Rodarte Construction Inc Everett Station Parking Expansion
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc Everett Station Parking Expansion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 3:08:45 PM
Creation date
10/18/2019 2:55:35 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
10/4/2019
Council Approval Date
9/18/2019
Department
Transportation Services
Department Project Manager
Vince Bruscas
Subject / Project Title
Everett Station Parking Expansion
Public Works WO Number
1807-018
Total Compensation
$1,026,969.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
525
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> 1 <br /> 2 Within 30 calendar days after the Contractor's testing, the Engineer may perform <br /> 3 verification testing. If the verification testing shows a difference in MRI greater than the <br /> I <br /> 4 percentages shown in Table 2 of AASHTO R 54 the following resolution process will be <br /> 5 followed: <br /> 6 <br /> 7 1. The profiles, equipment and procedures will be evaluated to determine the cause <br /> 8 of the difference. <br /> 9 <br /> I <br /> 10 2. If the cause of the discrepancy cannot be resolved the pavement shall be retested <br /> 11 with both profilers at a mutually agreed time. The two profilers will test the section <br /> 12 within 30 minutes of each other. If the retest shows a difference in MRI equal or <br /> 13 greater than the percentages shown in Table 2 of AASHTO R 54 the Engineer's <br /> I <br /> 14 test results will be used to establish pay adjustments. <br /> 15 <br /> 16 Surface smoothness of travel lanes not subject to MRI testing will be measured with a 10- I 17 foot straightedge no later than 5:00 p.m. of the day following the placing of the concrete. <br /> 18 The completed surface of the wearing course shall not vary more than 1/8 inch from the <br /> 19 lower edge of a 10-foot straightedge placed on the surface parallel to the centerline. <br /> I <br /> 20 <br /> 21 Smoothness perpendicular to the centerline will be measured with a 10-foot straightedge <br /> 22 across all lanes with the same cross slope, including shoulders when composed of cement <br /> 23 concrete pavement. The overlapping 10-foot straightedge measurement shall be ' <br /> 24 discontinued at a point 6 inches from the most extreme outside edge of the finished cement <br /> 25 concrete pavement. The completed surface of the wearing course shall not vary more than <br /> 26 1/4 inch from the lower edge of a 10-foot straightedge placed on the surface perpendicular to <br /> I <br /> 27 the centerline.Any deviations in excess of the above tolerances shall be corrected. <br /> 28 <br /> 29 The Contractor shall evaluate profiles for acceptance, incentive payments, disincentive <br /> I <br /> 30 payments, or corrective action using the current version of ProVAL and provide the results <br /> 31 including the profile data in unfiltered electronic Engineering Research Division (ERD) file <br /> 32 format to the Engineer within 2 calendar days of completing testing each section of <br /> 33 pavement. If the profile data files are created using an export option in the manufacturer's I <br /> 34 software where filter settings can be specified, use the filter settings that were used to <br /> 35 create data files for certification. Analyze the entire profile. Exclude any areas specifically <br /> 36 identified in the Contract. Exclude from the analysis the first 100 feet after the start of the <br /> 111 <br /> 37 paving operations and last 100 feet prior to the end of the paving operation, the first 100 <br /> 38 feet on either side of bridge Structures and bridge approach slab. Report the MRI results in <br /> 39 inches per mile for each 52.8 foot section and horizontal distance measurements in project <br /> I <br /> 40 stationing to the nearest foot. Include pay adjustments in the results. The Engineer will <br /> 41 verify the analysis. <br /> 42 <br /> 43 Corrective work for pavement smoothness may be taken by the Contractor prior to MRI <br /> 1 <br /> 44 testing. After completion of the MRI testing the Contractor shall measure the smoothness of <br /> 45 each 52.8-foot section with an MRI greater than 125 inches per mile with a 10-foot <br /> 46 straightedge within 14 calendar days or as allowed by the Engineer. The Contractor shall <br /> I <br /> 47 identify all locations that require corrective work and provide the straight edge <br /> 48 measurements at each location that exceeds the allowable limit to the Engineer. If all <br /> 49 measurements in a 52.8-foot section comply with smoothness requirements, the Contractor <br /> I <br /> 50 shall provide the maximum measurement to the Engineer and a statement that corrective <br /> 51 work is not required. Unless allowed by the Engineer, corrective work shall be taken by the <br /> City of Everett Page AM-26 Amendments <br /> 111 <br /> Everett Station 80 Stall Parking Expansion June 2019 <br />