My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IO Environmental and Infrastructure Inc Smith Street Cleanup and Fill Project
>
Contracts
>
Capital Contract
>
IO Environmental and Infrastructure Inc Smith Street Cleanup and Fill Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 4:23:30 PM
Creation date
10/18/2019 4:16:56 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IO Environmental and Infrastructure Inc
Approval Date
9/25/2019
Council Approval Date
8/21/2019
Department
Transportation Services
Department Project Manager
Vince Bruscus
Subject / Project Title
Smith Street Cleanup and Fill Project
Total Compensation
$366,191.78
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' City of Everett 00 72 00 - 15 <br /> 3600 Smith Street Clean Up <br /> If requested by the Contractor,the Owner will arrange meetings with other contractors performing work <br /> on behalf of the Owner to plan coordination of construction activities. The Contractor shall inform itself <br /> ' of the planned activities of other contractors and will coordinate its work with the other contractors. <br /> Contractor shall notify the Owner of problems, interference or any difficulty with other contractors or <br /> workers engaged by the Owner. The Notice shall be sufficiently prompt and specific so as to allow the <br /> ' Owner to mitigate or avoid increased costs, time of performance, damages or injury. Contractor's failure <br /> to provide such Notice in a timely way shall be deemed a waiver and release of any and all Contract <br /> Claims relating to,arising out of, or caused by, any alleged interference, difficulty or problem with <br /> ' another contractor or worker engaged by the Owner. <br /> 5. PROGRESS AND COMPLETION <br /> 5.1. NOTICE TO PROCEED <br /> Following execution of the Contract by the Owner, the Owner or Owner's Representative will give the <br /> ' Contractor a written Notice to Proceed. Notwithstanding other provisions of the Contract,the Contractor <br /> shall not be obligated to perform Work, and the Owner will not be obligated to accept or pay for Work <br /> performed by the Contractor or be liable for any Delays, prior to delivery of the Notice to Proceed. The <br /> Owner's knowledge of Work being performed prior to delivery of the Notice to Proceed will not obligate <br /> the Owner to accept or pay for such Work. Contractor waives any and all Contract Claims for an <br /> adjustment of Contract Sum and Contract Time arising out of, or related to, work it performs prior to <br /> ' receipt of the Notice to Proceed. The Owner may issue partial Notices to Proceed. <br /> 5.2. CONTRACT TIME <br /> ' 5.2.1. General <br /> TIME IS OF THE ESSENCE IN PERFORMING THE CONTRACT. Failure to complete the <br /> Project within the contractually specified time may affect other Projects and Owner activities. Contract <br /> ' Time starts upon the later of the issuance of the Notice to Proceed or a date specified in the Notice to <br /> Proceed. The Contractor shall promptly start the Work as soon as possible after the date of the Notice to <br /> Proceed and shall prosecute the Work so that the various portions of the Project shall be completed in <br /> accordance with the Contract Time period. Contractor shall perform its work at such times and in such <br /> ' ways that the Work is not damaged by weather such as wind,rain, or snow. Contractor shall correct or <br /> repair at its sole expense any Work damaged by weather, irrespective of whether such damage is covered <br /> by insurance. No portions of the Work where acceptable quality will be affected shall be constructed <br /> while unfavorable conditions exist. By bidding on the Project and executing a Contract to perform the <br /> Work, Contractor agrees the contractually required completion dates are feasible, reasonable, and <br /> achievable for the Contract Sum. Contractor represents that it has considered all factors relevant to its <br /> ' price and achieving the Completion Dates, including, but not limited to, weather, Site access, labor <br /> conditions and the availability of materials, supplies and Equipment. Compliance with 10. NOTICE TO <br /> OWNER, 12. CONTRACT CLAIMS, and 5.2.2. Construction Schedule are conditions precedent to a <br /> request for, consideration of, and grant of, any extension of Contract Time. Failure to request a time <br /> extension in the manner and in the time required by this section, and the Specifications referred to herein, <br /> constitutes a waiver by the Contractor of any and all entitlement to an extension of time and any <br /> ' adjustment of Contract Sum arising out, or related to, such Delay. <br /> 5.2.2. Construction Schedule <br /> 5.2.2.1 General <br /> Contractor shall submit, update and maintain schedules as required by the Contract Documents. <br /> The Contractor shall provide sufficient material, equipment, and labor to meet the interim milestones, <br /> ' Substantial Completion,Physical Completion and Completion Dates provided by the Contract <br /> Documents. The Owner allocates its resources to a Contract based on the total time allowed in the <br /> Contract. The Contractor may submit a schedule indicating Completion Date earlier than the end of <br /> 00 72 00 - 15 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.