Laserfiche WebLink
I <br /> I 1 <br /> 2 Irrespective of any request for additional compensation or Contract Time or any Contract <br /> I <br /> 3 <br /> 4 Claim that Work is extra and not part of the original scope of Work, the Contractor shall <br /> proceed expeditiously and promptly with the Work as the Owner orders. <br /> 5 <br /> I <br /> 6 <br /> 7 If the Contractor fails to follow the procedures of this Contract, including failing to give <br /> Notice, the Contractor completely waives any Contract Claims. In its sole discretion, the <br /> 8 Owner may waive strict compliance with procedures, but any such waiver of one or more <br /> 9 items or elements does not waive the necessity for Contractor's strict compliance with any <br /> I 10 other item or element, nor shall such waiver be admissible in any legal proceeding for any <br /> 11 reason. <br /> 12 <br /> I 13 1-04.5(2) Form of Notice <br /> 14 The Notice must include the following minimum information: <br /> 15 <br /> I16 1. A complete and accurate description of the event(s) giving rise to the Notice, <br /> 17 including dates, times, and locations; <br /> 18 2. A preliminary list of persons of involved in such event; <br /> I <br /> 19 <br /> 20 3. A statement whether the Contractor believes the event may result in a Contract <br /> Claim for additional Contract Time or adjustment of the Contract Sum; <br /> 21 4. A date by which Contractor shall begin providing Supplemental Information as <br /> I22 provided in this Section. <br /> 23 <br /> 24 1-04.5(3) Supplemental Information <br /> 25 The Contractor shall supplement the written Notice as soon as possible with a written <br /> I <br /> 26 statement providing the following: <br /> 27 <br /> 28 1. The date of the event, incident, direction, etc.; <br /> 29 2. The nature and circumstances giving rise to the Notice; <br /> 30 3. The Contract provisions relating to the event, incident, direction, etc.; <br /> 31 4. The estimated dollar cost, if any, of the Extra Work, delay, etc. and how that <br /> I32 estimate was determined; and <br /> 33 5. An analysis of the progress schedule showing the schedule change or disruption if <br /> 34 the Contractor is asserting a schedule change or disruption. <br /> 1 35 <br /> 36 Throughout any Work related to a Notice, the Contractor shall keep complete and accurate <br /> 37 records of costs, expenses, and time incurred for which Contractor will or may seek an <br /> I 38 <br /> 39 adjustment. The Contractor waives and is estopped from seeking an adjustment of <br /> Contract Sum or Contract Time where the Contractor fails to keep and maintain cost, <br /> 40 timekeeping, and scheduling records segregated and contemporaneously allocated to the <br /> 41 subject Work for which an adjustment is sought. For example, failure to keep <br /> I 42 contemporaneous labor and Equipment time records specifically and only allocated to each <br /> 43 item of claimed Extra Work shall constitute a waiver of any Contract Claim for <br /> 44 reimbursement or additional Contract Time for each such item of Extra Work. The <br /> I <br /> 45 Contractor shall permit the Owner access to these and any other records needed for <br /> 46 evaluating requests for additional Contract Time or Contract Sum. <br /> 47 <br /> I <br /> 48 1-04.7 Differing Site Conditions (Changed Conditions) <br /> 49 Delete all of Section 1-04.7 and substitute the following: <br /> I City of Everett Page SP1 17 Special Provisions <br /> Everett Station 80 Stall Parking Expansion June 2019 <br />