.1 City 18 <br /> 29 1-05.2 City's Representative 19 <br /> 30 1-05.3 Working Drawings 20 <br /> I 31 1-05.4 Conformity With and Deviations From Plans and Stakes 22 <br /> 32 1-05.6 Inspection of Work and Materials 24 <br /> 33 1-05.7 Removal of Defective and Unauthorized Work 25 <br /> 34 1-05.10 Guarantees 26 <br /> I 35 1-05.11 Final Inspections and Operational Testing 27 <br /> 36 1-05.12 Final Acceptance 28 <br /> 37 1-05.13 Superintendents, Labor, and Equipment of the Contractor 29 <br /> I <br /> 38 <br /> 39 1-05.14 Cooperation With Other Contractors 29 <br /> 1-05.16 Water and Power 30 <br /> 40 1-05.16 Water and Power 30 <br /> 41 1-05.17 Oral Agreements 30 <br /> I 42 1-05.18 Contractor 30 <br /> 43 1-05.16 Water and Power 30 <br /> 44 1-05.19 City-Contractor Coordination 33 <br /> I <br /> 45 1-05.16 Water and Power 33 <br /> 46 1-08.11 Record Drawings 34 <br /> 47 1-06 CONTROL OF MATERIAL 36 <br /> I <br /> 48 <br /> 49 1-06.1 Approval of Materials Prior to Use 36 <br /> 1-06.2 Acceptance of Materials 37 <br /> I City of Everett Page SP-i Special Provisions <br /> Everett Station 80 Stall Parking Expansion June 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.