Laserfiche WebLink
I <br /> 1 <br /> 2 Supplement the second paragraph with the following: <br /> 3 4. If a minimum bid amount has been established for any item,the unit or lump sum price <br /> 4 must equal or exceed the minimum amount stated. <br /> 5 5. Any correction to a bid made by interlineation, alteration, or erasure, shall be initialed <br /> 6 by the signer of the bid. <br /> 7 <br /> 8 Delete the last two paragraphs, and replace them with the following: <br /> 9 <br /> 10 If no Subcontractor is listed, the Bidder acknowledges that it does not intend to use any <br /> 11 Subcontractor to perform those items of work. I <br /> 12 <br /> 13 The Bidder shall submit with their Bid a completed Contractor Certification Wage Law Compliance <br /> 14 form, provided by the Contracting Agency. Failure to return this certification as part of the Bid <br /> 15 Proposal package will make this Bid Nonresponsive and ineligible for Award. A Contractor <br /> 16 Certification of Wage Law Compliance form is included in the Proposal Forms. <br /> 17 <br /> 111 <br /> 18 The Bidder shall make no stipulation on the Bid Form, nor qualify the bid in any manner. <br /> 19 <br /> 20 A bid by a corporation shall be executed in the corporate name, by the president or a vice president <br /> 21 (or other corporate officer accompanied by evidence of authority to sign). <br /> 22 <br /> 23 A bid by a partnership shall be executed in the partnership name, and signed by a partner. A copy <br /> 24 of the partnership agreement shall be submitted with the Bid Form if any UDBE requirements are <br /> 25 to be satisfied through such an agreement. <br /> 26 <br /> 27 A bid by a joint venture shall be executed in the joint venture name and signed by a member of the <br /> 28 joint venture. A copy of the joint venture agreement shall be submitted with the Bid Form if any <br /> 29 UDBE requirements are to be satisfied through such an agreement. <br /> 30 <br /> 31 1-02.6.OPT15.GR1 <br /> 32 (August 2, 2004) <br /> 33 The fifth and sixth paragraphs of Section 1-02.6 are deleted. <br /> 34 <br /> 35 Add the following new section: <br /> 36 1 <br /> 37 1-02.6(1) Recycled Materials Proposal <br /> 38 (January 4, 2016 APWA GSP) <br /> 39 <br /> 40 The Bidder shall submit with the Bid, its proposal for incorporating recycled materials into the <br /> 41 project, using the form provided in the Contract Provisions. <br /> 42 <br /> 43 1-02.7 Bid Deposit <br /> 44 (March 8, 2013 APWA GSP) <br /> 45 <br /> 46 Supplement this section with the following: <br /> 47 <br /> 48 Bid bonds shall contain the following: <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> STATE FUND#HLP PB17(014);COE WO#PW3688 Page SP-6 <br />