IO Environmental and Infrastructure Inc Smith Street Cleanup and Fill Project
>
Contracts
>
Capital Contract
>
IO Environmental and Infrastructure Inc Smith Street Cleanup and Fill Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 4:23:30 PM
Creation date
10/18/2019 4:16:56 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IO Environmental and Infrastructure Inc
Approval Date
9/25/2019
Council Approval Date
8/21/2019
Department
Transportation Services
Department Project Manager
Vince Bruscus
Subject / Project Title
Smith Street Cleanup and Fill Project
Total Compensation
$366,191.78
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 72 00 - 10 ' <br /> 3600 Smith Street Clean Up <br /> The Contractor shall submit supplemental working or detail drawings as required for the performance of <br /> the Work pursuant to 2.4. SUBMITTALS. Except as noted, all drawings and other Submittals shall be <br /> delivered directly to the Owner's Representative. The drawings shall be on sheets measuring 22 by 34 <br /> inches, 11 by 17 inches, on sheets with dimensions in multiples of 8 1 /2 by 11 inches, or other size <br /> approved by the Owner consistent with the Work to be detailed. Contractor shall provide drawings far <br /> enough in advance of ordering or installation to allow for review by the Owner's Representative or other <br /> agencies and possible resubmittal and further review after resubmittal. After a plan or drawing has been <br /> reviewed and returned to the Contractor, all changes proposed by the Contractor may be submitted to the <br /> Owner's Representative for review and comment. <br /> The Contractor shall obtain the Owner's Representative's written acknowledgement of approved <br /> Submittals before proceeding with the Work represented by the Submittal. Such review does not impose <br /> any responsibility upon the Owner, nor does it relieve the Contractor of any responsibility for the <br /> accuracy of the Submittal or its conformity with the Contract. The Contractor shall bear all risk and all <br /> costs of any Work delays caused by resubmittal or correction of Submittals. The Contractor shall allow <br /> sufficient time for Owner's review of Submittals and possible corrections by the Contractor so as not to <br /> delay the Work. <br /> The Contractor's Bid price shall include all costs of all Submittals, including, but not limited to, working, <br /> detail and shop drawings. <br /> 4. CONTRACTOR <br /> 4.1. CONTRACTOR'S REPRESENTATIVE <br /> The Contractor shall notify the Owner in writing of the name of the person who will act as the <br /> Contractor's representative and shall have the authority to act in matter relating to this Contract. This <br /> person shall have authority to carry out the provisions of the Contract and to supply materials, Equipment, <br /> tools and labor without delay for the performance of the Work. <br /> Contractor shall employ and keep on Site on a full time basis personnel experienced in the management <br /> of construction of projects of this size and type. These shall include,but not be limited to, a project <br /> manager and superintendent. Neither the Contractor's project manager nor the superintendent shall have <br /> supervisory responsibility for other Projects for the Contractor while assigned to this Project. Contractor <br /> shall employ and assign such additional, full time office, support and engineering personnel to support the <br /> project manager and superintendent and allow timely completion of the Project. The project manager and <br /> superintendent must be approved by the Owner, and such approval shall not be unreasonably withheld. <br /> Contractor acknowledges that one of the instances in which it will be reasonable for the Owner to <br /> withhold consent is if the project manager or superintendent is different than as stated in the Bidder <br /> Qualification Statement. Contractor shall submit personnel qualifications within ten (10) days of <br /> Contractor's execution of the Contract. Bases for disapproval include,but are not limited to, lack of <br /> sufficient experience managing the construction of similar type or size projects or relationships on other <br /> projects unsatisfactory to the Owner. Owner may require removal and replacement of Contractor's <br /> supervisory staff who are disruptive or who appear to lack sufficient competence to complete the Project <br /> successfully. <br /> 4.2. CONSTRUCTION PROCEDURES <br /> The Contractor shall supervise and direct the Work and determine the means, methods,techniques, <br /> sequences and procedures of construction, except in those instances where the Owner, to define the <br /> quality of an item of Work, specifies in the Contract, a means, method, technique, sequence or procedure <br /> for construction of that item of Work. <br /> 4.3. SUBCONTRACTORS <br /> Unless explicitly specified elsewhere in the Contract Documents or expressly authorized in writing by the <br /> Owner before Contractor submits its Bid, the Contractor shall perform with its own organization at least <br /> 00 72 00 - 10 GENERAL CONDITIONS <br />