Laserfiche WebLink
I <br /> Bridges,approach panels and 0,02 I <br /> miles before and after bridges and <br /> approach panels and other Control and acceptance profile <br /> III <br /> excluded areas within lanes <br /> requiring testing <br /> Ramps, Shoulders and Tapers Do not test ' <br /> 1 <br /> 2 Within 30 calendar days after the Contractor's testing, the Engineer may perform <br /> 3 verification testing. If the verification testing shows a difference in MRI greater than the 10 <br /> 4 percent, the following resolution process will be followed: <br /> 5 <br /> 6 1. The profiles, equipment and procedures will be evaluated to determine the cause <br /> 7 of the difference. <br /> 8 <br /> 9 2. If the cause of the discrepancy cannot be resolved the pavement shall be retested <br /> 10 with both profilers at a mutually agreed time. The two profilers will test the section <br /> 11 within 30 minutes of each other. If the retest shows a difference in MRI equal or <br /> 12 greater than the percentages shown in Table 2 of AASHTO R 54 the Engineer's <br /> 13 test results will be used for pavement smoothness acceptance. <br /> 14 <br /> 15 The Contractor shall evaluate profiles for acceptance or corrective action using the current <br /> 16 version of ProVAL and provide the results including the profile data in unfiltered electronic <br /> 17 Engineering Research Division (ERD) file format to the Engineer within 3 calendar days of111 <br /> 18 completing each days profile testing. If the profile data files are created using an export <br /> 19 option in the manufacturer's software where filter settings can be specified, use the filter <br /> 20 settings that were used to create data files for certification. <br /> 21 <br /> 22 Analyze the entire profile. Exclude areas listed in Table 3. <br /> 23 <br /> Table 3 <br /> Areas Excluded from MRI Acceptance Requirements <br /> Location Exclude <br /> Beginning and end of grinding Pavement within 0.02 mile <br /> The bridge and approach slab and <br /> Bridges and approach slabs 0.02 mile from the ends of the <br /> bridge or approach slab <br /> I <br /> Defects in the existing roadway <br /> identified by the Contractor that 0.01-mile section containing the <br /> adversely affect the MRI such as defect and the 0.01-mile section <br /> dips,depressions and wheel path following the section with the defect. <br /> longitudinal joints. <br /> 1The presence of defects is subject to verification by the Engineer <br /> 24 <br /> 25 Report the MRI results in inches per mile for each 0.01-mile section and each 0.10-mile <br /> 26 section. Do not truncate 0.10-mile sections for areas excluded from MRI acceptance <br /> 27 requirements. MRI requirements will not apply to 0.10-mile sections with more than three <br /> III <br /> 28 0.01 mile-sections excluded. MRI requirements for the individual 0.01-mile sections shall <br /> 29 still apply. The Engineer will verify the analysis. <br /> 30 <br /> I <br /> 31 The MRI for each 0.10 mile of ground lane will comply with the following: <br /> City of Everett Page AM-18 Amendments <br /> I <br /> Everett Station 80 Stall Parking Expansion June 2019 <br /> I <br />