My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IO Environmental and Infrastructure Inc Smith Street Cleanup and Fill Project
>
Contracts
>
Capital Contract
>
IO Environmental and Infrastructure Inc Smith Street Cleanup and Fill Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 4:23:30 PM
Creation date
10/18/2019 4:16:56 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IO Environmental and Infrastructure Inc
Approval Date
9/25/2019
Council Approval Date
8/21/2019
Department
Transportation Services
Department Project Manager
Vince Bruscus
Subject / Project Title
Smith Street Cleanup and Fill Project
Total Compensation
$366,191.78
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 35 53 - 1 <br /> 3600 Smith Street Clean Up <br /> SECTION 01 35 53 - SECURITY PROCEDURES <br /> PART 1 - GENERAL <br /> 1.1 SUMMARY <br /> ' A. Section Includes: Procedures to maintain security including unauthorized entry, <br /> vandalism, and theft to grounds at Project site. <br /> ' B. Related Sections: <br /> 1. Section 01 31 19 - Project Meetings <br /> 2. Section 01 50 00 —Temporary Facilities and Controls <br /> 1.2 SECURITY PROGRAM <br /> A. Arrange with Owner, at Preconstruction Meeting specified Section 01 3119, to set up <br /> security program to prevent unauthorized entry and to protect against other security <br /> problems, including loss due to theft, vandalism, and fire. <br /> B. Arrange with Owner for access keys as necessary to perform Work of this Contract. <br /> ' 1. Keys Issued by Owner: Do not duplicate. Return to Owner at Final Completion. <br /> 2. Keys not returned: Re-key locks at Contractor's expense and provide new keys <br /> conforming to keying types required by Owner. <br /> C. Establish adequate flood lighting to allow monitoring of Project site during evening <br /> hours. <br /> 1.3 STORAGE AND PROTECTION <br /> Provide for secure lockup of stored materials and take additional measures to <br /> protect against theft vandalism, and other loss of property belonging to Owner <br /> located on site and at off-site facilities. <br /> 1.4 ENTRY CONTROL <br /> A. Restrict entrance of unauthorized persons and vehicles into construction areas. <br /> B. Maintain security of construction fencing and gates as approved by Owner in advance. <br /> Lock at end of each working day. <br /> I <br /> 01 35 53 - 1 SECURITY PROCEDURES <br />
The URL can be used to link to this page
Your browser does not support the video tag.