Laserfiche WebLink
I <br /> ITABLE OF CONTENTS <br /> SPECIAL PROVISIONS <br /> IINTRODUCTION TO THE SPECIAL PROVISIONS SP-1 <br /> DIVISION 1: General Requirements SP-2 <br /> IDESCRIPTION OF WORK SP-2 <br /> 1-01 DEFINITIONS AND TERMS SP-2 <br /> I 1-01.3 Definitions <br /> 1-02SP-2 <br /> BID PROCEDURES AND CONDITIONS SP-4 <br /> 1-02.1 Prequalification of Bidders SP-4 <br /> I1-02.1 Qualifications of Bidder SP-4 <br /> 1-02.2 Plans and Specifications SP-4 <br /> 1 1-02.4 Examination of Plans, Specifications and Site of Work SP-5 <br /> 1-02.5 Proposal Forms SP-5 <br /> I1-02.6 Preparation of Proposal SP-5 <br /> 1-02.7 Bid Deposit SP-6 <br /> I 1-02.9 Delivery of Proposal SP-7 <br /> 1-02.10 Withdrawing, Revising, or Supplementing Proposal SP-7 <br /> 1-02.12 PUBLIC OPENING OF PROPOSALS SP-8 <br /> 1 1-02.13 Irregular Proposals SP-8 <br /> 1-02.14 Disqualification of Bidders SP-9 <br /> 1 1-02.15 Pre Award Information SP-10 <br /> 1-03 Award and Execution of Contract SP-10 <br /> I 1-03.1 Consideration of Bids SP-10 <br /> 1-03.3 Execution of Contract SP-11 <br /> 1-03.4 Contract Bond SP-11 <br /> 1-03.7 Judicial Review SP-12 <br /> 1-04 Scope of the Work SP-12 <br /> I 1-04.2 Coordination of Contract Documents, Plans, Special Provisions, Specifications, and <br /> Addenda SP-12 <br /> I 1-05 Control of Work SP-13 <br /> 1-05.4 Conformity With And Deviations From Plans And Stakes SP-13 <br /> 1-05.7 Removal of Defective and Unauthorized Work SP-16 <br /> 1 1-05.11 Final Inspection SP-17 <br /> 1-05.12 Final Acceptance SP-19 <br /> 1 1-05.13 Superintendents, Labor and Equipment of Contractor SP-19 <br /> iCITY OF EVERETT SPECIAL PROVISIONS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> STATE FUND#HLP PB17(014); COE WO#PW3688 Page SP-1 <br />